An Analysis on the Importance of the Risk Factors Considering the Reasons for the Increase of the Subcontract Construction Project Bid Cost (건설프로젝트 하도급 입찰금액 상승요인을 고려한 리스크인자의 중요도에 관한 분석)

  • Lee, Sung-Goo;Shin, Hyun-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.1 s.23
    • /
    • pp.63-70
    • /
    • 2007
  • The aims of this study are to draw the project risk factors by grasping the relation especially between the construction preparation cost calculation and the project risk factors in the project's bidding stage, and to draw the cost estimate based on the risk when the orderer or the constructer performs the project and the main factors in calculating the most suitable construction cost by clarifying the understanding degree of the influence between the risk factors and the construction cost. In addition, this study can give a help to the proper decision -making through the prediction of the construction preparation cost, and this study is expected to give the basic data in developing the assessment tool for the most suitable construction cost of the project.

Cause Analysis of Cost Overruns in International Infrastructure Project Conducted by Korean Contractors (해외토목 원도급사업의 원가상승 원인에 관한 연구)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.105-116
    • /
    • 2017
  • In recent years, large Korean construction companies have suffered serious losses in their overseas business. Many practitioners and researchers have analyzed causes of cost overrun in these projects. However, these arguments have not been empirically verified based on acutal project cases. This study investigated cost overrun rate, contingency, allowance, predicted risk before bidding, and actual and residual risk after award in the 67 international infrastructure projects conducted by 13 large construction companies. The causes of cost overruns are derived as follows. First, they identified the possibility of cost overrun to some extent before the bidding, but did not reflect the enough risk money to bid price. In particular, this behavior was more severe in badly cost-overrun projects. Second, the causes of cost overrun were more influenced by external environmental risk than internal capability risk. However, the internal risk in badly cost-overrun projects was relatively high compared to cost-underrun projects. Third, badly cost-overrun projects failed to mitigate risk. However, cost underrun projects were affected more by low exterior risk conditions than by well mitigated risk. This study provides more informed knowledge in controlling project costs in international infrastructure projects.