• Title/Summary/Keyword: 입찰경쟁

Search Result 188, Processing Time 0.022 seconds

Proposal of a Vender Management System in the Procurement Management of Plant Projects (플랜트 구매조달관리를 위한 공급자관리 시스템 개발 방향 제시)

  • Woo, Ji-Youn;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.991-994
    • /
    • 2007
  • Since the year of 2003, the overseas plant market has grown by an average of 6% per year. It is because of the increase of oil-money, economic growth of BRICs, and the result of heavy competition among the countries which demands a great amount of resources for the purpose of resource securing. Such a situation is expected to be continued for a while. The procurement is one of critical functions for successful completion of a plant project. For effective procurement, it is required to manage vendor's information efficiently. But most of the vendor management systems deal with simple general information and performance data about vendors. In this sense, this paper proposes a vendor management system which can be used within a decision-making system. The system uses existing DB and makes the close relationship with the vendors. This paper will also reduce risks and difficulties in the process of selecting the proper vendors and will increase efficiency of procurement process in electronic bidding between companies.

  • PDF

Electric Power Demand Prospect Pattern System (전력 수요 예측 패턴 시스템 설계)

  • Yu, seung-hyun;Lee, joung-myung;Park, han-ho;Kwak, nae-joung;Lee, hyun-tae;Jeon, jae-sung
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.112-115
    • /
    • 2008
  • Recently, In Korea Electric power Corporation guarantee free using, which separate a class of electric supply with a group of generates electricity and supply, so a market price is decided by demand and supply that take part in a tender. In this treatise predict about demand of power by abstracting a pattern cause it (temperature and economic growth). Also it proposes market price of the best electricity power generation with predicted data that is made database and is showed by Web. The proposed system is increased satisfaction of consumer through smoothness of power supply and demand that rises competitiveness through exactly estimated demand at power supply and demand and supply market will open the future. Moreover consumers can reduce expenses of basic charge. Because they beforehand predict and analyze a mount of power spending with former times so a provider concludes the lowest price and reduction effect of basic charge that needed producing of power.

  • PDF

The Study of Improvements for CM Delivery System by the Analysis of Current CM Regulations and Status (CM 발주제도 및 현황분석에 따른 개선방안에 관한 연구)

  • Kim, Chan-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.4
    • /
    • pp.1962-1967
    • /
    • 2011
  • Construction Management service has been consistently growing in both sales and diversified services. On the other hand the market has been solidified owing to monopoly of major companies and considerations of the services have not been sufficient so that construction management could not play a appropriate role of the construction industry. This research is to suggest the improvements of construction management delivery system based on the analysis of the current market. The method conducted was to analyze market survey, literature and statistical review, regulations, considerations and evaluation system. Through the analysis and research, the delivery system of construction management was proven rooms for improvements in regulation, consideration, and evaluation system. and this study presented those as fair as possible. It is hopefully expected that the expansion of CM market, impartial competition, and justifiable services are implemented in the construction industry.

Behavior in Agricultural Markets under Environmental Uncertainty : A Theoretical Approach Based on von Thunen`s Framework (불확실한 환경조건에서 농업시장의 행동 : 튀넨 모델을 배경으로한 이론적 접근)

  • Lee, Sang-Yool;Mulligan, Gordon F.
    • Journal of the Korean Geographical Society
    • /
    • v.31 no.4
    • /
    • pp.648-661
    • /
    • 1996
  • The traditional von Thunen model has various shortcomings. Perhaps the greatest dificiency is the model's sole emphasis on the production side of the economy;that is, the agricultural markets are rarely closed for demand. In thes paoer a closed model for a three-activity, two-dimensional economy is developed. Equillibrium solutions are generated for prices, land areas, and outputs. Comparative static analysis then follows. Attention is next given to a maximum expected-return model under environmental uncertainty. Land uses for the traditional model and the closed model are then compared.

  • PDF

Strategies for Multilateral Development Banks Utilization to Enhance International Construction Competitiveness (해외건설 수주경쟁력 강화를 위한 다자간개발은행 활용 방안)

  • Sohn, Tae-Hong;Jung, Chang-Goo;Jang, Hyoun-Seung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.493-498
    • /
    • 2012
  • Korean construction companies have maintained stable market share based on high technology and cost competitiveness although international construction market has been stalled due to increasing global economy uncertainties. However, Korean construction companies have relied heavily on the general types of projects in Middle East and Asia although the portion of different types of projects such as Build-Transfer-Operate (BTO), Build-Transfer-Lease (BTL), and Public-Private-Partnership (PPP) has been increasing in the market. When delivering huge projects requiring contractors deal with activities from project planning to operation, securing finance sources and profitability is deemed critical. Therefore, Korean construction companies need more attentions on the construction market supported by Multilateral Development Banks. However, Korean construction companies have not utilized effective strategies for the market entry and also government supportive policies are not useful enough to help construction companies. This study aims both to analyze the contract structure of Korean construction companies for presenting critical factors that need to be prepared and to suggest various methods that can be applied to support construction companies that have much interest in the Multilateral Development Banks. According to the results of study, it is important that Korean government provide structural information system, make a specialized organization, prevent over-heating among Korean construction companies, and collaborate with Official Development Agency. In addition, it appeared that the fairness and financial stability of project have recognized main advantages of the Multilateral Development Banks.

A Study on the Profitability Enhancement of SI Business in Public and Finance Sector (공공(公共)/금융분야(金融分野) SI사업(事業)의 수익성(收益性) 향상(向上) 방안(方案)에 관한 연구(硏究))

  • Joo, Jeong-Soo;Jahng, Jung-Joo;Cho, Hurn-Jin
    • Information Systems Review
    • /
    • v.12 no.1
    • /
    • pp.165-188
    • /
    • 2010
  • Recently public and finance SI (system integration) industry is called as 4D (difficult, dangerous, dirty, dreamless) industry because of low profit, overtime works and poor motivation of employees. Even some people think at SI industry to be a labor intensive industry instead of a high technology industry. The current study considers outside environmental change of SI industry as well as inside capability enhancement of SI companies. The study adopted action research method with the author's expertise and experiences as a head of a major SI company in Korea. The current research framework suggests 5 areas of profitability enhancement that offers propositions and implications. 5 areas of profitability enhancement are (1) policy improvement, (2) business portfolio innovation (3) sales capability reinforcement, (4) delivery capability reinforcement, and (5) cost management innovation. The five areas include 11 propositional factors and 21 implementation plans which were chosen from the profitability perspectives of SI companies.In order to successfully execute propositions and implementation plans of the framework, 3 years is needed and after 3 years profitability are expected to increase 10% higher than the current level. The framework, propositions and suggestions in this study are expected to offer a real contribution for SI companies that want to enhance competitiveness and profitability. Future extension of the current study to benchmarking the competitiveness and profitability between local companies and global companieswill bring a solid attention from industry and academics.

A Study on the Actual Condition of Electrical Construction Supervision and Countermeasure of It (전력시설물공사 감리제도의 현황과 실태분석 및 개선방안에 관한 연구)

  • Seo, Hwang-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.09a
    • /
    • pp.15-17
    • /
    • 2008
  • 본 논문은 현행 전력기술 관리법에 의하여 시행되고 있는 전력시설물공사 감리제도의 제도개선에 관한 연구로서 연구자의 현장 실무경험과 감리제도의 일반사항, 감리업자와 감리원에 대한 사항, 감리업자 선정 및 입찰에 관한 사항을 조사하여 전력시설물공사 감리제도의 현황과 실태분석 및 개선방안을 제시한 내용으로 연구결과는 다음과 같다. 첫째, 법적 및 제도적 측면에서 시급히 개선될 사항이다. 정부는 1995년 12월 법률 제5,132호로 전력기술관리법을 제정하여 전력시설물에 대한 공사감리 업무를 별도 분리 발주하여 전문성을 높이도록 전기 분야 전문기술자에 의해 수행토록 하는 것을 골자로 하는 책임 감리제도를 도입하여 오늘에 이르고 있다. 그러나 공사 준골단계에서 전기사업법 제98조 2항에 의해 위탁업무를 하고 있는 전기 안전공사가 사용전 검사를 함으로서 책임 감리제도의 도입 취지를 무색케 한 정도로 심각한 국면에 접어들었다. 전력기술관리법이 제정되어 13년이 지난 오늘까지도 책임 감리제도가 성공적으로 정착되지 못한 근본적인 문제는 사용전 검사를 전기 안전공사에서 대행하고 있다는 것이다. 물론 그동안의 많은 노력으로 어느 정도의 개선은 있었지만 근본적인 문제가 해결되지 않고서는 전력시설물공사의 감리기술의 전문화를 기대하기 어려운 실정이다. 따라서 책임 감리계도의 성공적인 정착을 위해서는 전기사업법 제98조 2항에 의한 위탁 업무인 사용전 감사 제도를 감리업자에게 돌려줌으로서 책임과 권한을 실질적으로 부여하고 감리회사 자체의 기술력 및 기술자 확보와 기술개발에 필요한 운영자금 및 투자 확대를 유도해 나가야 하며, 무엇보다도 확실한 법적 제도적 뒤받침이 선행되어야 한다. 둘째, 제도적 측면에서 일반건축물은 사업주가 전력시설물공사 감리업자를 임의선정 및 수의계약에 의해 감리업자를 지정하고 해당 공사기간동안 전기 감리원을 투입토록 되어 있어 인건비에 미치지 못하는 저가수주와 다음계약을 위해 어쩔 수 없이 사업주에게 종속되는 경우가 많으며, 이로 인해 감리수행에 혼란이 야기되고 책임소재의 불분명 책임 감리원의 조정 및 통제기능이 약화되는 부작용이 나타나고 있다. 전력시설물공사의 감리는 전력시설물의 안전사고, 비효율 및 부실소지 둥을 방지하기 위해서 필수적이고 발주자 감리업자 시공업체에게 모두 도움을 주는 업무이며, 일정규모이상의 건축물은 자발적인 참여로 유도할 수 있도록 적격심사제도(PQ심사)도입이 적극 필요한 실정이다. 셋째, 운용측면에서 공동주택의 주택법에 의한 전력시설물공사 감리는 사업승인권자가 사업수행능력 평가기준(PQ 심사)에 따라 감리업자를 지정하고 해당 공사기간 동안에 전기 감리원을 투입토록 되어 있으나 평가기준이 세대수에 따라 정해져 있어 효율적, 기술적 측면에 미치지 못하는 경우가 많다. 수준 높은 감리를 수행하려면 그에 맞는 적정한 감리원의 투입이 필수적이다. 넷째, 운용 및 제도적 측면에서 공공발주 건축물(공동주택 포함)의 전력시설물공사는 사업수행능력 평가기준(PQ 심사)에 따라 감리업자를 지정하고 해당 공사기간 동안에 전기 감리원을 투입토록 되어 있으나 발주자 소속직원의 감리수행 근거에 의해 자체 감리를 함으로서 시장경쟁 및 민간경제 활성화의 제약, 부정부패 및 비효율 등 사회에 전반적으로 악영향을 끼쳐 하루 빨리 민간 감리업자에게로의 개선이 시급한 실정이다.

  • PDF

Resource Circulation Plan using Material Flow Analysis of Waste Metals of Cobalt and Palladium (코발트와 팔라듐 폐금속자원의 흐름분석을 통한 자원순환 활성화 방안)

  • Lee, Hi Sun;Lee, Jeongmin;Yi, Sora
    • Resources Recycling
    • /
    • v.27 no.1
    • /
    • pp.14-21
    • /
    • 2018
  • The rapid increase in the consumption of products that contain rare metals has highlighted the importance of recycling and recovering resources from these products when they enter the waste stream. Among various metal resources that can be recovered, this study analyzes the waste streams of cobalt and palladium to determine how their waste resource circulation can be improved at each stage of the waste stream. The findings of this study point to improvements and strategies that can be made at individual stages. First, at the discharge/import stage, the implementation of tariff quotas for specific recycled metal resources is suggested to allow the systemic categorization of waste metals as resources. At the collection/discarding stage, a major problem is the instability in the supply of scrap metals, which may be better managed by changing the bidding process for the scrap metals. At the pretreatment stage, possible areas for improvement are uncovered concerning technical areas, such as technological development and improving the efficiency of material recycling, as well as policy-wise, for instance, expanding the regulation for manufacturers to produce products that are designed to facilitate resource recovery, increasing incentive for closed recycling, and refining the guidelines and standards for recycling. At the resource recovery stage, as the waste metal recycling industry consists of businesses that vary in size, policies to promote cooperation and coexistence between large and smaller enterprises will benefit the industry in the long-run. Lastly, at the product production/export stage, a tariff on exporting waste resources that contain cobalt and palladium will help control the amount of waste metals that are shipped abroad.

Introducing Contract-out in the Policing Service : Focusing on Policing segregated System (치안서비스의 민간위탁 도입에 관한 연구 : 치안분업모델을 중심으로)

  • Choe, Jung-Taek
    • Korean Security Journal
    • /
    • no.12
    • /
    • pp.309-333
    • /
    • 2006
  • These days, the majority of public service area presents increment of utilizing a contracting-out with the following reasons such as cost-efficiency, maintenance of population changes in flexible manner, and convenience of management. The social changes have influence on policing structure and regional security system as well as problems associated with accepting the contracting-out in the public policing sector. However, many issues such as limited contracting-out sector, difficulty of encouragement of participation to private sector, and limitation of making a contract with contracting-out would be brought up when initiate contracting-out to the public policing sector. Changing security system to lower budget, planning restructure of organization, developing alterable partial contracting-out, establishing private and public cooperate system and rationalizing contract system are the suggestions to solve and modify the raising problems. This study suggests a differentiate regulation of policing services compare to currently existing contracting-out method to consider a distinctive working environment. The suggestions are as follows: 1. develop a security segregate model, 2. build a cooperative system between private and public policing sector, 3. broaden opportunity of participation of private policing sector, 4. open-competition among qualified private tender to make a contract. The private contracting-out in the public security service sector should be manage in different manner compare to other private contracting-out in government-oriented public service sector. Since work performance of each private contracting-out agency is strongly bond to safety of every civilian in the nation, it is essential to increase its standard of qualification of each agency.

  • PDF

Influencing Factors on the Duration of Offset Agreement (절충교역 계약 소요기간 영향요인)

  • Hong, Seok-Soo;Joung, Tae-Yun;Seo, Jae-Hyun;Hong, Moon-Hee
    • Journal of Technology Innovation
    • /
    • v.20 no.1
    • /
    • pp.1-15
    • /
    • 2012
  • Republic of Korea has been applying offset to defense acquisition program for some benefits such as modernization of defense industry and enhancement of R&D capabilities since 1983. But in point of implementation, there is the possibility of delay of offset agreements based on the value of proposed technologies. As it often happens that the delay of offset agreement negatively affects the time schedule of main defense deal, it is necessary to prepare for this issue. The purpose of this study is to extract some factors affecting the duration of offset agreement by statistical analysis. Reviewing existing papers and contract process, nationality of enterprise, the number of project participants, properties of project, the number of technologies in the first proposal, level of domestic defense technology in each weapons system, the amount of main contract were used as independent variable and duration of agreement as dependent variable. To hypothesis testing, correlation and multiple regression analysis were conducted using the previous 25 contract cases. As a result of correlation analysis, the amount of main contract, the number of technologies in the first proposal and properties of project have positive relationships with dependent variable. In multiple regression, the amount of main contract and the number of project participants have significant effect on the duration of offset agreement.

  • PDF