• Title/Summary/Keyword: 이음부 결함

Search Result 142, Processing Time 0.024 seconds

Evaluation of Structural Behavior of Connections in Precast Arch Structures (프리캐스트 아치구조의 이음부 구조 거동 평가)

  • Shim, Chang Su;Kim, Dong Chan;Choi, Dae;Jin, Kyung Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.747-756
    • /
    • 2016
  • In this paper, a connection details for precast arch structures was proposed. Experiments were performed to evaluate structural performance of the loop connection details satisfying current design requirements and of alternative details for improvement of constructability. Precast arch specimens considering the current design requirements showed higher structural capacity than a cast-in-place arch specimen. Crack width at the connection of arch crown showed smaller value than 0.2 mm due to increased compression force by the applied vertical load. Strengthening by wire-mesh at notch area of the connection improved initial crack control capability. Connection detail with couplers and headed bars showed similar capacity to the reference specimen. The alternative details to improve constructability of reinforcements can be used without decreasing structural performance. Specimens with smaller internal diameter of mandrel and shorter loop splicing than the current design codes showed worse behavior in terms of crack width control.

Measurement of Verticality and Joint Gaps of a Near-surface Disposal Facility Vault Through a Mock-up Test for Fill-up Stages (표층처분시설 처분고의 목업테스트를 통한 채움단계별 수직도 및 이음부 벌어짐 측정)

  • Choi, Dong-Ho;Ann, Ki-Yong;Choi, In-Yong;Lee, Hyuk-Jin
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.4
    • /
    • pp.537-544
    • /
    • 2021
  • In order to describe the fill-up stages of a near-surface disposal facility vault, a mock-up test is performed, and its behavior during the fil l -up stages is investigated. On an in-site concrete foundation with a l ength of 6600mm, a width of 6600mm and a thickness of 400mm, a reinforced concrete disposal vaul t is manufactured with 4 precast (PC) corner wal l s and 8 PC side wal l s. 36 wasted drums are pl aced on the 1st fl oor in 6 by 6, and then the empty space is fil l ed with grout fil l er. These processes are repeated up to the 5th floor, and the verticality and the joint gaps are measured for each fill-up stage. The verticality is measured using a level at 6 positions on each side wall (3 positions on the left and right sides, respectivel y), i.e. a total of 24 positions on the 4 side wal l s. The joint gaps are measured at 9 positions on each side wal l (3 positions on the left, center and right sides, respectively), I.e. a total 36 positions on the 4 side walls. To measure the joint gaps, crack tips are installed on the left and right sides of every joint gap, and vernier calipers are used. The measured verticality obtained through the mock-up test was found to be ±0.1° based on the initial stage (ST0), and the result of the joint gap was up to 0.38mm. This appears to have a negligible effect on the structure.

A Study on the Slip Behavior of Coated High Tension Bolted Joints (도장처리한 고장력볼트 연결부의 미끄러짐 특성에 관한 연구)

  • Kyung, Kab Soo;Lee, Seung Yong;Kim, Ki Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5A
    • /
    • pp.691-697
    • /
    • 2008
  • Coating the high tension bolted frictional joint has been generally allowed for anti-corrosion purpose. However in case of painting on paying surface of the high tension bolt, the influence on a slip strength of the joint depending on precision of painting has remained controversial. The study thus was intended to identify the slip behavior on high tension bolted frictional joint when applying ceramic painting, which has been currently developed. A slip test was conducted on a high tension bolted frictional joint specimen on which ceramic painting has been applied and a slip load and slip coefficient were measured. Based on result, the safety and usability of ceramic painting-applied high tension bolted frictional joint was evaluated. As a result, a difference to some extent by specimen in terms of load-displacement when a slip occurred was observed but an average slip coefficient appeared to have exceeded 0.4, which is the design frictional coefficient set forth in the specification. To secure the safety and usability of ceramic painting-applied high tension bolted frictional joint, it's necessary to establish the standard for painting as well as to revise the relevant specification.

A Study on the Ignition Distance from a Leakage Point of the LP Gas Pipe (LP 가스 배관의 누출부로부터 점화가능 거리에 관한 연구)

  • Ryou, Young-Don;Kim, Young-Gu;Jo, Young-Do
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.5
    • /
    • pp.70-76
    • /
    • 2017
  • The standards related to the "Urban Gas Business Act" and the "Safety Control and Business Regulation of Liquefied Petroleum Gas Act" prescribe the separation distance between gas piping joint excluding welded joints and electric equipments(electric switch, watt meter, breaker, connector, etc). The "Korea Electro technical Regulation" also prescribes the distance between gas piping joints and electric equipments in accordance with the gas related standards. In case of the standards related to the "Urban Gas Business Act", the distance criteria stipulated in the standard of supplying facilities are different from those stipulated in the standard of using facilities. In this study, we have conducted pilot test on the possible ignition distance from the piping joint when LP gas is leaked from the point. We have also examined the adequacy of current standards on the separation distance between gas piping joint and electric equipments. As a result of the tests, we have found that ignition is able to occur at a distance of 30 cm as stipulated in the current standards or more when LP gas is leaked from the joint of the pipe. Therefore, we have made a decision that the criteria for separation distance between gas piping joint and electric equipment specified in the current standards related to the "Urban Gas Business Act" and the "Safety Control and Business Regulation of Liquefied Petroleum Gas Act" is appropriate.

Analysis on Shapes of Shear Pocket for the Full-Depth Precast Slab (프리캐스트 바닥판의 전단포켓 형상에 관한 해석 연구)

  • Han, Sang Yun;Lee, Man Seop;Lee, Seung Rok;Kang, Young Jong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5A
    • /
    • pp.817-822
    • /
    • 2006
  • Post-tensioning the full-depth precast slab longitudinally is to eliminate the tensile stresses in the transverse joints and to prevent any leakage through the joints. When the prestressing is applied to full-depth precast slab which does not composite steel girder, stress concentration occurs at the corners of shear pocket, and compressive stress is not uniformly distributed in the section of precast slab. In this paper, full-depth precast slabs using four different shapes of shear pockets are analyzed by commercial finite element program. Round type of shear pockets is superior to reduction in stress concentration.

Residual Stress Distribution on the Fillet Weldment used by Finite Element Method (유한요소법을 이용한 필렛용접 이음부의 잔류응력분포)

  • Kim, Hyun Sung;Woo, Sang Ik;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.2 s.45
    • /
    • pp.197-207
    • /
    • 2000
  • A transient heat transfer analysis and thermo-elastic analysis have been performed for the residual stress distribution on the fillet weldment used by finite element method. Specimen is fabricated single-pass fillet welding. This computation was performed for conditions including surface heat flux and temperature dependent thermo-physical properties using by heat input as parameter. Also, cut-off temperature of residual stress estimation by thermo-elastic analysis is determined. The fillet weldment were measured to determined their residual stress distributions for using hole-drilling method. As result, it was found that large tensile residual stress is about material yield strength, and the numerical simulation results for finite element method similar to residual stresses by hole-drilling method and other exiting research. Also, cut-off temperature is effectively determined by temperature which calculated maximum thermal stress equal to material yield strength.

  • PDF

Air-tightness Evaluation of Tube Structures for Super-speed Tube Railway Systems: II. System Test and Parametric Analysis (초고속 열차 시스템을 위한 튜브 구조물의 기밀성 평가 : II. 시스템 실험 및 파라메터 해석)

  • Park, Joo-Nam;Kim, Lee-Hyeon;Nam, Seong-Won
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.2
    • /
    • pp.151-159
    • /
    • 2011
  • This study performed an experimental study for air-tightness performance evaluation of concrete tube structures with joints. The test specimens consist of a continuous concrete tube, a concrete tube with a joint in the middle, and a segmented concrete tube. The test is performed in such a way that the inner pressure of the tube is dropped down to 0.1atm and the increase of the pressure is monitored with time. An equivalent air permeability is then calculated based on the test results. The results show that, as expected, a structure with more joints or bonds tends to be less air-tight. A sensitivity study shows that the system air-tightness performance level becomes higher as either the diameter or the thickness of the tube increases. Moreover, the increase in the diameter or the thickness of the tube makes an effort to enhance the air-tightness more effective.

Extraction of Expansion Length for Expansion Jiont Bridge using Imagery (영상을 이용한 교량 신축이음부의 신축량 추출)

  • Seo, Dong-Ju;Kim, Ga-Ya
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.4
    • /
    • pp.139-149
    • /
    • 2008
  • A load effect by vehicles running on a road and an increase of traffic is distinguished as a serious issue in the level of bridges' maintenance and management since it causes a quick damage of bridges. The expansion joint is the most important since it makes vehicles' traveling amicable and stress or additional load harmful to molding patterns minimized. However, it is very difficult to measure its expansion length since vehicles continue to pass on the expansion joint. Therefore, the study could see that it was possible to carry out a qualitative and quantitative maintenance and management if its expansion length is extracted with images. The study could acquire three dimensional coordinates of expansion joints with images. As the results of calculating RMSE of check point residual at 32 points in A area and at 28 points in B area, both A and B areas had very good results of RMSEsms 0.829mm~1.680mm. As the results of analyzing expansion length and immediate value extracted by images, the study analyzed that RMSE of A area was 0.64mm and RMSE of B area was 0.28. The average residual of A area was 0.60% and the average rresidual of B area was 0.27%. Therefore, it is judged that it is more scientific and efficient than the past to measure expansion length with images at the time of repairing and managing bridges in the future.

  • PDF

Effect of the Pipe Joint on Structural Performance of a Single-span Greenhouse: A Full-scale Experimental and Numerical Study (파이프 이음부가 단동온실 구조성능에 미치는 영향: 실대형 실험적 및 해석적 연구)

  • Shin, Hyun Ho;Ryu, Hee Ryong;Yu, In Ho;Cho, Myeong Whan;Seo, Tae Cheol;Kim, Seung Yu;Choi, Man Kwon
    • Journal of Bio-Environment Control
    • /
    • v.30 no.4
    • /
    • pp.410-418
    • /
    • 2021
  • This study was conducted in 8.2m wide single-span greenhouse to investigate the effect of presence or absence of rafter steel pipe joint and foundation conditions on greenhouse structural performance. Structural performance was evaluated by static loading test using the structural performance evaluation system for single-span greenhouse. The measured displacement was compared with the predicted result by numerical analysis. The displacement of each measurement location showed a significant difference regardless of the conditions of the foundation and presence or absence of rafter steel pipe joint. Compared to the hinge conditions, the difference in structural performance of the greenhouse in the fixed conditions was seen to be relatively large. The difference in structural performance according to presence or absence of rafter steel pipe joints, the lateral stiffness of the joint was 8.1% greater.

Connection Resistance of Mechanical Joint using Connection plate for Improvement of Connectivity between PHC piles (PHC파일간 연결 시공성 개선 이음판형 기계적 연결부의 연결저항)

  • Ahn, Jin-Hee;Moon, Hong-duk;Ha, Min-Gyun;Cho, Kwang-Il
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.7
    • /
    • pp.25-32
    • /
    • 2019
  • Welded joints and mechanical joints using bolt connection have been used as a pile-to-pile connecting method for PHC piles. These PHC pile joint methods may have difficulty in securing connecting quality and connecting performance in PHC pile joining process. Therefore, this study proposes a non-welded connection plate type mechanical PHC pile joint to improve the disadvantages of existing PHC pile connection methods and to secure the connection performance of PHC pile joint. Its connection performance was evaluated from nonlinear FE analysis and loading tests for actual PHC piles with suggested pile joints. From nonlinear FE analysis for the proposed PHC pile joint, it was evaluated to have sufficient connection performance under flexural, compressive, tensile, shear, and eccentric compressive load condition. PHC piles connected by the suggested connection plate type mechanical PHC pile joint show that they show stable linear behaviors for the crack moment and the flexural moment level of the PHC pile. Therefore, the proposed a non-welded connection plate type mechanical PHC pile joint can secure sufficient connection performance in PHC pile.