• Title/Summary/Keyword: 육상 교량

Search Result 22, Processing Time 0.025 seconds

Case history of electrical resistivity survey at the river for bridge design (장대교량 기초 설계를 위한 수륙혼합 전기비저항탐사 사례)

  • Chung Ho-Joon;Kim Jung-Ho;Kwon Hyoung-Seok;Ahn Hee-Yoon;Kim Ki-Seog
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2002.09a
    • /
    • pp.126-138
    • /
    • 2002
  • Designing the bridge with wider span is the present-day trends. Therefore, constructing the foundation on the suitable ground is one of the important factor for the safety of bridge. But, getting a subsurface information under the river is not easy problem. This paper shows results of electrical resistivity survey at the river. Electrical resistivity survey have revealed geoelectrical structure successfully. The result is well matched with boring and can provide useful information on the geological structure such as fault fracture zone for suitable location of foundation. It is expected that application of electrical resistivity survey at the river will be helpful in preventing modification of design due to unexpected ground condition during the construction, or water contamination and increment of costs accompanied with ground reinforcement.

  • PDF

A Study on the Analysis of Ship Handling Simulation about Domestic Sea Bridge over the Harbor (국내 항만횡단 해상교량 관련 선박조종시뮬레이션 분석)

  • Lee, Yun-Sok;Cho, Ik-Soon;Cho, Ju-Hyun;Song, Chae-Uk
    • Journal of Navigation and Port Research
    • /
    • v.32 no.5
    • /
    • pp.321-326
    • /
    • 2008
  • Recently the large sea bridge's construction crossing harbor and main ship's route have been propelled in the domestic so that it is active for the smoothly traffic flow of inland transportation and road user's convenience. However, it can bring about the trouble to ensure marine traffic safety if it is built that sea bridge's construction sets to an economy principle in the extension of the land road system. We're adopting Ship Handling Simulation in representative method for the influence assessment of marine traffic safety and danger elements beforehand. This research attempts to show the problems through the comparison and analysis of the reports relating to the sea bridge construction for 4 organization possessing Ship Handling Simulation. Finally, We offer the necessity of standardization on performing and assessment method of simulations.

A Study on Consideration Factors of Traffic Safety Assessment on the Bridge Design-I. (해상교량 건설을 위한 선박통항 안전성 검토요소에 관한 연구-I.)

  • Park, Young-Soo;Park, Jin-Soo;Ko, Jae-Yong;Jong, Jae-Yong;Lee, Eun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.04a
    • /
    • pp.189-195
    • /
    • 2004
  • Recently, bridge design and/or construction works on marine traffic route are undertaking in Korean waters. Naturally the ship-handling difficulty and hazardous to navigation should be increased when the bridge is constructed on the shipping route. Unfortunately, however, it is impossible or not desirable to secure wide enough bridge span width due to geographical condition or economic point of view. Therefore this study aims to propose the consideration factors during the bridge design process, and the traffic volume control, speed limit and other alternative measures to secure traffic safety using marine traffic flow simulation technique.

  • PDF

Integrated Approaches to Berth Productivity Improvements in Port Development and Operation and Logistics : A Conceptual Perspective (항만개발.운영과 로지스틱스에 있어서 부두생산성 향상에 대한 종합적 접근법 : 개념적 관점)

    • Journal of Korean Port Research
    • /
    • v.11 no.1
    • /
    • pp.85-99
    • /
    • 1997
  • The improvements of berth productivity is closely related to berth/port systems and its relationship extends to the overall pattern of port development/logistics, transport and trade. Since ports in general and berths in specific function as a bridge transferring seaborne cargoes from seaside to landside and vice versa, berth productivity improvements should be considered in terms of the total system in which the cargoes are transported from origin to destination via berths/ports. In that respect, the objective of this study is to improve berth productivity which is a vital factor in the strategic planning in port development and operation and logistics. According to a literature survey on the subject, the contents of the studies have been limited to either a macro-perspective or a micro-perspective which is only a partial solution to the problem. Hence, this limitation requires an integrated approach to find and ultimate solution, which should be considered not separately, but as a whole. The contents and scope of this study cover the improvements of berth productivity in conjunction with strategic planning in port development. efficient operation and logistics from two different viewpoints, macro- and micro-perspective. After that, a combination of these two perspectives is applied to the integrated approach due to lacking a comprehensive perspective from either macro-approach or micro-approach. In reality, a port itself is a complex and dynamic organization. Therefore, a comprehensive insight needs an integrated approach for the long-term national economic development. In this approach, the utmost importance is how to find the bottlenecks and to solve the problems effectively from the beginning stage in port development. In conclusion, derived from the macro- and micro-perspective. the attempt to establish an integrated approach is the merit of this study, which is required as a comprehensive measure since none of the two can be a solution independently. In terms of reinforcing this study, it needs further empirical research due to the restriction of the theoretical method of this paper. Consequently, the reinforced research will be able to enhance the integrated approach on the basis of the conceptual perspective.

  • PDF

A Study on the Measurement of End Bearing Capacity for Large Diameter Drilled Shaft Constructed in Fault Zone Using the Static Bi-directional End Leading Test (양방향 선단재하시험을 이용한 단층파쇄대에 시공된 대구경 현장타설말뚝의 선단지지력 측정 연구)

  • 정창규;정성민;황근배;최용규
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.5
    • /
    • pp.135-143
    • /
    • 2004
  • In the land section of marine bridge construction site, to confirm the end bearing of large diameter drilled shaft constructed in the fault zone which was discovered unexpectedly, the hi-directional end loading tests were performed. The objectives of this study are to confirm the end bearing of the pile constructed in fault zone and the increasing effect of end bearing after grouting the base ground beneath the pile toe. After grouting the pile base ground, the settlement of pile base decreased considerably and the pile base resistance increased more than twice.

A Study on the DC Resistivity Method to Image the Underground Structure Beneath River or Lake Bottom (하저 지반특성 규명을 위한 수상 전기비저항 탐사에 관한 연구)

  • Kim Jung-Ho;Yi Myeong-Jong;Song Yoonho;Choi Seong-Jun;Lee Seoung Kon;Son Jeong-Sul;Chung Seung-Hwan
    • Geophysics and Geophysical Exploration
    • /
    • v.5 no.4
    • /
    • pp.223-235
    • /
    • 2002
  • Since weak Bones or geological lineaments are likely to be eroded, there may develop weak Bones beneath rivers, and a careful evaluation of ground condition is important to construct structures passing through a river. DC resistivity method, however, has seldomly applied to the investigation of water-covered area, possibly because of difficulties in data aquisition and interpretation. The data aquisition having high quality may be the most important factor, and is more difficult than that in land survey, due to the water layer overlying the underground structure to be imaged. Through the numerical modeling and the analysis of a case history, we studied the method of resistivity survey at the water-covered area, starting from the characteristics of measured data, via data acquisition method, to the interpretation method. We unfolded our discussion according to the installed locations of electrodes, ie., floating them on the water surface, and installing them at the water bottom, because the methods of data acquisition and interpretation vary depending on the electrode location. Through this study, we could confirm that the DC resistivity method can provide fairly reasonable subsurface images. It was also shown that installing electrodes at the water bottom can give the subsurface image with much higher resolution than floating them on the water surface. Since the data acquired at the water-covered area have much lower sensitivity to the underground structure than those at the land, and can be contaminated by the higher noise, such as streaming potential, it would be very important to select the acquisition method and electrode array being able to provide the higher signal-to-noise ratio (S/N ratio) data as well as the high resolving power. Some of the modified electrode arrays can provide the data having reasonably high S/N ratio and need not to install remote electrode(s), and thus, they may be suitable to the resistivity survey at the water-covered area.

Experimental Study on the Wake Characteristics of a Perforated Vertical Wall with Gap in the 2-Dimensional Flow (2차원 흐름 중에 놓인 틈새를 갖는 수직벽 후류 특성에 관한 실험적 연구)

  • Jo Dae-Hwan;Oh Kyoung-Gun;Lee Gyoung-Woo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.135-140
    • /
    • 2005
  • There are cofferdam and watertight wall to prevent of circulation or pollution during building of ocean structures like a dam and bridge in the harbors area and the sea. Inflow fluid and base of structure is important thing as one of the structural design factors for this interception wall like a cofferdam and watertight wall. In this study, it is revealed that at least 500 instantaneous velocity field data are required for ensemble average to get reliable turbulence statistics. The turbulent shear flow around a surface-mounted vertical wall was investigated by using the two-frame PIV(CACTUS 3.1) system and Mean velocity distributions have also been measured in the whole flow field.

  • PDF

DC Resistivity method to image the underground structure beneath river or lake bottom (하저 지반특성 규명을 위한 전기비저항 탐사)

  • Kim Jung-Ho;Yi Myeong-Jong;Song Yoonho;Cho Seong-Jun;Lee Seong-Kon;Son Jeongsul
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2002.09a
    • /
    • pp.139-162
    • /
    • 2002
  • Since weak zones or geological lineaments are likely to be eroded, weak zones may develop beneath rivers, and a careful evaluation of ground condition is important to construct structures passing through a river. Dc resistivity surveys, however, have seldomly applied to the investigation of water-covered area, possibly because of difficulties in data aquisition and interpretation. The data aquisition having high quality may be the most important factor, and is more difficult than that in land survey, due to the water layer overlying the underground structure to be imaged. Through the numerical modeling and the analysis of case histories, we studied the method of resistivity survey at the water-covered area, starting from the characteristics of measured data, via data acquisition method, to the interpretation method. We unfolded our discussion according to the installed locations of electrodes, ie., floating them on the water surface, and installing at the water bottom, since the methods of data acquisition and interpretation vary depending on the electrode location. Through this study, we could confirm that the dc resistivity method can provide the fairly reasonable subsurface images. It was also shown that installing electrodes at the water bottom can give the subsurface image with much higher resolution than floating them on the water surface. Since the data acquired at the water-covered area have much lower sensitivity to the underground structure than those at the land, and can be contaminated by the higher noise, such as streaming potential, it would be very important to select the acquisition method and electrode array being able to provide the higher signal-to-noise ratio data as well as the high resolving power. The method installing electrodes at the water bottom is suitable to the detailed survey because of much higher resolving power, whereas the method floating them, especially streamer dc resistivity survey, is to the reconnaissance survey owing of very high speed of field work.

  • PDF

Collapse Analysis of Ultimate Strength Considering the Heat Affected Zone of an Aluminum Stiffened Plate in a Catamaran (카타마란 알루미늄 보강판의 열영향부 효과를 고려한 최종강도 붕괴 해석)

  • Kim, Sung-Jun;Seo, Kwang-Cheol;Park, Joo-Shin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.26 no.5
    • /
    • pp.542-550
    • /
    • 2020
  • The use of high-strength aluminum alloys for ships and of shore structures has many benefits compared to carbon steels. Recently, high-strength aluminum alloys have been widely used in onshore and of shore industries, and they are widely used for the side shell structures of special-purpose ships. Their use in box girders of bridge structures and in the topside of fixed platforms is also becoming more widespread. Use of aluminum material can reduce fuel consumption by reducing the weight of the composite material through a weight composition ratio of 1/3 compared to carbon steel. The characteristics of the stress strain relationship of an aluminum structure are quite different from those of a steel structure, because of the influence of the welding[process heat affected zone (HAZ). The HAZ of aluminum is much wider than that of steel owing to its higher heat conductivity. In this study, by considering the HAZ generated by metal insert gas (MIG) welding, the buckling and final strength characteristics of an aluminum reinforcing plate against longitudinal compression loads were analyzed. MIG welding reduces both the buckling and ultimate strength, and the energy dissipation rate after initial yielding is high in the range of the HAZ being 15 mm, and then the difference is small when HAZ being 25 mm or more. Therefore, it is important to review and analyze the influence of the HAZ to estimate the structural behavior of the stiffened plate to which the aluminum alloy material is applied.

Hydrodynamic Analysis of Submerged Floating Tunnel Structures by Finite Element Analysis (유한요소해석을 통한 해중터널의 유체동역학 해석)

  • Kim, Seungjun;Park, Woo-Sun;Won, Deok-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.955-967
    • /
    • 2016
  • As transportation systems for connecting lands and islands, oversea long-span bridges, underwater tunnels, and immersed tunnels have been mainly used so far. Submerged floating tunnels (SFTs) moored under specific water depth are one of the newest oversea transportation system. Compared to other existing systems, the new system requires relatively less construction cost and time. But, there is still no construction example. For reasonable design of the tunnel and mooring lines the rational structural analysis should be firstly performed. Unlike common transportation structures, the submerged tunnels are mainly affected by the wave, vary irregular excitation component. So, the analysis scheme might be difficult because of the characteristics of the submerged structures. This study aims to suggest the rational global performance analysis methodology for the submerged tunnels. Using ABAQUS the dynamic response of the experimental models studied by KIOST (2013) was investigated considering regular waves. By comparing the simulation results with the experimental results, the feasibility of the numerical simulation was verified. Using the suggested method, the effects of initial inclination of the tethers and draft of the tunnel on the dynamic behavior were studied. In addition, dynamic response of a SFT under the irregular wave was examined.