• Title/Summary/Keyword: 요구분석기법

Search Result 2,768, Processing Time 0.033 seconds

An Integrated Requirements Analysis Method based on Goal and Scenario (목표와 시나리오 기반의 통합적 요구 사항 분석 방안)

  • 김진태;김동선;박수용
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.5
    • /
    • pp.543-554
    • /
    • 2004
  • In Requirements engineering, requirements elicitation and analysis are very important tasks to develop software systems successfully. Even though various methods have been proposed including scenario-based analysis, goal based analysis, and coupling goal with scenario, each method has its own strengths and weaknesses. If you use only one method, it is very difficult to elicit and to analyze system requirements completely. Since these methods don't support a comprehensive elicitation process, this paper proposes an integrated approach. This integrated approach is focused on two viewpoints. One is what factors are comprised and the other is how they are integrated. This paper also shows how the proposed approach can be applied to Meeting Reservation System (MRS) development. An experiment has been conducted using this approach to demonstrate how complete requirements are elicited and analyzed and to show relative time savings during elicitation in comparison to each method.

요구사항 분류 언어를 통한 반 자동 품질 요구사항 분류

  • Park, Su-Yong;Min, Seong-Gi;Choe, Sun-Hwang
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.127-133
    • /
    • 2003
  • 시나리오 형태의 요구사항 분류는 ATAM, SAAM, Software Quality Metric 과 같은 품질 요구사항 분석 및 평가 방법 등 많은 분야에 응용된다. 이들 기법들은 소프트웨어 시스템의 품질 요구사항을 분석, 평가하기에 앞서 초기 수집된 요구사항들을 분류하게 된다. 그러나 요구사항을 분류하는 일은 수작업을 통해 이루어지게 되고, 따라서 미 분류, 중복분류, 등의 결함을 가질 수 있다. 결함의 가능성을 요구사항의 수가 많은 대형 프로젝트 일수록 높아지게 된다. 따라서 본 논문에서는 요구사항 분류언어를 통한 품질 요구사항 자동 분류 기법을 제안한다. 제안된 기법은 분류언어와 유사도를 이용한 2 단계 분류기법을 이용하였다. 분류언어는 각 도메인별로 개발되어 비슷한 도메인일 경우 재사용될 수 있다. 이를 검증하기 위해, 본 논문에서는 15 여개의 프로젝트로부터 수집된 요구사항을 이용해 실험을 수행하고 그 결과를 분석, 평가 하였다.

  • PDF

Utilization Demand Analysis: An Integrated Admission Control Approach for a Mixed Set of Periodic and Aperiodic Tasks (이용율 요구 분석: 주기와 비주기 혼합 태스크 집합에 대한 통합 수락 제어 기법)

  • 박정근;유민수;홍성수
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2004.04a
    • /
    • pp.97-99
    • /
    • 2004
  • 본 논문에서는 주기와 비주기 실시간 태스크가 혼합된 태스크 집합에 대하여 이용율 요구 분석(utilization demand analysis)에 기반한 수락제어 기법을 제안한다. 이용율 요구는 혼합 태스크 집합의 모든 태스크가 종료시한 내에 수행을 마치기 위한 프로세서의 이용율로 정의된다. 본 논문에서는 비주기 태스크 집합과 주기 태스크 집합 각각의 이용율 요구를 정의하고 혼합 태스크 집합에 대한 이용율 요구 분석 기법을 제공한다. 제안된 기법은 비주기 태스크에 대한 이용율 요구를 재귀적으로 계산하여 태스크의 수락여부를 결정한다. 이러한 기법은 O(n)에 스케줄링 분석을 수행하고 복잡한 자료구조가 필요하지 않아서 실시간 수락제어를 가능하게 한다.

  • PDF

Proposal of requirements analysis process that using the concept of macrostructure (거시구조 개념을 이용한 요구사항 분석 프로세스 제안)

  • Kwon, Ye-Jin;Jung, Hyo-Jin;Yoon, Eun-Ji;Park, Yong-Bom
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.172-174
    • /
    • 2012
  • 요구사항은 소프트웨어 아키텍처 설계의 핵심 요소로서, 아키텍처의 구축과 생성의 근거를 제시해준다. 이러한 요구사항 분석을 위해 다양한 요구사항 분석 방법이 제안되고 있는데 그 중 대표적인 기법은 시나리오 기반의 분석, 목표 기반의 분석, 시나리오를 이용한 목표기반의 분석이다. 그러나 이러한 요구사항 분석 방법들은 정형화되어 있지 않아 요구사항을 분석하는 아키텍트에 의존할 수밖에 없다. 따라서 본 논문에서는 텍스트학을 기반으로 정형화된 기법인 거시구조를 이용한 요구사항 분석 방법을 기반으로 요구사항 분석 프로세스를 개선하여 제안하였다. 기존 연구에서 제안한 거시구조 요구사항 분석 방법을 재해석하여 요구사항을 분석하는 단계를 나누고 각 단계의 시스템 요소 설계와 구조를 정의하여 요구사항 분석 프로세스의 설계를 수행하였다.

Analysis of Worst Case DMA Response Time in Fixed-Priority Bus Arbitration Protocol (고정우선순위 버스 프로토콜 환경에서 DMA I/O 요구의 최악 응답시간 분석)

  • Hahn, Joo-Sun;Ha, Rhan;Min, Sang-Lyul
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1999.10c
    • /
    • pp.21-23
    • /
    • 1999
  • CPU에게 최상위 우선순위가 할당된 고정 우선순위 버스 프로토콜에서는 CPU와 DMA 컨트롤러의 버스 요구가 충돌할 경우 DMA 전송이 지연된다. 본 논문에서는 CPU와 다수의 DMA 컨트롤러가 시스템 버스를 공유하는 환경에서 DAM I/O 요구의 최악 응답시간을 분석하는 기법을 제안한다. 제안하는 최악 응답시간 분석 기법은 다음의 세단계로 구성되어 있다. 첫 번째 단계에서는 CPU 상에서 수행중인 각 CPU 태스크별로 최악 버스 요구 패턴을 구한다. 두 번째 단계에서는 이들 CPU 태스크의 최악 버스 요구 패턴을 모두 통합해 CPU 전체의 최악 버스 요구 패턴을 구한다. 최종 세 번째 단계에서는 CPU의 최악 버스 요구 패턴으로부터 DMA 컨트롤러의 버스 가용량을 구하고 DMA I/O 요구의 최악 응답시간을 산출한다. 모의 실험을 통해 제안하는 분석 기법일 일반적인 DMA전송량에 대해 20% 오차 범위 이내에서 안전한 응답시간을 산출함을 보였다.

  • PDF

A Qualitative Formal Method for Requirements Specification and Safety Analysis of Hybrid Real-Time Systems (복합 실시간 계통의 요구사항 명세와 안전성 분석을 위한 정성적 정형기법)

  • Lee, Jang-Soo;Cha, Sung-Deok
    • Journal of KIISE:Software and Applications
    • /
    • v.27 no.2
    • /
    • pp.120-133
    • /
    • 2000
  • Major obstruction of using formal methods for hybrid real-time systems in industry is the difficulty that engineers have in understanding and applying the quantitative methods in an abstract requirements phase. While formal methods technology in safety-critical systems can help increase confidence of software, difficulty and complexity in using them can cause another hazard. In order to overcome this obstruction, we propose a framework for qualitative requirements engineering of the hybrid real-time systems. It consists of a qualitative method for requirements specification, called QFM (Qualitative Formal Method), and a safety analysis method for the requirements based on a causality information, called CRSA (Causal Requirements Safety Analysis). QFM emphasizes the idea of a causal and qualitative reasoning in formal methods to reduce the cognitive burden of designers when specifying and validating the software requirements of hybrid safety systems. CRSA can evaluate the logical contribution of the software elements to the physical hazard of systems by utilizing the causality information that is kept during specification by QFM. Using the Shutdown System 2 of Wolsong nuclear power plants as a realistic example, we demonstrate the effectiveness of our approach.

  • PDF

From Security Requirements to a Security Risk Analysis Method (보안 요구사항 기반의 보안 위험도 분석 기법)

  • Dong-hyun Lee;Myoung-rak Lee;Hoh In
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.11a
    • /
    • pp.574-577
    • /
    • 2008
  • 실제 소프트웨어 개발에서 지속적으로 보안관련 문제들이 발생하고 있으므로 이를 해결하기 위하여 소프트웨어 개발 주기의 초기 단계인 요구사항 분석단계에서 보안 요구사항을 추출하는 것이 필요하다. 이는 요구사항 분석 단계에 대한 투자가 소프트웨어 개발의 성공률을 높일 수 있기 때문이다. 보안 요구사항을 추출하는 기법에 대해서는 여러 방면으로 연구가 시작되었으나, 보안 요구사항을 토대로 향후 소프트웨어 개발과정에서의 보안관련 위험도를 산정하여 보안 투자의 우선순위를 정하는 기법은 아직 연구되어 있지 않다. 그러므로 본 논문에서는 추출된 보안 요구사항을 가지고 소프트웨어 보안에 대한 위험도를 산정하여 투자 비용의 우선순위를 산정하는 절차에 대해 제안한다.

Usecase-based Requirements Quantitative Analysis Approach to Architecture Modeling (아키텍처 모델링을 위한 유스케이스 기반의 요구사항 정량화 기법)

  • Jung, Chang-Hae;Yang, Won-Seok;Park, Soo-Yong
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.07b
    • /
    • pp.370-372
    • /
    • 2005
  • 아키텍처는 요구사항을 기반으로 생성되어야 한다. 특히 비기능적 요구사항은 아키텍처의 생성에 않은 영향을 미치는 요인이다. 본 논문은 아키텍처를 생성하기 위한 요구사항 분석 기법과 전략을 제안한다. 제안하는 방법은 유스케이스를 이용하여 기능 요구사항을 추출하고, AHP(Analytic Hierarchy Process)를 이용하여 비기능 요구사항의 중요도를 정량적으로 분석한다.

  • PDF

A Study on the User Requirement Evalution using Decision Making Methodology (의사결정기법을 이용한 사용자 요구사항 평가에 관한 연구)

  • Park, Pyung-Soo;Seo, Seong-Chae;Hwang, Bu-Hyun;Kim, Byung-Gi
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2002.11c
    • /
    • pp.1925-1928
    • /
    • 2002
  • 소프트웨어에 대한 고객의 요구수준이 점점 높아지고 복잡, 대형화됨에 따라 개발인력, 예산, 기간 등 많은 개발 자원이 소요되는 추세이지만, 개발자 직관에 의한 정성적인 판단으로 소요자원의 과부족을 초래하는 원인이 되고 있다. 본 논문에서는 요구분석 단계에서 기존의 정성적 판단에 따른 문제점을 보완하기 위해 요구분석 프로세스를 수정/제안하고, 의사결정기법을 이용하여 요구사항을 정량적으로 분석하고 식별할 수 있는 방법을 제안하였다. 이를 위해 사용자 요구분석 프로세스 검증단계에서 요구사항 평가활동을 추가하고, 의사결정 모델을 이용한 요구사항 가중치 계산, 시스템 기능과의 관련성 평가, 중요도 가중치를 계산하여 요구사항에 대한 식별의 기준으로 삼는다.

  • PDF

대규모 전자선거 기법 연구 동향 및 부인봉쇄 서명을 적용한 전자선거 기법

  • 윤성현
    • Review of KIISC
    • /
    • v.15 no.5
    • /
    • pp.15-22
    • /
    • 2005
  • 선거는 민주주의 사회에서 가장 중요한 사회적 행위 중의 하나이다. 여러 사회적 행위의 전자화를 위해서 정보보호 기술이 접목되고 있으며, 아직까지 개인의 익명성과 관련된 선거, 현금과 같은 분야는 매우 많은 요구사항으로 인하여 전자화 되지 못 하고 있는 실정이다. 본 논문에서는 규모가 큰 선거에서의 전자 선거 기법 도입을 위한 다양한 요구사항들을 분석하고, 전자선거 기법 구현시의 문제점 및 투표 및 개표 시스템의 전자화와 관련된 연구 동향을 알아본다. 또한, 부인봉쇄 서명 기법을 적용하여 전자선거에서의 투표자 중심의 요구사항을 만족하며 투표권에 대한 부인봉쇄 다중서명을 생성하도록 함으로써 보다 공정한 전자선거가 될 수 있는 인터넷 기반 전자선거 기법을 제안한다.