• Title/Summary/Keyword: 예산평가

Search Result 667, Processing Time 0.029 seconds

Bikeway Vitalization Countermeasures Using Bikeway User Satisfaction Model (자전거도로 이용자 만족도 모형을 통한 자전거도로 활성화 대책)

  • Im, Jun-Beom;No, Ri-Ra;Hong, Ji-Yeon;Lee, Su-Beom
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.5
    • /
    • pp.163-172
    • /
    • 2010
  • There are many efforts for expanding bikeway plans and increasing bike utilization. In this study the authors try to find the primary factors that affect bike users' satisfaction under limited budgets. As satisfaction is a qualitative variable, the authors developed a bike user satisfaction model by using structural equation methods. The bikeways are distinguished between bike lanes on public roads and exclusive bikeways along the Han River, as the characteristics and attributes should be different. The model shows bikeways on public road have a user satisfaction equal to 0.248*(safety)+0.405(accessibility). Bikeways along the Han River have a user satisfaction equal to 0.437*(accessibility)+0.405*(economic feasibility). In both types, accessibility affects satisfaction. Safety in more important to users on public roads, while economic feasibility affects those on the Han River bikeways.

The Discharge Measurement System with River-Crossing Structures for Ecological Management during Low Flow Season (갈수생태관리를 위한 중소하천 횡단구조물에서 유량측정 시스템)

  • Lee, Nam-Joo;Kang, Joon-Gu;Yeo, Hong-Koo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.649-649
    • /
    • 2015
  • 최근 기후변화 및 이상기후로 인해 하천환경 또한 급격하게 변화되고 있다. 변화되는 지구환경에 대응하기 위해 하천환경 대책과 하천생태계 보전/복원, 생물 보호, 친수기능 강화를 요구하고 있는 실정이다. 더욱이 소하천 건천화 및 하천환경관리에 대한 중요성은 대두되고 있으나 비용 및 인력투입 문제로 수위나 유량 등의 기초자료인 수위-유량 계측기술 및 대응연구가 미미한 실정이다. 체계적인 하천관리를 위해서는 신뢰성 있는 대상 하천의 수리량 자료 확보가 기본으로 요구된다. 이러한 중소하천의 관리의 신뢰도를 높이기 위해서는 실시간 수위유량 자료 확보가 필수적이다. 현재 하천 정비 계획 단계에서 수문모델링을 통해 중소하천의 유량을 산정하고 있지만 산발적으로 측정한 자료로는 검/보정에 한계가 있으며, 신뢰도를 확보하기 어려운 실정이다. 이수, 환경, 생태 등의 관점에서는 평상시 유량에 대한 실시간 정보가 매우 중요하다. 이에 체계적인 하천관리를 위해서는 중소하천에 대한 실시간 수리량 자료를 경제적으로 확보 할 수 있는 장치 개발 및 현장적용이 시급하다. 본 연구에서는 하천 횡단구조물이 가지고 있는 유량 측정의 편이성을 최대한 이용하여 급성장하고 있는 영상분석기술과 IT을 하천공학분야에 접목하여 중소하천의 수위와 유량을 실시간으로 원격 측정하는 WIA (Wireless Image Acquisition) 시스템을 개발하였다. WIA 시스템은 라즈베리파이 기반으로 적외선카메라를 이용하여 일정한 시간간격으로 횡단구조물의 상류, 중류, 구조물 주위의 흐름 영상을 확보하여 중앙처리장치로 전송하는 시스템으로 구성된다. WIA 시스템에서 전송된 영상은 본 연구에서 개발한 영상판독 S/W 및 H-Q 산정 S/W를 통해 하천의 수위를 판독하고 실시간으로 하천단면 수위유량 산정 자료 구축하는 자료로 활용된다. 현재 WIA 시스템의 성능 및 개선과 영상판독 S/W 및 H-Q 산정 S/W서버와의 연계운영 성능 평가를 통해 장치를 검증하는 단계에 있으며, 추후 서버구축을 통해 홍수 예 경보와 하천수질관리를 위한 기초자료로 활용될 것으로 기대된다. 또한 본 연구에서 개발하는 유량측정 시스템을 적용하면 기존 장비의 약 15% 예산으로 실시간 수리량 자료를 확보할 수 있을 것으로 예상된다.

  • PDF

A Comparative Analysis on Emergency Management System Between South Korea and the U.K. (한국과 영국의 재난관리 체제에 대한 비교 분석)

  • Yoon, Jong-Han;Park, Sung je;Ryu, Si Saeng
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.580-580
    • /
    • 2016
  • 기후변화의 영향으로 전세계적으로 이상 기후 및 자연재해가 증가하면서 재난을 효과적으로 관리하기 위한 법체계 및 제도에 대한 관심이 높아지고 있다. 그럼에도 불구하고 재난관리의 법과 제도적 측면에 대한 연구는 공학 및 기술적 연구에 비해 충분히 이루어지지 않고 있다. 특히 재난관리에 대해 많은 경험을 축적해온 선진국가의 재난관리체제에 대한 연구는 아직 미비한 수준이라 할 수 있다. 따라서 본 연구는 영국의 재난관리체제를 법과 제도를 중심으로 분석하고 한국에 필요한 시사점을 도출한다. 영국의 재난관리 체제는 지방정부가 재난대응에 있어서 주도적인 역할을 수행하고 중앙정부는 대응 가이드라인을 제시하고 지원 및 조정업무를 수행하는 분산적 재난대응체제라 할 수 있다. 중앙정부에는 재해를 전담하는 조직이 별도로 구성되어 있지 않고 지방행정조직이 지역특정에 맞게 위기관리계획을 수립하고 집행한다. 지역별로는 지방정부, 기업, 시민단체로 구성된 민관협력체인 위기관리포럼을 형성하여 재난에 대처한다. 반면 한국의 재난대응체제는 중앙집권적이며 국민안전처가 재해전담조직으로서 역할을 하고 있으나 영국과 같은 민관협력체는 발달하지 않았다는 차이점을 발견할 수 있다. 영국과 한국의 재난관리체제를 비교해 볼 때 다음과 같은 법 제도적 개선방안을 제시할 수 있다. 첫째, 분산되어 있는 재난관리 기본법을 하나로 통폐합할 필요가 있다. 둘째, 지방정부의 재난대응권한을 강화해야 하며 특히 인력과 예산이 재난에 적절히 대응할 수 있는 수준으로 조정되어야 한다. 세째, 지방수준에서 재난대응 관련 기관들간 조정 및 협력을 할 수 있는 체제가 강화되어야 한다. 네째, 민간단체를 재난대응체제에 조직적으로 참여시킬 수 있도록 해야 한다. 이를 위해서는 주민단위의 방재조직이 공공부분과 효과적으로 협조할 수 있도록 할 수 있는 제도적 틀이 필요하다. 다섯째, 재난대응단계 설정에 있어 예방에 앞서 지역의 특성에 따라 예방업무를 효과적으로 수행할 수 있도록 진단하는 평가단계를 추가하는 것을 고려해야 한다.

  • PDF

A Benchmarking Study for Deriving Data-driven Asset Management Strategy: U.S. Federal Transit Administration (FTA) Case (데이터 기반 노후 철도시설 자산관리 전략 도출을 위한 벤치마킹 연구)

  • Baek, Seungwon;Yoo, Minkyung;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.591-599
    • /
    • 2021
  • Rail transit agencies in Korea have been struggling to set up a performance-based rail facility maintenance plan because there are no formal definition and decision criteria for aging infrastructure. This study investigates the definition of aging infrastructure through extensive literature review and identifies benchmarking criteria through comparison with rail transit facility management systems in Korea and United States. As results, an aging infrastructure should be defined considering both service age and performance level of a facility. The priority of repair/replacement should be also determined with reasonable criteria based on relationship between service age and performance level. To determine the definition and decision criteria, a practicable classification system for aging rail transit needs to be established in accordance with classification system for performance assessment. Furthermore, a comprehensive database needs to be built including useful life, performance level, and maintenance cost of each component of rail transit. It will allow establishing an efficient budget execution plan for aging infrastructure.

Assessment of National and Regional Plans Using Integrated Management Index of Korea National Planning and Environmental Planning for Present Status Evaluation (국토계획과 환경계획 통합관리 지표의 적용을 통한 통합관리 현황 평가)

  • Heo, Han-Kyul;Lee, Dong-Kun;Sung, Hyun-Chan;Heo, Min-Ju;Park, Jin-Han
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.4
    • /
    • pp.81-91
    • /
    • 2019
  • Integrated management of Korea national and environmental planing for sustainable development is suggested, and basic research is needed. In this study, national and regional plans were assessed using 'integrated management index of Korea national planning and environmental planning' to grasp the current status of integrated management on Korea national planning and environmental planning. As a result of the assessment, it was found that both national and regional plans need to improve considering the natural ecology part and water resource and quality part. In addition, it was derived that the detailed contents of the indicator can not be reflected according to the characteristics in the higher-level plan. Therefore, it has been found necessary to include proclamatory contents so as to be able to establish a detailed plan that reflects environmental goals in the lower-level plan.

An Exploratory Study on Conceptual Framework for Project-based Supply Chain Management : Focusing on Plant Engineering Firms (프로젝트형 SCM의 개념적 틀에 관한 탐색적 연구 : 플랜트 엔지니어링 기업을 중심으로)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.16 no.12
    • /
    • pp.123-135
    • /
    • 2018
  • The objective of this paper is to investigate the issues related to the supply chain management in plant engineering industry, and propose the framework to improve the project efficiency. The preliminary case study shows that EPC's fragmented nature, lack of coordination and information sharing, and lack of proper risk and change management contribute to project delay and cost overrun. To examine the level of informatization and information sharing in supply chain, survey responses from the suppliers and subcontractors have been collected. The statistical results show that information sharing, early involvement in design process and awareness in SCM have influenced the level of collaboration, but supplier assessment and informatization have no impact on the collaboration. A conceptual model is proposed in order to facilitate the integration of design, procurement and construction functions. Implications from the study are also provided.

일본 나라문화재연구소의 독립행정법인 이행과 관련된 제문제

  • 타나베이쿠오
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.4
    • /
    • pp.160-173
    • /
    • 2012
  • 일본 문화청 소속의 정부조직이었던 나라국립문화재연구소가 국가조직의 행정개혁에 따라 현재의 독립행정법인 나라문화재연구소로 변혁하면서 나타나고 있는 여러가지 상황에 대해서 살펴보고자 한다. 나분켄은 동아시아에서도 잘 알려진 국보 호류지금당벽화의 소실이 문화재 분야의 큰 문제로 부각되면서 종합적이고 학술적인 문화재의 연구 보호 종합기관의 설립 필요성에 의해 만들어진 기관이었다. 연구분야에서 보면 초기에는 역사, 건축, 미술공예, 정원, 유적 등 다양한 분야에서 출발했으나 나라지역의 헤이조큐 유적보존 문제가 주요 이슈로 떠오르면서 매장문화재의 발굴 중심으로 그 역할이 강화되는 변화를 겪에 되었다. 그러나 선사고고학이 아닌 역사고고학이 중심이었기 때문에 건축사나 정원사, 보존과학 등 서로 다른 학문이 융합하여 연구할 수 있는 강점이 강화되어 설립목적은 견지하면서 변모하였다. 독립행정법인으로의 변화는 1999년의 제145차 통상국회에서 "독립행정법인통칙법"이 성립되면서 부터였다. 독립행정법인의 취지는 독립 운영하는 쪽이 효율적인 부분을 분리시켜 법인격을 가진 기관으로 바꾸면서 운영교부금을 주무관청으로부터 받아 사용처를 독자적 재량에 맡기면서 이윤을 올릴 수도 있게 한 것이다. 또한 조직과 인사의 자율성을 보장받는 장점도 있으나 평가시스템이 되입되는 정신적 부담도 공존하게 된다. 즉, 민간 방법의 도입에 따라 국가의 부담을 경감하고자하는 의미가 내재되어있다. 나분켄의 독립행정법인화는 동시에 도쿄문화재연구소의 통합을 수반하게 되었다. 도분켄은 원래 미술공예품을 중심으로한 동산문화재 연구와 보존과학부분에 충실한 조직이었으므로 부동산문화재 중심의 나분켄과 통합에 우려의 목소리가 있었다. 그러나 불행중 다행으로 다카마쓰즈카 고분벽화의 열화문제와 키토라 고분 벽화의 보존문제로 인하여 전무후무한 협업연구가 진행되고 양 연구소의 역량을 결집할 수 있는 계기가 되었다. 결론적으로 말하자면, 독립행정법인화는 매년 예산을 중기계획이나 연도계획과 정합성을 유지하면서 독자적인 판단을 통해 편성하는 등 극히 유연한 대응이 가능하다는 장점을 가지고 있는 반면, 문화재 보존을 위한 연구라는 공공적인 목적을 가진 조직이 정부의 의도대로 독자적으로 이윤을 올리는 사업을 확립하여 국가의 부담을 경감하는 방향으로 나아갈 수 있는가라는 부분에서는 의심할 여지가 남아 있다.

A Study on the Management Status of Fire Services Records of Local Government in the Metropolitan Area (광역지방자치단체 소방기록물 관리 현황 분석)

  • Kim, Ye Ji;Lee, Seongsin
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.19 no.3
    • /
    • pp.179-204
    • /
    • 2019
  • The study aims to investigate the management status of fire services records of local government D in the metropolitan area. To achieve this, the study analyzed the data from 2013 to 2017 based on the production, preservation, and disposition processes of records. The findings are as follows: 1) unkept regulations to transfer the records, 2) a lack of understanding of archival objects, 3) reconsideration of the history management of the records appraisal committee, 4) and an on-site update of records. Therefore, this study suggested the following for an effective fire services records management: 1) training for the fire services records management, 2) proper budgeting for the records management, 3) and secured metadata for the history management of records.

Coloring Quality of Prunus mume and Prunus armeniaca var. ansu - Plant Genetic Resource of ex situ Conservation in Yesan - (매실나무와 살구나무 열매의 착색 특성 - 예산지역 이식의 현지외보전 식물자원 -)

  • Kang, Hee Kyoung;Yi, Ja Yeon;Kang, Hye Rin;Oh, Chan Sik;Song, Hong Seon
    • Proceedings of the Plant Resources Society of Korea Conference
    • /
    • 2019.04a
    • /
    • pp.48-48
    • /
    • 2019
  • 본 연구는 대한민국 매실나무 (207점)와 살구나무 (7점) 열매의 특성평가를 위하여 개체별 과피 및 과육의 착색정도를 조사하였다. 매실나무 열매의 착색상태는 아주 약함이 65점 (31.4%)으로 가장 많았으며, 다음으로 약함 (57점, 27.5%), 아주 짙음 (56점, 27.1%), 중간 (19점, 9.2%), 짙음 (10점, 4.8%)이었다. 살구나무 열매의 착색상태는 아주 짙음이 3점(42.8%)으로 가장 많았고, 다음으로 아주 약함 (2점, 28.6%), 약함과 짙음 (각각 1점, 14.3%)이었다. 매실나무 열매의 착색부위는 적음이 105점 (50.7%)으로 가장 많았으며, 다음으로 중간 (65점, 31.4%), 아주 적음(32점, 15.5%), 많음 (5점, 2.4%)이었다. 살구나무 열매의 착색부위는 아주 많음이 5점 (71.4%)으로 가장 많았고, 다음으로 중간 및 많음 (각각 1점, 14.3%)이었다. 매실나무 과육의 빛깔은 백록색이 103점 (49.8%)으로 가장 많았으며, 다음으로 연등색 (77점, 37.2%), 등색 (25점, 12.0%), 유백색 및 암등색 (각각 1점, 0.5%)이었다. 살구나무 과육의 빛깔은 등색이 4점 (57.1%)으로 가장 많았고, 다음으로 연등색 (2점, 28.6%), 백록색 (1점, 14.3%)이었다.

  • PDF

Establishing the Strategy of Effective Construction VE for Construction Firms (건설기업 관점의 효과적인 시공 VE 수행을 위한 전략 도출 연구)

  • Park, Chan Young;Yun, Sungmin;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.80-87
    • /
    • 2021
  • Shortage of SOC budget and inappropriate initial construction cost planning have worsened the economic sentiment of the construction firm. Construction VE can be one of the solutions for improving the profitability of construction projects. This study identifies the strong and weak points of construction firms for establishing the strategy of effective construction VE by using importance-performance analysis. As a result, construction firms have strong points on support, cooperation, and knowledge about construction VE, but have weak points on 'VE experience of VE leader', 'Detailed cost estimation', and 'Idea generation and evaluation'. This paper contributes to establishing the strategy of effective construction VE from the perspective of the construction firm, which is differentiated from previous studies that have focused on the institutional approach for construction VE.