• Title/Summary/Keyword: 열차중정비

Search Result 8, Processing Time 0.021 seconds

A Study on Virtual Training System for Education of Train Maintenance (철도 차량 정비 교육을 위한 가상훈련 시스템 설계에 관한 연구)

  • Jeong, Jin-hyun;Song, Eun-jee
    • Journal of Practical Engineering Education
    • /
    • v.8 no.2
    • /
    • pp.103-109
    • /
    • 2016
  • In order to get the maintenance work for the normal operation of rail vehicles made safe maintenance training, which looked suffered direct physical train maintenance environment, gain experience to get out foster the practical skills, but experience the real maintenance in operational problems the maintenance procedures followed are difficult to be. So it can gain experience and knowledge of the actual maintenance work in safe conditions if you apply a simulation experience in a similar environment as possible to the actual train maintenance training can also reduce operational training costs. For a description of the current domestic and simulation programs of the railway sector it has been operating in overseas and is designed to train intensive training, maintenance and maintenance-related information is scarce situation. In this study, the contents of the theory of educational technology for effective training of train maintenance elements exhibit theory, theory of learning situations, designed to train maintenance training simulation through a previous study that investigated the problem-based learning theory.

Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method (시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가)

  • Jang, Seong-Young;Jeon, Byoung-Hack;Lee, Won-Young;Yoo, Jae-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.

An Evaluation of Development Plans for Rolling Stock Maintenance Shop Using Computer Simulation - Emphasizing CDC and Generator Car - (시뮬레이션 기법을 이용한 철도차량 중정비 공장 설계검증 - 디젤동차 및 발전차 중정비 공장을 중심으로 -)

  • Jeon, Byoung-Hack;Jang, Seong-Yong;Lee, Won-Young;Oh, Jeong-Heon
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.3
    • /
    • pp.23-34
    • /
    • 2009
  • In the railroad rolling stock depot, long-term maintenance tasks is done regularly every two or four year basis to maintain the functionality of equipments and rolling stock body or for the repair operation of the heavily damaged rolling stocks by fatal accidents. This paper addresses the computer simulation model building for the rolling stock maintenance shop for the CDC(Commuter Diesel Car) and Generator Car planned to be constructed at Daejon Rolling Stock Depot, which will be moved from Yongsan Rolling Stock Depot. We evaluated the processing capacity of two layout design alternatives based on the maintenance process chart through the developed simulation models. The performance measures are the number of processed cars per year, the cycle time, shop utilization, work in process and the average number waiting car for input. The simulation result shows that one design alternative outperforms another design alternative in every aspect and superior design alternative can process total 340 number of trains per year 15% more than the proposed target within the current average cycle time.

A study on Development of method for Train Schedule Simulation (철도 차량운행계획 시뮬레이션 방법론 개발에 대한 연구)

  • Shin, Dae-Sup;Park, Eun-Kyung;Lee, Jin-Sun;Lee, Seon-Ha
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.1
    • /
    • pp.88-95
    • /
    • 2012
  • Presently, because making process of train service plan consist of various constraint condition, for example structure of track, structure of track in station, train maintenance time and others for considering to be necessary of train management, it has been had extremely complex structure problems. For these reasons, it has big problems to compare analysis for various train service time-table. A study suggest methodology to choice service the most effective schedule and plan of train put before comparative analysis on making train diamond picture's expected effect of established possible various train time-table in making process of train service schedule for improving effectiveness and organization of train service schedule establishment. A study uses Line-Blocking theory for analyzing train service time-table and analyze example for regional train Sadang to Ansan section in 4line.

Achievements and Tasks of the SMRT Tunnel Monitoring System(TMS) (서울도시철도공사 터널모니터링 시스템의 운영성과와 과제)

  • Park, Jong-Hun;Kim, Man-Hwa;Park, Ki-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.381-387
    • /
    • 2012
  • This paper is aimed to analyze the achievements of the Tunnel Monitoring System(TMS), implemented in Seoul subway L5~L8, and to find out improved methods. By introducing the TMS, it is possible to inspect tunnel facilities for 24 hours a day while trains are operated. The inspection capability could be expanded, the accuracy was improved, and the cycle was shortened. The efficiency of manpower was improved and the surplus manpower could be used for other tasks of facilities maintenance. As a result, by introduction of the TMS, the amount of tunnel maintenance was increased by 225% and the train service troubles caused by facility problems were decreased by 53%.

Simulation Analysis of the Train Overhaul Maintenance Capacity for Rolling Stock Depot (열차 차량기지의 중정비 검수 용량 시뮬레이션 분석)

  • Jeon, Byoung-Hack;Lee, Won-Young;Jang, Seong-Young;Yoo, Jae-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1481-1498
    • /
    • 2007
  • As railroad industry face the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high speed long distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for detailed operations of the sample maintenance center are developed. In this study, standard maintenance procedures, layout, equipments and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. Three simulation analysis using the developed simulation model are done. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Lastly, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared.

  • PDF

A Conceptual Design of Maintenance Information System Interlace for Real-Time Diagnosis of Driverless EMU (무인전동차의 실시간 상태 진단을 위한 유지보수 정보시스템 인터페이스에 대한 개념설계)

  • Han, Jun-hee;Kim, Chul-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.63-68
    • /
    • 2017
  • Although automated metro subway systems have the advantage of operating a train without a train driver, it is difficult to detect an immediate fault condition and take countermeasures when an unusual situation occurs. Therefore, it is important to construct a maintenance information system (MIS) that detects the vehicle failure/status information in real time and maintains it efficiently in the depot of the railway's vehicles. This paper proposes a conceptual design method that realizes the interface between the train control system (TCS), the operation control center train control monitoring system (OCC-TCMS) console, and the MIS using wireless communication network in real-time. To transmit a large amount of information on 800,000 occurrences per day during operation, data was collected in a 56 byte data table using a data processing algorithm. This state information was classified into 4 hexadecimal codes and transmitted to the MIS by mapping the status and the fault information on the vehicle during the main line operation. Furthermore, the transmission and reception data were examined in real time between the TCS and MIS, and the implementation of the failure information screen was then displayed.

Extension Feasibility on Replacement Cycle of Rotor Blade Equipped for Low Pressure First Stage in a 150 MW Gas Turbine (150 MW급 가스터빈 저압 1단 회전익 교체주기 연장 가능성 연구)

  • Lim, Jong-Ho;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.9 no.4
    • /
    • pp.31-36
    • /
    • 2013
  • In order to extend a hot gas parts replacement cycle of a gas turbine, blade row 1 from low pressure turbine, which has a significant impact on the cycle, has been selected from stored set after one cycle use. Taking into account the status of the first stage moving blade in LP turbine operated more than 27,000 equivalent operating hours(EOH) and the replacement cycle in the same type of gas turbine, the replacement of the high temperature components installed on the GT, a study subject, can be extended from 24,000 to 27,000 EOH.

  • PDF