• Title/Summary/Keyword: 열차운행횟수

Search Result 29, Processing Time 0.024 seconds

An Optimizing Simulation for Designing the Numbers of Electric Train Car (전동열차 편성량수 설계를 위한 최적화 시뮬레이션)

  • Kim, Ick-Hee;Yun, Dong-Hee;Kum, Ki-Jung;Lee, Sang-Myoung
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.3
    • /
    • pp.95-106
    • /
    • 2012
  • The railway service in the Seoul metropolitan area is facing variety of l changes such as extension of service coverage, new construction, and introduction of express service which in turn causes changes on demands. The demand affects train operation characteristics (frequency of service, train formation) as well as on the congestion rate which is one of the major evaluation index in metropolitan area user service. For the efficient operation of the train, the relationship among the minimization of fleet number, operating cost, and service level has been analyzed. Using the Powersim, which is a system dynamics (System Dynamics) simulation program for realizing optimized simulation for train-formation, this paper identified that some stations of Gyeong-bu line exceeded limit congestion rate(150%) of a fleet already that means it is best to maintain current condition of the line; however, the Gyeong-in line and the Gwa-chon line showed no excess of the limit congestion rate so that it is possible to reduce 2-4 fleets of train for efficient operation. In addition, in case of Jang-hang line between Cheon-an and Sin-chang, a train consisting of 10 fleets provides services which is same formation of train for Gyeong-bu line. This study proved that the congestion rate will not rise greatly with only 4 fleets of a train for the service in Jang-hang line, and it is considered that a study for shuttle service between Cheon-an and Sin-chang is necessary.

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF

Evaluation of Train Running Safety During Construction of Temporary Bridge on Existing Railway (기존선에서 가설교량 시공에 따른 열차의 주행안전성 평가)

  • Eum, Ki-Young;Bae, Jae-Hyoung;Choi, Chan-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.234-239
    • /
    • 2011
  • Installing the temporary bridge after excavating the railway requires installing movable cross beam, but as it doesn't requires isolating the catenary or cutting the rail, it's applicable to double-track with frequent operation. In this study, a displacement meter was placed on temporary bridge to monitor the displacement pattern in curve section (R400) completed using temporary bridge method, and wheel load, lateral pressure and derailment coefficient were measured to evaluate the load imposed on track and the stability in curve section (R400) for quantitative evaluation of training running safety. As a result of the measurement, when trains passing over a temporary bridge, the maximum value of Wheel load and Lateral Force is analyzed as the 51% and 81% of standard level according to foreign country's performance tests, There is no trouble with stability analysis in Wheel load and Lateral Force occurring. Additionally, Wheel load and Lateral Force considered as the safety standard are tested 49% of limiting value regardless of trains, which the norm value quite well, there is no problem with train running.

Seoul Subway Delay Analysis through Big Data Analysis (빅데이터 분석을 통한 서울시 지하철 지연 분석)

  • Soo-Min Park;Jai-Soon Baek;Sung-Jin Kim
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2024.01a
    • /
    • pp.153-155
    • /
    • 2024
  • 본 논문은 진접선 개통 이후 급증하는 서울 지하철 4호선의 혼잡 문제와 현재 진행 중인 장애인 차별 반대 시위를 다룬다. 네이버의 지도 API를 활용해 위도와 경도 데이터를 추출하고 지하철 노선별 장애인 승객 수와 최대 지연시간을 시각화한다. 2호선과 4호선의 혼잡도가 표시되어 문제의 심각성을 알 수 있다. 평균 출퇴근 시간 탑승 및 하차 수치를 분석하여 4호선 편의시설 개선, 2·4호선 열차 운행 횟수 늘리기, 환승역 운영 최적화 등 전략적 권장 사항을 제시한다. 제안된 대책은 서울시 지하철 시스템의 접근성 향상, 혼잡완화, 전반적인 효율성 제고를 통해 보다 폭넓은 교통시설 개선과 승객 편의 증진에 기여하는 것을 목표로 하고 있다.

  • PDF

Multinomial Logit Modeling: Focus on Regional Rail Trips (다항로짓모형을 이용한 지역간 철도통행 연구)

  • Kim, Gyeong-Tae;Lee, Jin-Seon
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.1 s.94
    • /
    • pp.109-119
    • /
    • 2007
  • Increasingly, the emphasis in regional Passenger rail Planning is finding ways to more efficiently use existing facilities, with particular attention being Paid to Policies designed to spread Peak-Period travel demand more evenly throughout the week with consideration of train classification. In this context the individual's choice of time to travel is of crucial significance. This paper investigates the use of multinomial logit analysis to model ridership by rail classification using data collected for travel from Seoul to Busan during the one week in October 2004. The Particular model form that was successfully calibrated was the multinomial logit (MNL) model : it describes the choice mechanism that will Permit rail systems and operations to be planned on a more reliable basis. The assumption of independently and identically distributed(IID) error terms in the MNL model leads to its infamous independence from irrelevant alternatives (IIA) property. Relaxation of the IID assumption has been undertaken along a number or isolated dimensions leading to the development of the MNL model. For business and related rail travel patterns, the most important variables of choice were time and frequency to the chosen destination. The calibrated model showed high agreement between observed and Predicted market shares. The model is expected to be of use to railroad authorities in Planning and determining business strategies in the Increasingly competitive environment or regional rail transport.

Correlation Analysis between Dynamic Wheel-Rail Force and Rail Grinding (차륜-레일 상호작용력과 레일연마의 상관관계 분석)

  • Park, Joon-Woo;Sung, Deok-Yong;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.2
    • /
    • pp.234-240
    • /
    • 2017
  • In this study, the influences of rail surface roughness on dynamic wheel-rail forces currently employed in conventional lines were assessed by performing field measurements according to grinding of rail surface roughness. The influence of the grinding effect was evaluated using a previous empirical prediction model for dynamic wheel-rail forces; model includes first-order derivatives of QI (Quality Index) and vehicle velocity. The theoretical dynamic wheel-rail force determined using the previous prediction equation was analyzed using the QI, which decreased due to rail grinding as determined through field measurements. At a constant track support stiffness, an increase in the QI caused an increase in dynamic wheel-rail forces. Further, it can be inferred that the results of dynamic wheel-rail analysis obtained using the measured data, such as the variation of QI due to rail grinding, can be used to predict the peak dynamic forces. Therefore, it is obvious that the optimum amount of rail grinding can be determined by considering the QI, that was regarding an operation characteristics of the target track (vehicle velocity and wheel load).

A study on the Estimation Function of the Operating Cost for an Urban Railway (with a focus on Medium-sized Rapid Transit) (도시철도 운영비용 추정함수개발에 관한 연구 (중간규모 도시철도를 중심으로))

  • Chung, Su Young;Lee, Won Young
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.4
    • /
    • pp.318-330
    • /
    • 2013
  • It is necessary to estimate the operating cost for constructing an urban railway system. The present study was thus carried out to develop an estimation function of the operating cost for a MRT(Medium-sized Rapid Transit) system. We selected seven independent variables that could influence the operating cost: the rolling stocks, the number of trains in operation, the length of the lines, the number of stations, the number of passengers per day, the frequency of train operation, and the number of depots. We performed a multiple regression using Excel. Three types of regression functions were thereupon developed. All of them proved to be appropriate after comparing the results of the estimated cost. It will therefore be possible to use one of these three types, depending on the assumptions of the independent variables.

Durability Evaluation on the Air-Braking Release Failure Proof Valve of Cargo Train (화물열차 공기제동 완해불량 방지 밸브의 내구성 평가)

  • Lee, Jun-Ku;Kim, Chul-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.32-38
    • /
    • 2020
  • Cargo train braking uses the pressure changes in the air braking pipe to operate the braking tightening and releasing service repeatedly. Air-braking release failure means partial braking caused by a failure of the variable load valve after the driver handling the brake release. This phenomenon causes wheel flaws while driving a wagon, resulting in wheel breakage or train derailment. This study developed the air-braking release failure proof valve considering the technical requirements of the railway operation corporations. In addition, a durability test of the valve was carried out using a braking performance simulator, and its operating performance was evaluated from the pneumatic history under cyclic braking conditions. The warranty life of this valve was assessed by performing 160,000 cycles of testing of 12 prototypes in accordance with the zero-failure test method, considering the number of braking cycles while driving the wagon. During the durability test, the pneumatic input time, output time, and release velocity were almost constant. The warranty life of this valve was 59,860 times the 95% confidence level, which means that it can be operated without trouble for four years when the valve is installed in the bogie of the wagon.

Study on the Maintenance Interval Decisions for Life expectancy in Railway Turnout clearance Detector (철도 분기기 밀착검지기 Life expectancy의 유지보수 주기 결정에 관한 연구)

  • Jang, ByeongMok;Lee, Jongwoo
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.4
    • /
    • pp.491-499
    • /
    • 2017
  • Railway turnout systems are one of the most important systems in a railway and abnormal turnout systems can cause serious accidents. To detect an abnormal state of a turnout, turnout clearance detectors are widely used. These devices consider a failure of a turnout clearance detectors to be a failure of the turnout system, that could hinder train operations. Analysis of turnout clearance detector failures is very important to ensure normal train operation. We categorized failures of detectors into four groups to identify failure characteristics of the 140 detectors, which are composed of main line detectors (A), side tracks (B), detectors that are in operation more than 80 times a day (C) and detectors that are in operation fewer than 10 times per day. Failures of detectors have mainly been caused in the control part, in the cables and sensors; failures are classified into four groups (A, B, C and D). We have tried to find failure density distributions for each type of failures, inferring the parameter distributions a priori. Finally, using the Bayesian inference we proposed a maintenance time for control parts through the mean time of the detector, life and the life expectancy.