• Title/Summary/Keyword: 열차운행계획

Search Result 64, Processing Time 0.028 seconds

An Estimation Model of the Minimum Required Dwell Time for Urban Railway (도시철도 적정 최소소요 정차시분 추정모델)

  • Kim, Dong-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.953-960
    • /
    • 2009
  • In the major operation section of urban railway, there has been occurred habitual delay, and delay propagation and spread to consecutive trains. Therefore, this delay cause the increase of operation time and irregular operation, also the increase of crowd and inconvenience to passengers. The railway operation plan is a promise to passengers and must have reliability. In the case of high frequency urban operation, dwell time have considerable influence on operational headway, so it is very important to efficiently plan and control the dwell time at stations. In this paper, the survey of the research on dwell time for urban railways is presented. The practical estimation model for minimum required dwell time, and the numerical example and validity are proposed.

A Numerical Study of the Pressure Wave in the Tunnel for G7 Test Train (G7 시제 차량의 터널내부 압력파에 대한 수치적 연구)

  • 권재현;권혁빈;김태윤;이동호;김문상
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.162-167
    • /
    • 2002
  • 열차가 고속으로 터널에 진입하게 되면 터널 내부에서 극심한 압력 교란이 발생하게 되며 이로 인한 이명현상은 승객들에게 불쾌감을 크게 유발시키고, 열차 구조물에 작용하는 반복적인 하중변화 또한 구조상 큰 문제를 일으킬 수 있게 된다. 따라서 이를 해결하기 위해서는 터널 내부의 유동장에 대한 정확한 예측이 필요하다. 본 논문은 긴 터널을 효율적으로 해석하기 위해서 최소 차원의 공간 가정을 통하여 계산 시간을 절약할 수 있는 혼합차원 기법을 이용하여 현재 G7 시제차의 시험 운행 구간내의 터널들에 대해서 수치해석을 수행하였다. 해석 결과 터널 내부에서는 압축파, 팽창파의 상호 작용에 의한 복잡한 압력 교란이 발생하였고, 이러한 압력 변화는 열차 속도, 터널 길이, 측정위치에 따라 각각 다르게 나타났다. 따라서 터널 내부의 유동장을 정확히 예측하려면 열차 속도, 터널 길이, 열차 길이, 열차/터널 단면적 비, 측정 위치 등을 고려하여 해석을 수행하여야 한다. 이러한 수치 해석 결과는 시제차 시험 계획의 수립 및 시험기기의 선택과 설치 위치 등을 결정하는 중요한 자료로 활용될 수 있을 것이며, 고속 열차의 여압 시스템과 외부 부착 구조물에 대해서도 중요한 정보를 제공할 수 있을 것이다.

  • PDF

Development of the Train Dwell Time Model : Metering Strategy to Control Passenger Flows in the Congested Platform (승강장 혼잡관리를 위한 열차의 정차시간 예측모형)

  • KIM, Hyun;Lee, Seon-Ha;LIM, Guk-Hyun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.3
    • /
    • pp.15-27
    • /
    • 2017
  • In general, increasing train dwell time leads to increasing train service frequency, and it in turn contributes to increasing the congestion level of train and platform. Therefore, the studies on train dwell time have received growing attention in the perspective of scheduling train operation. This study develops a prediction model of train dwell time to enable train operators to mitigate platform congestion by metering passenger inflow at platform gate with respect to platform congestion levels in real-time. To estimate the prediction model, three types of independent variables were applied: number of passengers to get into train, number of passengers to get out of trains, and train weights, which are collectable in real-time. The explanatory power of the estimated model was 0.809, and all of the dependent variables were statistically significant at the 99%. As a result, this model can be available for the basis of on-time train service through platform gate metering, which is a strategy to manage passenger inflow at the platform.

Based on the Demand, A Scheduling Method for the Seoul-Busan High Speed Rail (수요기반의 경부고속철도 열차운행계획 수립기법에 관한 연구)

  • Park, Jin-Yong;Chang, Justin S.
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.380-388
    • /
    • 2010
  • This paper explored an effective scheduling method for the Seoul-Busan High Speed Rail. It is important to decide train frequency influencing on scheduling method. Main factors to decide train frequency are location of station, social economic index, land use of station area and travel demand. In this paper, we focused on travel demand which is critical factor to decide train frequency. And we studied on standardized scheduling method. Simulation method is used to analyze the performance of explored method.

  • PDF

The consideration of facilities plan and train operating plan for Incheon airport railroad revitalization (인천공항철도 활성화를 위한 시설 및 열차운영방안 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.80-97
    • /
    • 2010
  • With the hubbing strategy, construction of "Incheon Airport Railroad(AREX)" was proceeded to expand the accessibility at the level of airports in rivalry like Kansai and Chek Lap Kok. At the present 1st phase which routes from Incheon Airport to Kimpo Airport is opened March 2007. 2nd phase which is planned from Kimpo Airport to Seoul station will be opened at the end of October 2010. But the accessibilty to AREX is delinquent because it is connected only in Seoul station and the maximum operation speed is 110km/h which downgrade the time competitiveness with airport limousine. In addition, transfering of user is necessary to access to AREX from Kyungbu KTX. With these reasons, travel demand in 1st phase section is low(7%). According to reestimation of travel demand, demand analysis result compared with convention condition is insufficient, so required annual average government grant-in-aid amounts to 200 billions won, and it is right time to develop the method for revitalization of Incheon airport railroad. In this paper, facilities plan and operating plan to make new travel demand by speed-up which is able through substitution train now running with high speed train(EMU, 180km/h) and direct connection of KTX, will be suggested. This will contribute to offering high speed railroad service to customers and the reduction of government grant-in-aid by way of demand expansion.

  • PDF

An Exploratory Development of Mathematical Programming Model for the Railway Conflict Resolution Problem on a Single Line Track (단선구간 열차경합해소 문제를 위한 수리계획 모형의 기본설계)

  • Oh Seog-Moon;Hong Soon-Heum;Kim Jae-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.314-320
    • /
    • 2005
  • This paper is designed to help train dispatcher resolve railway conflicts in rent-time. We developed a mixed integer programming model to optimize the train schedule that determines the best overtaking or crossing positions, The objective of the model is to minimize the maximum lateness of the trains and reduce the total sum of the lateness, while satisfying the field constraints associated with the difference between passenger trains and freight trains, and the limited number of sidings. We applied the model on a portion of a single line track, Joong-Ang Line to ascertain the efficiency of the model, and showed how the model can be used to resolve the railway conflicts. The results indicates that our model can provide useful results in terms of optimal schedule for the test problem. This type of modeling approach would be useful for a train dispatcher to make a real-time railway conflict resolution.

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF

Simulation of Noise and Vibration around the Improved Turnout System (개량분기기 인근의 소음진동 시뮬레이션)

  • Eum, Ki-Young;Um, Ju-Hwan;Lee, Chin-Hyung
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.4
    • /
    • pp.119-128
    • /
    • 2006
  • A turnout system which permits trains to pass from one track to another is a combination of the switch, the crossing, lead rails which are necessary to connect the switch and the crossing, two guard rails and a switch machine for operating the switch. A turnout is the sole moving part among the railway components and has complex configuration, so the safety has always been raised an issue. In Korea, it is planned to adopt the high speed tilting train, which operates at the maximum speed of 200km/h, at conventional lines by the year of 2010. However, for the application of the tilting train to conventional lines, it is prerequisite to establish a stable turnout system allowing the tilting train to pass through it without reducing speed. Therefore, the improved turnout system for the speed-up of conventional lines has been developed and the prototype of the turnout system has been constructed. In this study, simulation of noise and vibration around the improved turnout system was performed in order to predict the generation level of noise and vibration due to passing of the tilting train through the turnout system.

  • PDF

실물레일 용접부의 정적거동특성에 관한 실험적 연구

  • 장동일;채원규;경갑수;홍성욱
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1999.06a
    • /
    • pp.169-174
    • /
    • 1999
  • 우리나라에 철도가 도입된 역사는 개화초기인 구한말 고종 26년에 주한대리공사 이 하영이 귀국시 외국의 기차모형을 우리나라에 소개하면서 우리나라에 철도가 처음 소개되었으며, 지속적으로 철도기술의 발전을 추진한 결과 1998년 현재 철도총연장은 3,101km, 1일 열차운행횟수는 2,685대, 수송력은 여객의 경우 2,240,000명, 화물의 경우 160,000ton에 이르고 있다. 아울러 현재 기존 철도의 물동량 수송정도가 포화상태에 접어들면서 현재 활발하게 건설중에 있는 경부고속철도를 위시하여 계획단계에 있는 호남고속철도, 동서고속철도 등 철도기술은 나날이 발전을 거듭하고 있다. (중략)

  • PDF

직선형 동기전동기의 구조와 특성

  • 차귀수;정현교
    • 전기의세계
    • /
    • v.39 no.9
    • /
    • pp.18-26
    • /
    • 1990
  • LSM은 다음 세대에 요구되는 초고속운송수단의 조건을 골고루 갖추고 있으므로 이에 대한 관심이 집중되고 있다. 이에 따라 초고속열차를 개발하고 있는 서독, 일본 등이 모두 LSM을 채택하고 있고, 도심에서 운행되는 중속의 운송수단으로까지 그 영역을 확대하고 있는 TR-07을 시험하는 중이고 일본에서도 상업운전이 가능한 길이 45km의 야마나시실험선을 1994년까지 건설할 계획이다. 이와같은 추세는 자성재료의 발달, 효율적인 발달, 효율적인 전력변환방식의 개발, 성능이 우수한 초전도선 및 냉각시스템의 개발에 따라 더욱 가속화 될 것으로 예상되며, 경제활동영역의 증가에 따라서 더욱 빠른 교통수단이 요구되는 국가적인 필요성도 중요한 요인이 될 것이다. 세계적인 추세와 필요성을 감안할 때에 국내에서도 LSM에 대한 기초연구의 필요성이 높다고 생각된다.

  • PDF