An Analysis Of Optimized Super Tall Building Tower Crane Selection Which Related With Project Construction Period (프로젝트 공사기간과 연계된 극 초고층 타워크레인 최적화 선정에 관한 연구)

  • Cho, Ji-Hun;Cho, Heung-Goo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.131-139
    • /
    • 2009
  • It is critical to select the appropriate type of tower cranes for the construction of super tall buildings. However the selection is often made based on subjective personal experiences due to the lack of historical and analytical data. As a result, planning mistakes and efficiency errors sometimes occur. This research is to develop a system of hoisting analysis for appropriate tower crane selection and to provide a flexible statistical model based on the Burj Dubai project. In addition, this system hassupporting functions that can estimate the target construction period per floor, and a decision-making construction period computation method which is based on the characteristic of the selected tower cranes.

Assessment of Quality Assurance in the Lifting and Assembly Phase of Modular Construction: An Importance-Performance Analysis Approach (중요도-성취도 분석을 이용한 모듈러 건축프로젝트 현장설치 및 양중 단계의 품질 관리방안에 관한 연구)

  • Lee, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.595-605
    • /
    • 2023
  • With the escalating prevalence of modular construction projects, there is a concurrent surge in scholarly and industrial intrigue in this domain, leading to a broadened spectrum of its applications. Modular construction, inherently facilitated by controlled factory settings, boasts the capability to consistently deliver edifices of superior quality. To optimize this advantage, the judicious integration of quality assurance methodologies during the site-specific phases of lifting and assembly is non-negotiable. This research embarked on a survey directed at project stakeholders, aiming to gauge the perceived significance and efficaciousness of prevailing quality preservation and oversight protocols during the aforementioned site stages, subsequently employing the Importance-Performance Analysis(IPA) for data interpretation. The findings elucidated that, while a majority of quality assurance procedures were adeptly executed, perceptual disparities existed among stakeholders regarding certain aspects, prompting recommendations for enhancement. This investigative endeavor lays a foundation, aiding future studies in amplifying the quality assurance cognizance among professionals during modular construction's site-assembly phase.

A Study to Analyze the Assembly Process of Precast Concrete Wall Panels in Beam-Column Frame Apartment Buildings (보-기둥구조 PC공동주택 PC벽체의 조립공정 분석 연구)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Min-Jun;Lee, Dong-Gun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.495-506
    • /
    • 2024
  • Unlike reinforced concrete(RC) construction, the primary determinant of construction schedule for precast concrete(PC) apartment buildings is the lifting equipment. To establish a dry process-centric construction schedule, this study analyzes the lifting unit process for core, internal, and external PC wall components, which differ from traditional PC components. By examining the assembly process of these wall types, the study aims to determine the construction cycle for a standard floor frame of a PC apartment building. The findings will serve as foundational data for developing construction schedules for PC apartment buildings utilizing PC walls.

Development of the Model Using Queueing Theory for Lifting Planning in Tall Buildings (큐잉이론을 이용한 고층건물 가설리프트 계획모델 구축에 관한 연구)

  • Lee, Hak-Ju;Kim, Dae-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.628-633
    • /
    • 2008
  • Tall building construction has been increasing due to the need to maximize land usage. It causes the increase of vertical transportation for workers and materials, which significantly affects the productivity and lifting planning, therefore, has to be made carefully based on the characteristics of the field. However, the existing method to calculate the number of lift is too simple to consider complex and various characteristics in tall building construction. Accordingly, we developed the model for selecting the best system of vertical transportation by using Queueing theory. To find out the situation of the queue of resources such as material and workers, a simulation program will be applied.

  • PDF

Decision Support Model for Selecting of Lifting Methods for Large Spatial Roof Construction (대공간 지붕철골공사 양중공법 선정을 위한 의사결정지원모델)

  • Cha, Min-Su;Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.489-498
    • /
    • 2018
  • The purpose of this study was to propose a decision support model for selecting a lifting method of large spatial roof construction. First, we deducted influential factors consist of 6 factors and 19 sub-factors through literature reviews and expert's advices. Second, the relative importance of each factor was calculated by Analytic Hierarchy Process. As a result, 'site condition(0.237)' among 6 factors and 'available space of the site(0.118)' among 19 sub-factors were identified as the most important factor for selecting lifting method. In addition, methods and procedures were established for evaluating alternatives of lifting methods for each influential factor. A decision support model was completed by providing the Site Suitability Index(SSI) of each lifting method. Finally, we got advices form experts who were actually in charge of the works for large spatial construction project to validate the model. The model proposed in this study was analyzed to be useful in selecting the lifting method. The findings of this study are expected to support the decision making of on-site managers when they select the lifting method on the beginning of the project.