• Title/Summary/Keyword: 실적정보 분류체계

Search Result 14, Processing Time 0.02 seconds

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

A Study on NOS Model System for The Construction Work Planing and Management (건설 시공 계획 및 관리 업무의 적용을 위한 NOS 모델 구축 연구)

  • Choi, Jaejin;Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.10-18
    • /
    • 2016
  • This study presented a new NOS model through the following suggestions to apply the construction work planing and management to NOS(Network Operating System). First, This study presented CIMS(construction information classification system) reflected the characteristics of facility classification - functional component classification - functional component classification - work classification - resource classification. Based on this system. this study presented how to establish PMMB(performance measurement management baseline) with proposed master target equation which analyzed the trend of performance measurement management baseline and proposed work target equation which analyzed the execution results. Finally, this study presented NOS model that can be applied to fixed price method and cost plus fee method through the theoretical verification of executive performance analysis method.

Reforming Business Classification Systems of Merchants: A Case of S-Card's Customer Segmentation Strategy (S카드사의 가맹점 분류체계 정비를 통한 고객세분화 전략)

  • Park, Jin-Soo;Chang, Nam-Sik;Hwang, You-Sub
    • Information Systems Review
    • /
    • v.10 no.3
    • /
    • pp.89-109
    • /
    • 2008
  • Korean card firms suffered harsh setbacks due to high credit defaults in 2002 and 2003, after issuing cards recklessly. Their key principle is changed to grow without damaging profitability and financial soundness. However, competition in the credit card market is heating up rapidly. Bank-affiliated card firms, having stronger sales networks and more capital than independent issuers, have increased their investments in card affiliates in a bid to develop new cash cows. Moreover, newly emerging independent card firms have waged fiercer campaigns to raise their credit card market share. In order to overcome these business conditions, S-card has settled on a strategy that focuses on stepping up marketing aimed at increasing charge card spending rather than credit card loans or cash lending services. Accordingly, S-card reformed the current business classification system of merchants, which was out-of-dated and originally built for the purpose of deciding merchant service fees only. They also drove customer segmentation planning to deliver the right customers to the right merchants. In this paper, we emphasize the problems of business classification systems of merchants with which most credit card firms have faced, and the need for reforming them not only to provide customer-tailored services but also to raise their business promotion excellence by reviewing S-card's process of customer segmentation.

해양안전 정보의 효율적 제공방안

  • Seong, Dong-Gwon;An, Jang-Hyeon
    • Information and Communications Magazine
    • /
    • v.34 no.6
    • /
    • pp.73-79
    • /
    • 2017
  • 해마다 증가하고 있는 피서철 해수욕장 안전사고 및 비선박 사고의 감소를 위해 본고에서는 연안해역정밀조사 자료를 활용한 해양안전지도의 제작 및 체감형서비스를 구축하여 서비스하는 방안을 마련하였다. 해양안전에 관련한 각종 자료를 수집, 현장조사, GPS측량, 전문가 및 현지주민의 인터뷰 등을 통해 취득하였다. 서비스에 이용될 기본 배경지도로는 5m급 육상 지형기복도와 국립해양조사원의 수심자료를 사용한 해저지형기복도를 융합하여 제작, 이용하였다. 각종 해양안전관련 정보들은 해양영토(구역), 어촌양식, 항로, 각종사고이력, 시설, 위험요소 등 해양안전과 관련한 총 26종의 다양한 분류체계를 구성하여 구축하였다. 이렇게 수집, 구축된 기본 해양공간정보들을 바탕으로 사용자에게 정보의 전달성을 고려하여 국민이 간접적으로 체감할 수 있는 형태의 사이트(해수욕장 등)별 도면 형태의 해양안전지도를 제작하고, 개방형 대국민 해양공간정보 웹서비스인 '개방해(海)', 해양전문 공공기관용 웹서비스인 '공유해(海)' 대국민 해야안전정보 앱서비스 안전해(海)'와 시스템들을 구축하여 서비스 방안을 구축하였다. 각 서비스에는 해양안전사고 예방을 위한 각종 안전 및 위험정보 콘텐츠들을 수록하였고, 목적에 따라 이용가능한 분석 기능들을 제공하였으며, 위험구역에 노출될 경우 사용자간 위험을 알려주는 알림 기능 등을 제공함으로써 위험에 노출되고 조치하는데 도움을 줄 수 있도록 하였다. 그 결과, 현재 각종 기관에서 해양공간정보의 이용을 확대하고자 연계신청 증가와 더불어, 대국민 서비스 이용자수가 증가하는 실적을 기록하였으며, 향후 보다 광범위한 영역에서 안전사고, 안전대응, 안전관리 등의 분야에서 대책 도구로 활용이 가능할 것으로 기대된다.

An Empirical Study of Financial Analyst's Forecasting Activities on the Firm's Operating Performances (기업실적에 대한 재무분석가의 예측활동에 관한 실증연구)

  • Kwak, Jae-Seok
    • The Korean Journal of Financial Management
    • /
    • v.20 no.1
    • /
    • pp.93-124
    • /
    • 2003
  • This paper studies the financial analyst's forecasting activities on the firm's operating performance during the period from 1999 to 2003. In this study, financial analyst's forecasting activities are focused on the sales, operating income and net income and financial analyst's forecasting accuracy, forecasting revising patterns and forecasting activities to the unexpected firm's operating performance are studied. Some empirical findings in this study are as follows. First, standard estimate error on the sales, operating income and net income are all significantly negative value and so financial analyst's forecast on the firm's operating performance are upwardly biased. Second, domestic financial analyst's forecasting activities is relatively more accuracy than foreign financial analyst's forecasting activities. Third, forecasting time is more close to the end of the operating performance announcement day, forecasting activities are more accuracy. Fourth, comparing with individual financial analyst's forecast, consensus forecast is more accuracy. Fifth, in the comparative forecasting activities study according to the prior firm's operating performance, financial analyst's forecasting revision activities are found to be upward or downward. Sixth, financial analysts overreact in the sales forecast and underreact in the operating income and net income forecast. Seventh, in the empirical analysis on the Easterwood-Nutt's test model(1999) which the firm's performance change are divided into the expected performance change and the unexpected performance change, it is found that financial analyst's forecasting activities on the firm's operating performance are systematically optimistic.

  • PDF

A Basic Study for Sustainable Analysis and Evaluation of Energy Environment in Buildings : Focusing on Energy Environment Historical Data of Residential Buildings (빌딩의 지속가능 에너지환경 분석 및 평가를 위한 기초 연구 : 주거용 건물의 에너지환경 실적정보를 중심으로)

  • Lee, Goon-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.262-268
    • /
    • 2017
  • The energy consumption of buildings is approximately 20.5% of the total energy consumption, and the interest in energy efficiency and low consumption of the building is increasing. Several studies have performed energy analysis and evaluation. Energy analysis and evaluation are effective when applied in the initial design phase. In the initial design phase, however, the energy performance is evaluated using general level information, such as glazing area and surface area. Therefore, the evaluation results of the detailed design stage, which is based on the drawings, including detailed information of the materials and facilities, will be different. Thus far, most studies have reported the analysis and evaluation at the detailed design stage, where detailed information about the materials installed in the building becomes clear. Therefore, it is possible to improve the accuracy of the energy environment analysis if the energy environment information generated during the life cycle of the building can be established and accurate information can be provided in the analysis at the initial design stage using a probability / statistical method. On the other hand, historical data on energy use has not been established in Korea. Therefore, this study performed energy environment analysis to construct the energy environment historical data. As a result of the research, information classification system, information model, and service model for acquiring and providing energy environment information that can be used for building lifecycle information of buildings are presented and used as the basic data. The results can be utilized in the historical data management system so that the reliability of analysis can be improved by supplementing the input information at the initial design stage. If the historical data is stacked, it can be used as learning data in methods, such as probability / statistics or artificial intelligence for energy environment analysis in the initial design stage.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

An Integrated Construction Management System Based on the Earned Value Concept (EV개념에 의한 통합건설공사관리시스템)

  • Chung Chul-Won;Lee Jeom-Su;Oh Kyu-Whan;Chang Jin-Sik;Lee Yu-Seop;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.155-162
    • /
    • 2001
  • Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

  • PDF

A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges (경량전철 교량의 생애주기비용 분석에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai;An, Dong-Geun;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.384-389
    • /
    • 2006
  • The needs for Light Railroad Transit(LRT) have been increased due to the heavy traffic congestions in large cities like Seoul, Korea. Korean government is seeking the LRT system development (including planning, designing, construction, and maintenance and operations) in terms of public-private-partnership (PPP). At the private sector side, it is crucial to estimate the life cycle cost (LCC) to project the cash flow during the O&M period. Since the most construction and O&M cost of LRT project is at the bridge construction, a cost analysis model and a cost breakdown structures (CBS) on LRT bridges are discussed through in depth literature reviews. Construction and maintenance cost of bridges are collected and analyzed. LCC is analyzed by types of bridge superstructures and historical data of repair and rehabilitation (R&R) is investigated. There have been scarce number of LCC analysis on railway bridges. This research delivers a well-defined CBS and maintenance cost data, which will be a great benefit to the systematic maintenance strategy development for railroad bridges.

  • PDF