A Study on Algorithm for Materials Take-off Using Pothole Detection System (포트홀 감지 시스템을 이용한 보수재료량 산출 알고리즘 개발)

  • Kim, Kyungnam;Kim, Sung-Ho;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.3
    • /
    • pp.603-610
    • /
    • 2017
  • Various type of pavement deterioration such as crack, bumpy, pothole is rapidly increasing according to the accelerated environmental changes like heavy rainfall, frequent snowing, difference temperature, etc. Accident related to pothole that cause fatal traffic accidents has been increased more than five times over the next five years starting from 2008. As direct or indirect damage by pothole which caused injuries and car damages increases every year, quicker and more efficient management measures are necessary. This study presents the algorithm for materials quantity take-off. The algorithm was suggested by correlation in pothole size and area. Suggested algorithm were confirmed the validity through the 15 field survey in capital area. According to the results of survey, usually the residual materials at which 5~7 kg was generated decreased to 1~2 kg. It showed that automatic pothole detection system is expected not only to reduce materials and resources, but also to contribute to quality improvements of pavement through more accurate material take-off from the situation of constructing rely on their own judgement.

Bolted Bonding Method of Steel Pipe Pile and Cap (볼트식 강관말뚝 머리보강 방법)

  • 박영호;김성환;장용채
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-71
    • /
    • 1998
  • Present bonding methods which connect steel pipe and spread footing in pile foundation have been generally used. These methods however showed lots of difficulties in the quality control. A new bonding method, which is called 'Bolted Bonding Method(BBM)' , is developed. This method uses factory-made parts so that it may increase the degree of quality, and workability, and is being adopted in the Held concerned. The method is verified by the structural analysis and laboratory test and then a new design formula is proposed. In addition, a comparison test of the present methods and BBM are conducted to observe the applicability and economy of the latter. As results, it is observed that BBM shows 5 to 10 times faster in Held work and 9% to 50% cheaper in construction cost than the existing methods.

  • PDF

An optimal mix design of sound absorbing block on concrete ballast in urban train tunnel (도시철도 터널내 콘크리트 도상용 흡음블럭의 최적 배합설계)

  • Lee, Hong-Joo;Oh, Soon-Taek;Lee, Dong-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.75-82
    • /
    • 2016
  • As spreading of train concrete ballast leads to the increase resounding friction noise, an porous sound absorbing block is applied in urban train tunnel as a counterparts against the friction noise. Three steps of major variables tests for an optimal mix design of the block are conducted to pursue the light weight of the block. Pilot property tests of the block for the cases of the fly-ash only as lightweight aggregates are carried satisfying KRT(Korean Rail Transit) and new KRS(Korean Railway Standards). Based on the results of pilot tests, required structural strength and admixture effects are evaluated. Additionally, typical lightweight aggregates are replaced so that lightweight and strength are improved for serviceability of poor working conditions and proper maintenance in urban train tunnel.

Development of Wide Connection Method for Vertical Joints of Precast Concrete Walls (프리캐스트 콘크리트 벽체 수직접합부의 광폭형 연결방식 개발)

  • Choi, Eun-Gyu;Shin, Yeong-Soo
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.5
    • /
    • pp.549-556
    • /
    • 2009
  • This research analyzed the structural efficiency and application by improving the 100 mm width vertical joint to 150 mm and developing three connection methods to reduce the difficulty in assembling and handling PC walls. Moreover, nonlinear finite analysis was used for analyzing. From the analysis results, when double width connection was applied, the PC wall showed larger load capacity and ductility due to the steel bar sharing loads efficiently. Moreover, as the dimension of loops and the number of bars increased, the maximum load capacity increased as well. Also, among the double width connections, the largest capacity showed in the order of welding, ring and C type loop. However, in case of welding type loop connection, the ring type loop is more stable due to changes in different site conditions. Therefore, thorough quality control of welding is necessary.

Recent Issues in the Design and Construction of High-Performance Shotcrete Lining (고성능 숏크리트 라이닝의 설계 및 시공기술 분석)

  • 배규진;이석원;박해균;이명섭;김재권;장수호
    • Tunnel and Underground Space
    • /
    • v.14 no.1
    • /
    • pp.1-15
    • /
    • 2004
  • The development of high-performance shotcrete lining is essential in improving the long-term durability of tunnels and in introducing single-shell tunnelling methods, where shotcrete as well as rockbolts are used as permanent support members. In this paper, new and advanced admixtures to improve shotcrete performance are introduced. In addition, requirements for mechanical properties as well as test items for quality control of shotcrete are summarized. A case study on the application of the pneumatic pin penetration test which can estimate compressive strength of shotcrete more easily and quickly is also illustrated. Previous studies to analyze the behaviors of shotcrete lining by considering its transient hardening and to carry out the sensitivity analysis of the design parameters of shotcrete lining are discussed to give fundamental concepts on rock-support interactions. Representative single-shell tunnelling methods where high-performance shotcrete lining is applied as a permanent support are also introduced.

A Case Study of Life Cycle Cost Analysis on Pavements in Apartment Complex (단지내 도로포장별 생애주기 비용 분석(LCCA) 사례 연구)

  • Jung, Jong-Suk;Park, Yong-Boo;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.297-303
    • /
    • 2014
  • Recently, block and permeable pavements have been placed in apartment complex. However. it is hard to decide the cycle of maintenance and repair due to lack of performance evaluation criteria for these pavements. This study carried out life cycle cost analysis(LCCA) to present resonable alternatives of the pavements by considering initial construction cost, maintenance and repair cost along with the cycle of repair. According to results of LCCA, the interlocking concrete block pavement is the best alternative when the repair cycle of 20years is assumed, while asphalt concrete pavement is the best alterative when the repair cycle of 10years is assumed. Therefore, the repair cycle is most important factor to select alternative. Also, it is necessary to develop resonable performance evaluation index to quantify the cycle of maintenance and repair in the future.

Stability Analysis of the Foundation of Hazardous Material Storage Tank for Preventing Leakage Accidents (누출사고 방지를 위한 위험물 탱크의 기초 안정성 분석)

  • Lim, Jong-Jin;Ku, Jae-Hyun
    • Fire Science and Engineering
    • /
    • v.34 no.4
    • /
    • pp.96-100
    • /
    • 2020
  • The leakage of hazardous materials due to the defect in storage tank foundations is likely to cause tremendous fire disasters in the industry cluster area. Thus, adequate design and construction of the tank foundation is required for preventing tank leakage. In this study, four types of typical tank foundations were classified and modeled for 3D FEM analysis to perform stability evaluation on tank foundations. Furthermore, numerical analysis indicated that stress concentration just below the tank shells is 40 times that at the tank center. The settlement influence zone is about the tank radius and tank diameter in the horizontal and vertical directions, respectively. Thus, the appropriate guidelines for the design and construction of tank foundations were suggested via a comparison assessment of the numerical analysis results on the stress distribution and displacement of the tank foundations.

Strategy Improvement of Construction Management in the Owner's View Point (발주처의 관점에서 바라본 토목사업 CM 제도 활성화 방안)

  • Lee, Sang-Ok;Park, Jin-Hong;Jang, Won-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.463-472
    • /
    • 2012
  • Exemplary contracts of construction management (CM) including highway projects have been carried out in the civil engineering area over the past ten years. However, practical and administrative challenges as transitional circumstances have been revealed in the different participants of supervision, inspection and construction management. Thus, it is important to internally overcome problems and negative perception encountered in civil engineering, and to promote the efficiencies in construction cost and quality. In addition, external efforts should be put to market opening, globalization, and technology development for competitiveness and high value industry. While it is critical to establish the concrete CM system by collaborating with various participants, proven architecture and system have not been provided because of incorrect measurement of CM accomplishment, overlap of responsibility between CM and supervision, and slow deployment in construction field. This paper analyzed the current CM practices and business environments, and presented the possible solutions for strategy improvement of CM in the owner's view point.

Application of Insulation Curing Method with Double Bubble Sheets Subjected to Cold Weather (이중 버블시트를 이용한 단열양생공법의 한중시공 적용 사례)

  • Hong, Seak-Min;Lee, Chung-Sub;Kim, Jong;Jeon, Chung-Kun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.1001-1004
    • /
    • 2008
  • This study reviewed the results of utilization of insulation heat curing method using double layer bubble sheet in slab concrete and mass concrete in cold weather environment. First of all, when double layer bubble sheets are applied, it was shown that slab concrete was protected from early freezing by remaining between 6 and $10^{\circ}C$ even in case outside temperature drops $10^{\circ}C$ below zero until the 2nd day from piling, and in the case of mass concrete, with the maximum temperature difference between the center and surface less than $6^{\circ}C$, crack occurrence index was close to 2 and no hydration heat crack occurred by internal constraint. The insulation heat preservation curing method using the double bubble sheet applied in this field prevented early freezing owing to stable curing temperature management, deterring concrete strength development delay at low temperature, and obtained the needed strength. Also, it was proven that the method is highly effective and economic for cold weather concrete quality maintenance through curing cost reduction like construction period shortening and labor cost reduction, etc by reducing the process of temporary equipment installation and disassembling.

  • PDF

Development of a Cloud-Based Infrastructure Engineering Design Platform Prototype (클라우드 기반의 인프라 엔지니어링 설계 플랫폼 프로토타입 개발)

  • Cho, Myung-Hwan;Pyo, Kil Seop;Youn, Seung Wook;Jung, Nahm-Chung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.559-569
    • /
    • 2022
  • Infrastructure engineering is a field that supports construction (assembly) as a representative industry that creates high added value and jobs by combining science and technology with knowledge, though its importance is underestimated. According to a report from the Ministry of Land, Infrastructure and Transport (Korea), the value-added rate (65.3%) of the engineering industry and the employment inducement coefficient (14 employees per billion won) are three times higher than in manufacturing. In particular,the forward value chain (such as project management and basic design) accounts for less than 10~15% of the total project cost but determines the overall price and quality of the infrastructure facilities. In this study, a work break-down system, design support module and database development method for road design projects for design platform development is presented. Based on the presented development method, a cloud-based infrastructure design platform's prototype is developed. The developed infrastructure engineering platform is expected to provide a web-based design work environment without time/space restrictions and greatly contribute to winning overseas business orders and securing competitiveness.