Suggestion for Integrated Process Quality Control for Facility Management of Smart City at Construction Stage (Smart City 시공단계 시설물 통합품질관리 프로세스 제안)

  • Park, In-Woo;Kim, In-Han;Choi, Jung-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.6
    • /
    • pp.535-544
    • /
    • 2016
  • Korean government is promoting "K-Smart City" to overseas market which is an integrated solution of construction industry with ICT(Information and Communciations Technologies) industry. Due to nature of Smart City, construction quality and the development quality of the facilities need to be established to improve the overall quality. However, guidelines and regulations to initiate quality control for Smart City are behind the actual demand. This deficiency is bringing quality control for construction and ICT to be controlled separately causing lack of synergy and resulting in overall quality degradation. This research is designed to improve the construction quality of Smart City during its establishment stage by integrating ICT system with on-site construction (Integrated control center and on-site equipment). The adoption of this research to a real Smart City case had resulted in 22% reduction of construction inspection failure (Audit), and also allowed Construction Company to pre-align quality control of all purchased items of ICT Infra that resulted in 18% reduction of nonconformity, thus contributing to an overall quality improvement. This research is expected to be used widely among all construction industry of Smart City.

Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects (해외 LNG Plant 프로젝트 초기 프로세스 분석 및 지식관리시스템 프로토타입 구축)

  • Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.151-159
    • /
    • 2009
  • Recently, overseas construction projects have been increasing in the Middle East and Southeast Asia regions. These projects require various licenses and technologies for the manufacturing and handling processes. Additionally, the efficiency of the entire process management life cycle determines the success or failure of the business. Nonetheless, there exist various risks involved in the whole life cycle process due to a lack of experience and knowledge of management techniques. The objective of this paper is to analyze the business process of a LNG plant throughout the pre-construction and procurement phases, and to identify the knowledge and information needed for the development of the KMS. The study also plans to build a comprehensive knowledge management system throughout the whole life cycle as its final objective.

Establishment of Standard Construction Process of the Infill Modular Construction System (인필 모듈러 건설시스템의 표준 시공프로세스 구축)

  • Kim, Chang-Han;Jung, Chan-Woo;Kim, Hyeong-Su;Hwang, Hyun-Jun;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.245-246
    • /
    • 2012
  • Lately the Infill Modular Construction System which meets the domestic standards about the structure and fireproof performance and which is applied to the remodeling techniques is being emphasized. In order to introduce the Infill Modular Construction System to domestic market successfully, the development of insufficient element technologies and systematic analysis of process should be preceded. This research aims to establish of Standard Construction Process, as advanced research for the settlement of the Infill Modular Construction System. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve work efficiency. In addition organizing optimized Standard Construction Process by steady work analysis and improvement is being planned.

  • PDF

Development of Green Building Construction Process for Quality Improvement of Green Building -Focus on Case Study(POSCO Green Building)- (그린빌딩의 품질향상을 위한 친환경 시공프로세스 개발 -포스코그린빌딩 사례연구를 중심으로-)

  • Hwang, Hyun-Jun;Kim, Dae-Geon;Ryu, Kyoung-Gu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.301-302
    • /
    • 2013
  • Green building can contribute to reduce the energy usage dramatically and can be applied to new building projects. This paper explored the efficient construction process for sustainable and green building. Construction process will be performed on the new green building projects and performance evaluation will be carred out as well. For this background, a pilot project of POSCO Green Building provides how to invigorate the low-energy green building which ensure quality and performance by establishing process concept of construction phase to realize the sustainable green building.

  • PDF

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

The Production Process and Mock-up Test of Freeform Concrete Segments using LOM type 3D Printer (LOM 방식 3D 프린터를 이용한 비정형 콘크리트 부재 생산 프로세스 및 Mock-up test)

  • Lee, Dong-Youn;Lee, Dong-Min;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.89-98
    • /
    • 2018
  • Recently, the importance of the construction technology of the free-formed buildings is becoming more significant, as the interest and demand for the free-formed buildings are increasing. However, it takes much time and cost during the construction of free-formed buildings because the current construction technique of freeform concrete segments is manufactured by a formwork. Therefore, in this study, we suggested a new manufacturing process based on the LOM-type 3D printer for freeform concrete segments that can shorten construction time and reduce cost when constructing freeform concrete segments, and we also verified the feasibility of production process through mock-up test. The result shows that the suggested process shortened 47.8% of production time and saved 56.2% of cost compared to the existing steel formwork method. In conclusion, it is expected that the production method of freeform concrete segments using 3D printer will contribute to the improvement of productivity of freeform concrete segments construction and the activation of new construction method for free-formed building construction.

Analysis and Optimization of ICT Application in Construction Phase (시공단계 ICT 도입 효과분석 및 최적화 방안)

  • Go, Tae-Yong;Kim, Ryul-Hee;Lee, Dong-Eun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.2
    • /
    • pp.175-184
    • /
    • 2019
  • This paper presents a modeling prototype that optimizes construction processes implementing information communication technology (ICT). Using "IAMB", each and every actual steps of the construction process may be defined visually and explicitly by elaborating ICT to improve productivity and management efficiency. It contributes to identify the features on what parts of construction task are covered by ICT, and the effects of ICT on process performance. After analyzing 10 real project cases, ICT application types are classified into four categories according to ICT type, job functions that ICT applied, and the project phase in which ICT used. As a reuslt, it was confirmed that the positive outcomes on the construction process were beneficial to mostly the general contractors and mainly obtained by automated information processing, external consignment and consistent information use. Negative effects, which were occurred by mainly manual manipulation and duplication of information handling, were accrued to general contractors minimally, but to subcontractors maximally. Expert focus group commends that several important issues should be considered when implementing ICT.

A Study on Application of Improved Tunnel Water-Sealing Grouting Construction Process and the Inverse Analysis Material Selection Method Using the Injection Processing Results (개선된 터널 차수그라우팅 시공 프로세스 적용 및 그 주입시공결과를 이용한 역해석 재료선정방법 연구)

  • Kim, Jin Chun;Yoo, Byung Sun;Kang, Hee Jin;Choi, Gi Sung;Kim, Seok Hyun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.101-113
    • /
    • 2022
  • This study is planned with the aim of developing a systematic construction process based on the scientific and engineering theory of the water-sealing grouting construction applied to the tunnel excavation process during the construction of the downtown underground traffic network, so that the construction quality of the relatively backward domestic tunnel water-sealing grouting construction is improved and continuously maintained no matter who constructs it. The main contents of the improved tunnel water-sealing grouting can be largely examined in the classification of tunnel water-sealing grouting application and the definition of grouting materials, the correlation analysis of groundwater pressure conditions with groundwater inflow, the study of the characteristic factors of bedrock, and the element technologies and injection management techniques required for grouting construction. Looking at the trends in global research, research in the field of theoretical-based science and engineering grouting is actively progressing in Nordic countries (Sweden, Finland, Norway, etc.), Japan, Germany, and the United States. Therefore, in this study, the algorithm is established through theoretical analysis of the elements of tunnel water-sealing grouting construction techniques to provide an integrated solution including a construction process that can effectively construct tunnel water-sealing grouting construction.

소방시설 시공관리 체계에 관한연구

  • Ha, Nak-Yong
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2013.11a
    • /
    • pp.216-217
    • /
    • 2013
  • 소방산업의 분야는 크게 소방시설의 설계와 감리, 시공, 점검관리, 소방기구의 제조 등으로 나누어 볼 수 있다. 근래에 들어 우리 소방산업은 학계, 업계 및 연구기관을 중심으로 지속적인 발전을 가져오고 있는 것 또한 사실이다. 그러나 소방시설의 시공 분야 중 시공관리 부분은 아직도 체계적이지 못한 것이 현실이다. 그러기에 시공관리 부분의 입문자는 실무에서 직접 배워야 하는 것이 현실이다. 이에 본 논문에서는 실무를 중심으로 소방시공관리 체계를 구축하였다.