Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

A Study on the CM at Risk Business Model using Business Model Canvas (비즈니스 모델 캠버스(BMC)를 이용한 시공책임형 CM 비즈니스 모델에 관한 연구)

  • Park, Kyungmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.23-31
    • /
    • 2016
  • The domestic market of CM at Risk has not been activated yet. It was analyzed duo to the fact that construction owners didn't have confidence in CM at Risk, because of the concerns regarding CM firms reliability, service, specialty, system and feasibility. Therefore, this study analyzed the problems to find the reason for declines in orders through a business diagnosis based on the Business Model Canvas(BMC) and set up the direction of business model improvement with one on one expert interviews. Additionally, we suggested the sub-activities for the business model improvements of CM at Risk service that are divided into 9 building blocks. Through this method, we determined that we would need preceding innovation activities such as good communication with customers, reinforcement of subcontract and excellence in project operations to convert the successful practice and settlement of the CM business model based in BMC. It is expected that the business model suggested from this study would contribute to improvement of CM at Risk competition and the differentiation strategy when compared with other firms. Also, it would be used a basis data to develop CM at Risk business model in the future.

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk (국내 시공책임형 CM 오픈북 정책 현황 분석을 통한 개선방안)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.3-11
    • /
    • 2016
  • CM at Risk has been introduced in Korea to keep up with the global standards of construction management and provide a higher quality of cm service in line with a rapid change of the construction industry recently. However, it is widely considered that more time would required to settle down the system due to a lack of understanding towards CM at Risk, shortage of reliability and low capability to manage and undertake CM at Risk. Therefore, this research is analyzed problems of contract types, open book policies, and contract conditions of 33 numbers of projects undertaken by a bespoke domestic construction management firm in this research. Moreover, this research is suggested a method to establish an open book policy of CM at Risk aiming a better customers satisfaction through staff training, simplifying and improving a payment system, and a way to settle down an open book policy by improving a performance management system on site. It's expected that this research will contribute to a more competitive system with more dominating the market and a differentiation of the service so as clients to rely more on the CM at Risk.

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.

A Current Status Study on the Introduction of CM at Risk on the Domestic Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 도입 현황 분석)

  • Yoo, Seung-Kyu;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.5-8
    • /
    • 2009
  • This paper investigated the qualitative introduction status of domestic major construction company. And that focused on a point of suggestions about CM at Risk introduction. The survey analysis showed that three importan suggestions. First, the biggest obstacles factors to CM at Risk introduction that related laws is lagging amendment. Second, we have to improve the available hands ability in domestic major construction company. And last, we have to do that using uncomplicated design and standard design form. Consequently, environmen analysis for the introduction and example project is urgently required.

  • PDF

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service (조달청 맞춤형서비스 사업에 대한 '감독 권한대행 등 건설사업관리용역(CM)' 과업내용 개선방향)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.3-11
    • /
    • 2021
  • The construction project manager must clearly carry out the activities of each construction stage specified in the 'Task Description'. In this study, 'design change' and 'completion process' were classified as core tasks in consideration of the frequency and importance of tasks. And, by analyzing the actual construction project, the task contents for the core work were standardized. This laid the foundation for the ordering office, construction project management technicians, and builders to clearly understand the business areas of construction project management and fulfill their responsibilities for their respective tasks.