A Coordinative Committee Model between Architects and Contractors in Design-Build Projects (설계시공일괄공사에서 설계자와 시공자 간의 단계별 중간협의체 운영모델)

  • Kong Seung-Hwan;Kong Seung-Hwan;Eom Ik-Joon;Koo Kyo-jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.323-328
    • /
    • 2004
  • Domestic Design-Build, which has applied for client's convenience, has many problems Because It is being applied in the building law, which devides between architects and contractors. Among problem the relation between architects and contractors is a typical problem. It makes a quality decline and a design skill decline. In result, it causes insufficience of competitive power in overseas projects from now on. So we present the plans to improve mutual relations between architects and contractors. And we induce development of design skill and good quality of building by presenting a coordinative committee model between them in Design-Build projects.

  • PDF

Dispute Settlement in Construction Contracts Under FIDIC (FIDIC에 의한 건설계약 분쟁 해결방안에 관한 연구)

  • Kim, Seong-Chirl;Jung, Byeong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.21-29
    • /
    • 2010
  • International construction contractors are often faced with the situation of working in an unfamiliar construction environment. Under FIDIC rules, the contractor has the right to make a claim requesting the consulting engineer for an adjustment to the contract price or the time for completion when a part or parts of the works have changed, or in the event of unforeseeable conditions. Contractors generally have more access to the costs and time implications of such a change or unforeseeable conditions than the consulting engineer or outside neutrals. Due to such an asymmetry of information, the contractor may be motivated to dispute frivolous claims of less merit, expecting erroneous judgments by the consulting engineer or the neutrals. In this paper, a claiming behavior model is presented by using game theory and experience data to study the manner in which frivolous claims develop into disputes. The model also analyzes the impacts of DAB/DRB upon the frivolous claims.

A View on Water-Leakage and Countermeasure of Concrete Structure (콘크리트 구조물의 누수와 대처 방안에 대한 견해)

  • 오상근
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.6
    • /
    • pp.14-19
    • /
    • 2002
  • 과연 콘크리트 구조물에 있어서 누수 균열은 문제가 되는 것일까? 이에 대해 설계, 구조 시공, 재료(콘크리트), 방수, 품질 및 안전의 관련 전문가는 여러 가지 이견을 말하고 있다. 또한 콘크리트 구조물에 관계하는 발주자, 건축주, 사용자, 시공자의 입장도 상황에 따라 다르게 해석하고, 평가하고 있다. 예를 들면 일반적으로 발주자(건축주 등)는 시공자에게 누수 균열은 하자이므로 무조건 보수할 것을 요구하는 반면 사용자(언론 포함)가 문제를 제기할 때(공공공사의 경우) 발주자는 이에 대해 크게 문제되지 않는다고 답변하는 경우도 많다. 어떤 기술자는 콘크리트의 누수 균열은 피할 수 없는 사항이므로 근본적으로 해결할 수 없으므로 완벽한 시공 및 보수는 어렵고, 다만 전체적인 누수량이 어느 정도 이하가 되도록만 관리할 뿐이라고 말하고, 또한 지하 구조물의 누수 균열은 피할 수 없어, 누수를 시각적으로 가리기 위한 보호벽을 쌓아 관리하는 것이 당연하다고 말하는 기술자도 있다. 그럼에도 불구하고 일반 사용자들은 무조건 누수균열이 없어야 한다고 의견을 제시하고 있다. 특히 언론에 구조물 누수의 문제가 수시로 보도되어 관계자 및 관련 건설기술자들의 자존심이 크게 훼손되고, 이를 보수하기 위한 비용이 엄청나게 지출되고 있음을 볼 때 적당히 간과해서는 안될 문제임에는 틀림없다.(중략)

해외건설공사 수행절차(4)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.9 s.218
    • /
    • pp.51-55
    • /
    • 2008
  • 제출된 입찰서는 대부분 공개적으로 개봉하며, 입찰자의 명칭과 입찰금액이 함께 공표된다. 감리자는 입찰서가 산술적으로 정확한지, 요구된 자재 및 입찰문서의 조건에 부합하는지를 검토하고, 입찰자와 면담 등을 통해 입찰서의 평가를 완료한 후 발주자에게 낙찰(계약)수여에 관해 추천을 한다. 발주자는 낙찰된 입찰자에게 낙찰통지서(Letter of Award) 또는 낙찰(계약)의향서(Letter of Intent)를 발급해 시공자가 작업준비를 할 수 있게 한다. 낙찰통지서를 받은 시공자는 공사이행보증서(Performance Bond) 및 선수금 보증서(Advance Payment Bond)를 제출하고, 입찰보증서(Tender Bond)를 반환 받으며, 계약체결을 완료한다.

  • PDF

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

A Study of 'Payment' related provisions in the Conditions of Contract (대가지급과 관련된 계약조건에 대한 고찰)

  • Hyun Hak-Bong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.17-22
    • /
    • 2001
  • "대가지급"은 시공자(계약상대자)가 계약의 이행을 통해 얻고자 하는 궁극적인 목적이므로 "대가지급"과 관련된 계약조건은 발주자와 시공자 모두에게 공정하고 합리적인 내용이 되어야 할 것인데 우리나라 건설계약에 적용되고 있는 "공사계약일반조건(회계예규 2200.04-104-9, 2001.2.10)"에 규정된 "대가지급" 관련 조항의 내용은 그러한 합리성이 결여되어 있는 문제점이 있다. 대표적인 문제점으로 발주자가 대가지급을 하지 못하거나 지연시키는 경우 지급지연에 따른 이자에 대한 보상규정만을 두고 있을 뿐인데 이는 국제건설계약에 적용되고 있는 계약조건에 규정된 시공자의 권리와는 너무도 큰 차이가 있다 할 것이다. 그러므로 본 고에서는 세계건설시장에서 공정성과 합리성을 인정받고 있는 FIDIC 계약조건에 규정된 "대가지급" 관련 조항의 내용들을 구체적으로 알아보고 이를 통해 우리나라 건설계약에 적용되고 있는 계약조건의 문제점을 파악함으로써 건설제도의 선진화에 일조 하고자 한다.

  • PDF

A Study about Improvement Idea for Performance-based Project Delivery system (성능발주방식의 개념 정의 및 활용방안에 관한 연구 - 공동주택 성능표시 제도를 바탕으로 한 발주자를 위한 체크리스트 -)

  • Lee, Ha-Seung;Baek, Hun-Ku;Shin, Seung-Ha;Lee, Jung-Won;Kim, Kyung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.634-637
    • /
    • 2008
  • Performance-based Project Delivery System(PPDS) is one of Project Delivery System that when owner ask for performance than constructor feel free to choose materials, technology, an engineering method. PPDS rank higher position than Performance Warranty Contract and Technical Proposal Bid. This study aims to propose Improvement Idea for PPDS that based Housing Performance Grading Indication System. 'Request-performance Checklist' is used as communication means(between owner and constructor) and a kind of corroborative facts make the procedures achievement of project like contract easier.

  • PDF

법령과 고시-도시가스사업법시행규칙 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.1 s.198
    • /
    • pp.49-64
    • /
    • 2007
  • 도시가스사업법 시행규칙이 일부 개정되어 지난 해 12월 4일 공포되었다. 도시가스 배관 중 수요자에게 공급하기 위한 저압의 인입관(引入管) 공사 및 단순연결 공사 등 짧은 구간의 배관공사는 상주시공감리에서 제외하여 신속한 가스공급이 이루어지도록 하는 한편, 상주시공감리는 전공정(全公定)시공감리로, 일반시공감리는 일부공정시공감리로 용어를 정비하여 그 의미를 명확히 하고, 가스사용자의 토지 안에 공급관의 가스차단장치를 설치할 수 있도록 하되, 그 가스차단장치의 설치 및 유지관리 비용은 공급자의 부담으로 하는 등 현행 제도의 운영상 나타난 일부 미비점을 개선·보완하려는 것이다.

  • PDF

초고층 건물에서의 연돌효과로 인한 압력분포 및 문제점

  • Jo Jae-Hun;Yeo Myeong-Seok;Kim Gwang-U
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.35 no.5
    • /
    • pp.6-17
    • /
    • 2006
  • 초고층 건물의 설계 및 시공단계에서 고려되어야하는 연돌효과로 인한 압력분포와 제반의 문제점 고찰을 통하여 건설관련 설계자, 시공자 및 HVAC 엔지니어에게 유용한 정보를 제공하고자한다.