• Title/Summary/Keyword: 시공사

Search Result 620, Processing Time 0.025 seconds

Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (AHP 기법을 이용한 BTO 민간투자사업 협상의 주요쟁점 특성분석)

  • Roh, Tae-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.8
    • /
    • pp.234-244
    • /
    • 2007
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

A Study on Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (계층화분석법에 의한 BTO 민간투자사업 협상의 주요쟁점 특성분석에 관한 고찰)

  • Roh, Tae-Ho;Kim, Jong-Won;Lim, Chang-Sik;Lee, Jong-Chool
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.137-146
    • /
    • 2008
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

Analysis of Construction Dispute Cases Considering Reward Ratio Focused on Arbitration Cases of Korean Commercial Arbitration Board (보상비율을 고려한 건설사업 분쟁사례 분석 - 대한상사중재원 중재판정사례를 중심으로 -)

  • Ahn, SangHyun;Choi, Heeju;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.48-56
    • /
    • 2017
  • Construction Projects have many participants by characteristic, scale and contract. Those also have complicated communication structure. So, claim and dispute occur continuously for conflicting communication. In many claim and dispute cases, it usually occurs between builder and owner. Unfair practices by owners position cause main claim and dispute. This study analyses judgment type, cause and compensation ratio in korean commercial arbitration case and provides the dispute information for builder that has weak position by contract. It draws analysis information for managing and controlling dispute that order type, judgement type, cause and failure case. Using these analysis information, it hopes to help inducement of dispute agreement and save time and economic damage for builder during construction. It also hopes to rise construction completeness by providing dispute management information.

A Study on the Characteristics of Supervision Engineer Qualification in China (중국 감리공정사(監理工程師) 자격제도의 특성에 관한 연구)

  • Han, Guang;Shin, Kyoo-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.585-594
    • /
    • 2018
  • Chinese construction corporations take more market shares in the global construction market. The performance of Chinese construction corporations need to be reviewed from the capability and qualification system of the engineers including supervision engineer. The purpose of this study is to analyze the characteristics of professional qualifications for supervision engineer in China. The research methodology is to investigate the qualification exam system, process and examination subjects for searching the fundamental body of knowledge about supervision engineer qualification. The results shows that the qualification system in supervision engineer are classified in detail for the body of knowledge and operated by the government. The qualification examination requires broad and defied knowledge structure together with practical experiences. The research results may lead further research subjects of Chinese construction related qualifications and education system in the ways of more specificity, expertise, and practicality. The mutual understanding of qualification system becomes major issue to build better collaboration in global market.

도시가스사업자 부당행위 개선 이행 실태조사 실시

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.240
    • /
    • pp.35-37
    • /
    • 2010
  • 대한설비건설협회 가스시공협의회(위원장 이효련)는 "지난해 지식경제부가 전국 33개 도시가스사에 도시가스사업자의 우월적 지위를 이용한 부당행위 방지를 위하여 시정을 지시하였으나 2010년 3월 현재 대부분 시정되지 않고 있다" 는 가스시공업계의 민원이 계속됨에 따라 지식경제부 및 한국가스안전공사와 공동으로 도시가스사업자 부당행위 개선 이행에 대한 실태조사를 실시했다. 실태조사 결과 아직도 일부 도시가스회사에서는 부당행위를 개선하지 않고 있는 것으로 나타남에 따라 지식경제부는 미개선 도시가스사에 대하여 이를 조속히 개선토록 지시하고, 그 조치 결과를 한국가스안전공사에 제출토록 하는 내용의 공문을 시달했다.

  • PDF

가스시공안내

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.192
    • /
    • pp.72-72
    • /
    • 2006
  • 대한설비건설협회 가스설비공사협의회(위원장 이효련)가 도시가스시설 사용자공급관 및 특정가스사용시설공사와 관련하여 일부 도시가스사업자의 우월적 지위를 이용, 규정을 벗어난 부당행위가 계속됨에 따라 지난 해 이를 방지하여 줄 것을 산업자원부에 건의한 바 있다. 이에 따라 산업자원부가 대한설비건설협회 가스설비공사협의회의 건의를 반영하여 전국 도시가스회사 및 각 시∙도지사에게 이러한 사례가 재발되지 않도록 공문을 시달(2005년 5월 4일)했으나, 이같은 부당행위가 여전히 근절되지 않고 있다. 이에 본지는 산업자원부가 시달한 공문의 전문을 게재하오니 가스시공업계 회원사에서는 업무에 참고 바란다.

  • PDF

Overseas - Parametric DesignX (해외건축동향: 미국 - 파라메트릭 디자인X)

  • Sung, Woojae
    • Korean Architects
    • /
    • s.570
    • /
    • pp.108-111
    • /
    • 2016
  • 이번 회 및 다음 회 두 회에 걸쳐서 파라메트릭 툴이 건축 설계 및 시공 과정에서 디자인 툴로써 뿐 만이 아니라 설계를 진행하기 위해 주어진 설계 초기 조건을 분석하는 과정 및 시공과정에서의 시행착오와 오차를 줄이기 위한 pre-construction 등에 다양하게 사용되는 경우를 살펴보도록 하겠습니다. 본 프로젝트는 SHoP Architects에 재직 당시 작업하였던 Barclays Center의 Green Roof 프로젝트이며 경기장 안 이벤트나 경기가 벌어질 경우 주변에 들어서는 고층 주거 빌딩 및 기존 주거지역의 소음을 저감하기 위한 일차적 목적과 기존의 방수층이 노출된 지붕의 미관상(fig.01)의 이차적인 목적으로 다른 한 겹의 지붕 층을 추가하는 프로젝트였습니다.

  • PDF

Floating & Underground Space Extension Method for New Seoul City Hall (서울 시청사 뜬구조 공법)

  • Choi, Young-Gil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.254-255
    • /
    • 2013
  • New Seoul city hall completed in 1926 is a registered historical building. The remodeling plan has been developed for the expansion after the review by the governmental agency. Based on the plan, a new city hall should be constructed behind the current city hall while the facade, the main lobby and the dorm structure of the existing building, A new construction method, FUSEM, has been developed for this mission for the safety of the historical structure.

  • PDF

Analysis of the Causes of Defects in Fenestration Construction and Their Impacts on Construction Quality - Focused on Door Hardware - (창호철물공사 하자발생 원인과 시공품질 영향분석에 관한 연구 - 문(Door)에 사용되는 창호철물 중심으로 -)

  • Moon, Sang-Deok;Chung, Jae-Min;Ock, Jong-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.341-350
    • /
    • 2013
  • For this study, a series of interviews with engineers in the Korean construction industry was carried out through a formal workshop format to analyze the causes of the inferior quality of builders' hardware. The authors established the causes of defects in window hardware construction in relation to the three aspects of system, design, and construction as involving the following seven factors: lack of system (including low ability to create construction specifications); low social awareness of the importance of window hardware; low technical capability to create design drawings; low design costs; small manufacturing capacity; low construction cost; and short duration of construction. Among the seven causes, the biggest cause of defects in window hardware construction is the lack of a system (low ability to create construction specifications), followed by low technical capability to create design drawings. In addition, this study carried out basic research to create measures to prevent defects in window hardware construction by analyzing how such causes of defects are distributed depending on the scale of architectural firms and construction companies during actual projects.