• Title/Summary/Keyword: 시공도

Search Result 14,341, Processing Time 0.041 seconds

Current Status and Appropriate Check Method of Construction Quality Control for Rebar Coupler Splice (철근 커플러이음의 시공품질 확인 현황 및 적정 시공품질 확인 방안)

  • Kim, Ju-Yong;Kim, Jin-Dong;Lee, Young-Do;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.531-542
    • /
    • 2022
  • As buildings become taller, the strength of structural materials must increase and the amount of rebar reinforcement also increases while the application of an appropriate rebar splice method in the construction process become one of the essential factors. In this research, the current status of quality check for rebar coupler is identified by an expert questionnaire and an appropriate quality check method is proposed through a quality test on specimens similar to actual on-site construction. In the test results, it was revealed that, among the quality check methods for rebar coupler joints, the coupler tightening method and face to face degree of between upper and lower rebar did not affect the strength the specimen. Therefore, it is considered to be an appropriate way to check the coupler quality check to check whether the threads are completely assembled during on-site construction through manufacture the number of threads of rebar and coupler with a margin beyond the calculated thread number.

A Study on the Near Construction Range Considering the Factors Affecting the Stability of Water Tunnel (수로터널 안정성에 미치는 요소를 고려한 근접시공범위에 대한 연구)

  • Mingyu Lee;Donghyuk Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.5
    • /
    • pp.5-12
    • /
    • 2023
  • Recently, due to urban development and expansion, construction plans have been increasing adjacent to existing tunnel structures such as subways, roads, and large pipelines. Structural plans adjacent to existing tunnels have different effects on tunnel stability depending on the construction method, degree of proximity, and location of new structures. In particular, the pressure water tunnel shows a very large difference from other road tunnels and railway tunnels in geotechnical characteristics and operation characteristics. Therefore, it is necessary to review the safety zone due to adjacent construction in consideration of the geotechnical characteristics of the water tunnel and the new sturure construction method. In this study, the existing tunnel safety zone standards were investigated. A stability evaluation performed numerical analysis considering the deterioration of concrete lining in operation and the characteristics of water tunnel. In addition, the impact of vibration caused by pile construction and blasting excavation of new structures was reviewed. Based on this, a pressure water tunnel safety zone was proposed in consideration of adjacent construction.

Evaluation of Installation Damage Factor for Geogrid using Maximum Particle Size of Backfill Material (뒤채움 최대입도를 이용한 지오그리드 보강재의 시공손상계수 산정 방법)

  • Kim, Kyung-Suk;Choi, Young-Chul;Kim, Tae-Soo;Lim, Seoung-Yoon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.6 no.4
    • /
    • pp.29-37
    • /
    • 2007
  • Reduction Factor for Installation Damage required for calculation of design strength of geogrid used in MSEW(mechanically stabilized earth wall) design is usually obtained in the field test simulating real construction condition. However, damages occurred in geogrid during backfill work are influenced by many factors such as polymer types, unit weight per area, backfill construction method and gradation of backfill material and field test considering these factors demands lots of time and costs. In this study, factors affecting installation damage are analyzed and empirical method for evaluating reduction factor for installation damage using maximum particle size in backfill material is suggested.

  • PDF

Development of the Rebar Auto Placing System Using 3D Structural Information Model (3차원 골조정보모델을 이용한 철근배근 자동생성 시스템)

  • Lee, Byeong-Kwun;Kim, Chee-Kyeong;Kim, Gye-Joong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.72-75
    • /
    • 2009
  • 본 논문에서는 현재 국내에서 구축되어 있지 않은 3차원 BIM 기반 설계 및 시공 환경으로의 패러다임 전환에 대비하여 3차원 BIM 지향적 구조설계 프로그램인 SDP 제품군을 사용하여 BIM 프로그램들을 연동한 3차원 BIM 철근배근 자동생성 시스템을 개발하고자 한다. 현재 국내 건설업계의 치열한 수주경쟁으로 수익률저하/철근 등 자제가 폭등/인건비 상승/배근시공도 작성 인력 부족 및 신뢰성 저하 및 납기 지연 등의 기존 현황의 문제점 등을 SDP 제품군을 이용하여 구조설계/배근시공도 작성/정밀 골조물량 산출을 통합 지원하는 엔지니어링 컨설팅 환경을 구축하여 구조설계 시 V/E 동시 수행, 골조공사비 10% 절감, 배근시공도 및 물량산출 납기 최소로 단축, 배근시공도 정확성 향상/설계 및 시공 변경에 신속 대응, 공정 대비 발주 물량 관리 기능을 제공함으로써 고수익, 고효율, 고품질 의 엔지니어링 컨설팅 수행이 가능하다. 3차원 BIM 을 기반으로 철근현장가공에서 공장가공 전환 가속화로 국가적 물량 절감을 기대할 수 있고, 3차원 BIM 구조설계 및 골조공사 환경 구축 및 기술 자립을 통해 건설시공 분야의 기술력 향상을 기대할 수 있다.

  • PDF

Construction Performance of High Strength Concrete Utilizing Wasted Limestone Coarse Aggregates (석회암 폐석 굵은골재를 사용한 고강도 콘크리트의 시공)

  • Han, Cheon-Goo;Kim, Ki-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.545-551
    • /
    • 2015
  • The aim of this research is suggesting application method of the wasted rock obtained from the limestone quarry of raw material for cement as a coarse aggregate for high strength concrete after crushing and sieving processes. The wasted rock has been normally wasted because of its low quality as a material for cement production. In this research, the concrete using this wasted limestone coarse aggregate was evaluated the constructability based on the performances of workability, air content, and compressive strength. From the experiment, a favorable performance was achieved with a limestone coarse aggregate for high strength concrete comparing to the high strength concrete using granite coarse aggregate.

A Structural Behaviour Analysis System for Simulating the Construction Steps of Prestressed Concrete Bridges (시공단계를 고려할 수 있는 프리스트레스트 콘크리트 교량 전용 거동해석 시스템)

  • 안경한;김대영;이환우;김덕경;김우종;김철영
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1991.10a
    • /
    • pp.96-101
    • /
    • 1991
  • 프리스트레스트 콘크리트 교량은 콘크리트와 PS 강재의 역학적 장점들을 십분 활용하여 경제적인 단면 구성이 가능한 반면, 서로 다른 두 재료의 복합적인 특성들 즉, 콘크리트의 크리이프 (creep), 건조수축 (shrinkage)과 PS 강재의 이완 (relaxation) 등과 같이 시간에 따라 변화하는 인자들로 인하여 복잡한 구조적 거동을 보여 해석상 어려움이 따른다. 이와같은 복합거동은 시공순서와 시공방법에 의해 시공중의 구조계와 지지조건 등이 변화하는 경우에는 더욱 복잡한 양상을 띄게 된다. 뿐만 아니라 박스 거더와 같은 박벽요소에서는 일반적인 보요소(beam element)로는 나타낼 수 없는 ?(warping)을 무시할 수 없으므로 ? 자유도를 구현할 수 있는 특수한 기능의 구조해석용 프로그램의 개발이 절실히 요망된다. 그리고 시공단계별로 출력되는 많은 양의 수치결과들을 설계와 시공실무자에 지향된 형태로 조합, 변형시켜 그래픽 화면상에 나타내는 후처리 프로그램(Post-processor) 기능도 구조해석용 프로그램의 개발 못지않게 중요하다. 본 연구의 목적은 삼성종합건설과 서울대 토목공학과가 공동으로 ?(warping) 자유도를 포함한 7개의 자유도를 갖는 3차원 보요소를 사용하여 PS 콘크리트의 재료적 특성인 크리이프와 건조수축, 그리고 강재의 이완(relaxation)을 포함한 프리스트레싱력의 손실을 고려할 수 있고 시공 단계별 구조계의 변화 및 지지조건들의 다양한 변화를 효율적으로 모사할 수 있는 프로그램의 개발에 있다.

  • PDF

Application of Incentive on Design VE to Public Design-Build Projects (공공부문 설계시공일괄사업의 설계VE 인센티브 적용방안)

  • Lee, Hun-Woo;Jung, Jae-Hoon;Kim, Hae-Gon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.284-288
    • /
    • 2006
  • Ministry of Construction & Transportation prescribes that all of the construction works including Design-Build whose cost more than then billion won must be applied VE at the design phase. It is difficult to apply VE at the design development phase to design-build projects under current design-build contract because design should be proceeded with fixed price by bidding. Therefore the present study suggests an application of incentive which can maximize the effectiveness of design VE in design-build projects after analysing current design-build's characteristics and difficulties of design VE application.

  • PDF

The Efficiency Scheme of Design VE through the Case Studies of Construction VE for Apartments (공동주택 시공VE 사례분석을 통한 설계VE 효율화방안)

  • Kim, Yong-Su;Kim, Young-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.59-67
    • /
    • 2010
  • The purpose of this study is to efficiency scheme to design VE through the case studies of construction VE forapartments. The adapted research method includes five case studies of construction VE and analysis of constructionVE practice. The results of this study are as follows 1) For efficiency of design VE, data management system whichis necessary for construction VE database establishment and its application were proposed. 2) Through workingsystem improvement of construction VE, an improvement to design VE performance process was proposed. 3)Consideration factors and main VE items for efficient design VE item selection of apartment buildings wereproposed.

Generation 3D Structural Information Model by Recognition of 2D Drawings (2차원 도면 인식을 통한 3D 골조모델 생성)

  • Kim, Chee-Kyeong;Park, Chan-Ho;Kim, Hyun-Jung
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.367-370
    • /
    • 2011
  • 최근 설계 단계에서 설계품질 향상과 시공 단계에서 비용 절감을 효과를 기대하며 3차원 BIM 관련 기술에 대한 관심이 높아가고 있으며, 또한 부분적으로 기술 도입 효과가 나타나고 있다. 그럼에도 불구하고 설계 및 시공 현업은 2차원 CAD 도면을 중심으로 이루어지고 있으며, 3차원 BIM 기반 설계가 이루어진다 하더라도 결국 시공을 수행하는 건설 현장에는 2차원 CAD 도면이 납품되고 이를 기반으로 건설 현장은 운영된다. 또한 설계 단계 BIM과 시공 단계 BIM은 모델의 활용 목적이 다르고 그에 따라 모델링의 범위 및 방법이 크게 다르기에 시공 단계에서 2차원 도면에 기반한 시공 BIM 모델 구축이 필요한 현실이다. 본 연구에서는 2차원 구조 CAD 도면을 인식하여 3차원 골조모델을 생성하는 기술을 개발하고 구현하였다. 통합 BIM 모델은 골조, 설비, 마감으로 구성되며, 이 중 골조 모델은 설비와 마감 모델링을 위하여 선행되어야 할 핵심요소이다. 시공 단계 2차원 도면을 바탕으로 골조 모델의 생성을 생성하는 작업에도 많은 노력이 요구되며, 또한 이 과정에서 모델러가 2차원 도면을 파악하여 BIM 도구를 사용하여 모델링을 하는 과정에서 오류의 가능성도 내포되어 있다. 특히 설비, 마감과의 통합 모델 구축이 원활히 되기 위해서는 골조 상세, 즉 부재 편심 또는 단차 등이 정확히 모델링 되어야 한다. 본 연구의 도면 인식을 통한 3D 골조모델 생성은 2차원 구조평면과 부재일람표에 표기된 내용을 그대로 인식하여 3차원 BIM 모델을 생성함으로써 모델링 효율의 극대화와 모델 정확도 향상의 효과를 기대할 수 있다.

  • PDF

설계기준해설 - 과거 터널현장 국부적인 붕락 유형 사례 연구

  • Kim, Nak-Yeong;Hwang, Yeong-Cheol
    • 지반과기술
    • /
    • v.10 no.4
    • /
    • pp.20-31
    • /
    • 2013
  • 본 터널 붕락 사례 연구를 종합적으로 분석해 볼때, 시공 공정 중에 발생 가능한 붕괴 및 붕락은 앞서와 같이 과거의 여러 사례들을 토대로 분석함으로서 예측 할 수 있지만, 시공 외적인 요인에 대해서는 사실상 조사, 설계, 시공 중의 오류에 의해 발생되는 것이기 때문에 파악하기 어렵다. 본 터널 붕락사례를 통해 원인을 분석 정리 하면 다음과 같다. (1) 불규칙한 지반구조적 원인 대부분의 터널 붕락을 일으키는 불규칙한 지반구조는 과거 지반구조의 침식 또는 대규모 지반운동 등 지반구조의 급속한 변화에 기인한 것이다. 터널 시공전에 면밀한 사전 지반조사와 선진 보오링 등으로 정확한 지반구조를 파악한다면 이로 인한 터널 붕락은 최소화 시킬수 있다. (2) 기획과 설계단계에서의 오류 충분치 못한 지반조사에 의한 설계 및 부적절한 시공자재 사용등으로 터널 붕락이 발생 될수 있다. 터널 굴착 주변 지반조건과 이러한 지반조건에 적합한 터널 굴착 및 보강공법 등이 터널 설계시 심도있게 검토되어야 할 가장 중요한 요소이다. (3) 시공 및 관리에서의 오류 경험이 부족한 터널기술자의 현장 감독과 현장에서 수집되는 각종 계측자료의 신뢰성 부족과 결과의 재적용 미흡으로 효율적인 계측 및 지반정보를 활용한 정밀 시공이 이루어지지 않는 것도 터널 붕락의 중요한 요인으로 분석되었다. (4) 현장관리 조사서의 표준화 부족 터널굴착공사중 붕락이 발생된 현장의 막장조사결과를 보면 조사자가 임의로 표시를 하여 각 터널별 막장조사결과가 매우 상이할 뿐만 아니라 각 터널별로 기재방법, 양식이 달라서 실제 원인분석에 활용하기가 어려운 것으로 분석되었다.

  • PDF