• Title/Summary/Keyword: 시공단계 해석

Search Result 318, Processing Time 0.023 seconds

Uncertainty Analysis of Long-Term Behavior of Reinforced Concrete Members Under Axial Load (축력을 받는 철근콘크리트조 부재 장기거동 예측의 불확실성 분석)

  • Yoo, Jae-Wook;Kim, Seung-Nam;Yu, Eun-Jong;Ha, Tae-Hun
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.3
    • /
    • pp.343-350
    • /
    • 2014
  • A probabilistic construction stage analysis using the Monte Carlo Simulation was performed to address the effects of uncertainty regarding the material properties, environmental factors, and applied forces. In the previous research, creep and shrinkage were assumed to be completely independent random variables. However, because of the common influencing factors in the material models for the creep and shrinkage estimation, strong correlation between creep and shrinkage can be presumed. In this paper, an Monte Carlo Simulation using CEB-FIB creep and shrinkage equations were performed to actually evaluate the correlation coefficient between two phenomena, and then another Monte Carlo Simulation to evaluate the statistical properties of axial strain affected by partially correlated random variables including the material properties, environmental factors, and applied forces. The results of Monte Carlo Simulation were compared with measured strains of a column on a first story in a 58-story building. Comparison indicated that the variation due to the uncertainty related with the material properties were most severe. And measured strains was within the range of mean+standard deviation.

Stability Analysis for a Slope Reinforced with Pressure Grouted Soil Nails (가압식 그라우팅 쏘일네일 보강사면의 거동분석)

  • Kim, Yong-Min;Yun, Yeo-Hyeok;Lee, Sung-June;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.12
    • /
    • pp.39-52
    • /
    • 2011
  • This paper describes a new numerical analysis technique in stability analysis for a slope reinforced with pressure grouted soil nails. The installing effect of pressure grouted soil nails can be simulated in this method. Shear strength reduction method associated with finite element method is used for slope stability analysis. Factors of safety for a slope reinforced with pressure grouted soil nails are compared with those for a natural slope and a slope reinforced with gravity grouted soil nails in order to investigate their reinforcing effects. More than 50% increase in the factor of safety is obtained when the slope is reinforced with pressure grouted soil nails compared to the one with gravity grouted soil nails. The reinforcing effects of pressure grouted soil nails become obvious with increase in their length. The reinforcing mechanism of the pressure grouted soil nails for the slope stability can be explained by the slope failure surface expanding gradually toward the backfill. The increased stability of the slope reinforced with pressure grouted soil nails results mainly from their improved pull-out resistance.

Case Study on In-situ Stress Measurement by Over-coring and Its Application to Design of a Pumped Storage Power Plant (오버코어링법에 의한 초기지압측정 및 양수발전소 설계적용사례)

  • Kim, Dae-Young;Lee, Hong-Sung;Lee, Young-Nam
    • Tunnel and Underground Space
    • /
    • v.17 no.2 s.67
    • /
    • pp.90-101
    • /
    • 2007
  • With increasing development of underground space, underground pumped storage power plants, which generate power by felling water in upper reservoir to lower reservoir, have been continuously constructed. For efficient and safe design, construction and maintenance or such power plants, it is very important to understand in-situ stress and the mechanical properties of the surrounding rock mass at the design stage. The power plant presented in this paper is under construction at a depth of $320{\sim}375m$. For stability evaluation of the structure, in-situ stress was measured by over-coring method. Also pressurementer test and a series or laboratory tests were performed to obtain the mechanical properties. Numerical analyses were conducted to check the efficiency of designed support patterns. The results showed that unstable areas occurred partly in the numerical model, and therefore supports were additionally applied. Finally complete stability was obtained and the following excavation has been operated successfully until now.

Punching Shear Failure in Pile-Supported Embankments (말뚝으로 지지된 성토지반 내 펀칭전단파괴)

  • Hong, Won-Pyo;Song, Jei-Sang;Hong, Seong-Won
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.35-45
    • /
    • 2010
  • The mechanism of load transfer by punching shear in pile-supported embankments is investigated. Based on the geometric configuration of the punching shear observed in sand fills on soft ground, a theoretical analysis is carried out to predict the embankment loads transferred on a cap beam according to punching shear developed in pile-supported embankments. The equation presented by the theoretical analysis was able to consider the effect of various factors affecting the vertical loads transferred on the cap beam. The reliability of the presented theoretical equation is investigated by comparing it with the results of a series of model tests. The model tests were performed on cap beams, which had two types of width; one is narrow width and the other is wide width. Sand filling was performed through seven steps. Two types of loading pattern were applied at each filling step; one is the long-term loading, in which sand fills at each filling step were kept for 24 hours, the other is the short-term loading, in which sand fills at each filling step were kept for 2 hours. The vertical loads measured in all model tests show good agreement with the ones predicted by the theoretical equation. Finally, the predicted vertical loads also show good agreement with the vertical loads measured in a well-instrumented pile-supported embankment in field, where cap beams were placed on too wide space.

Practical Design of the Sandmat Considering Consolidation Settlement Properties (연약지반의 침하특성을 고려한 샌드매트의 실용적 설계를 위한 고찰)

  • Lee, Bongjik;Kwon, Youngcheul;Lee, Jongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.5
    • /
    • pp.31-38
    • /
    • 2007
  • The practical design method on sandmat uses a drain length, rate of consolidation settlement and permeability of sand as a major design factors. And, on the basis of this design process, it has been installed beneath the embankment with same thickness. However, the possibility the underestimation on the thickness of sandmat and the delayed drain have been pointed out by several authors caused by a differential settlement at the center and the end of embankment. In this study, therefore, the effect of the differential settlement on the thickness of sandmat and delayed drain through the numerical analysis of embankment was analyzed. As a result, a substantial sandmat thickness becomes small and the possibility of the delayed drain can be certified because of the development of differential settlement at the center and ends of embankment. As a countermeasure to overcome this problem, the applicability of the mound type sandmat was also investigated by the numerical method. It can be concluded that it maintains the designated substantial sandmat thickness throughout consolidation process, and is useful method to maintain the drain capacity. Especially, the mound type sandmat is effective method for a construction site where can cause a differential settlement such as embankment. Furthermore, it has to be designed on the basis of the accurate prediction of consolidation settlement as well as rate of consolidation settlement, drain length and permeability of sand.

  • PDF

Coefficients of Moment Equations for Long-Span Soil-Metal Box Structures (장지간 지중강판 박스구조물의 휨모멘트 계수식 제안)

  • Choi, Dong Ho;Lee, Seung Jae;Cho, Yong Woo;Park, Sang Il
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.133-142
    • /
    • 2006
  • This paper evaluates the moment equations in the 2000 Canadian highway bridge code (CHBDC) for soil-metal box structures, which are applicable to the span less than 8 m. Finite element analyses carried out for soil-metal box structures having spans of 3-12 m using the deep corrugated metal plates under three construction stages; backfill up to the crown, backfill up to the cover depth, and live loading. The coefficients of moment equations are newly proposed based on the results of numerous finite element analyses considering various design variables, such as span length, soil depth, backfill conditions. The validity of the proposed coefficients in the moment equations of the 2000 CHBDC is investigated by the comparison with the existing coefficients and numerical results of finite element analyses. The comparisons show that the moments of the 2000 CHBDC give good predictions for the span less than 8m, but underestimate for the span greater than 8m, whereas the proposed moments give good estimates of numerical results for the spans of 3-12 m. In addition, this study suggests the use of high strength steel to satisfy the requirement of design bending strength for the span greater than 8 m.

Influence of the Existing Cavern on the Stability of Adjacent Tunnel Excavation by Small-Scale Model Tests (축소모형시험을 통한 공동이 근접터널 굴착에 미치는 영향평가)

  • Jung, Minchul;Hwang, Jungsoon;Kim, Jongseob;Kim, Seungwook;Baek, Seungcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.12
    • /
    • pp.117-128
    • /
    • 2014
  • Generally, when constructing a tunnel close to existing structures, the tunnel must be built at a constant distance from the structures that is more than width of tunnel to minimize the impact of interference between an existing structures and new tunnel. Spacing of these closed tunnels should be designed considering soil state, size of tunnel and reinforcement method. Particularly when the ground is soft, a care should be taken with the tunnel plans because the closer the tunnel is to the existing structures, the greater the deformation becomes. As methods of reviewing the effect of cavities on the stability of a tunnel, field measurement, numerical analysis and scaled model test can be considered. In the methods, the scaled model test can reproduce the engineering characteristics of a rock in a field condition and the shape of structures using the scale factor even not all conditions cannot be considered. In this study, when construction of a tunnel close to existing structures, the method and considering factors of the scaled model test were studied to predict the actual tunnel behavior in planning stage. Furthermore, model test results were compared with the numerical analysis results for verifying the proposed model test procedure. Also, practical results were derived to verify the stability of a tunnel vis-a-vis cavities through the scaled model test, which assumed spacing distances of 0.25 D, 0.50 D, and 1.00 D between the cavities and tunnel as well as the network state distribution. The spacing distances of 1.0 D is evaluated as the critical distance by the results of model test and numerical analysis.

Proposal of stability standards for slopes reclaimed by soils mixed with stone dust (석분슬러지 혼합토 매립사면에 대한 안정성 기준 제안)

  • Song, Young-Suk;Kim, Kyeng-Su
    • The Journal of Engineering Geology
    • /
    • v.17 no.3
    • /
    • pp.425-434
    • /
    • 2007
  • In this paper, the stability standards of slopes reclaimed by soils mixed with stone dust were proposed to manage the stone dust as recovery soils. First of all, the mixed ratio between stone dust and natural soil is classified into 5 groups, and a series of soil test was performed in each group. As the results of tests, the shear strength and the maximum dry unit weight were increased in decrease of the mixed ratio of stone dust. On the basis of the investigation to the safety factor standards of embankment slopes in and outside the country, a slope stability rank of slopes reclaimed by mixed soils were divided into 3 stages such as unstable stage, attention stage and stable stage. The slope angle, the slope height and the mixed ratio with stone dust were proposed by the result of stability analysis of slopes reclaimed by mixed soils. As the result of slope stability analysis, the slope angle of 1 : 1.8 at the reclaimed slope should be constructed in case of the slope height of 10 m. Also, the slope angle of 1 : 1.8 and the mixed ratio of stone dust less than 50% should be constructed in case of the slope height of 15 m. The analysis result of reclaimed slope constructed inside the quarry is similar to that of reclaimed slope constructed on the open ground in same conditions of the slope angle, the slope height and the mixed ratio with stone dust. The proposed stability standards of slopes reclaimed by soils mixed with stone dust can be used practically at the quarrying site.

The Stability and Characteristic Analysis of Cut Slope Behavior using Real-time Monitoring System (상시 계측시스템을 이용한 붕괴 절토사면 거동 특성 분석 및 안정성 해석)

  • Baek, Yong;Koo, Ho-Bon;Jang, Ki-Tae;Yoo, Byung-Sun;Bae, Gyu-Jin
    • The Journal of Engineering Geology
    • /
    • v.14 no.1
    • /
    • pp.71-80
    • /
    • 2004
  • The failure of cut slopes frequently occurs particularly during the thawing season and the rain season in summer. This study interpreted data collected from site to which a real-monitoring system was applied in order to analyze the causes of ground behaviors and to forecast future slope failure. As for research methods, this study analyzed the size and mechanism of failure by integrating the results of field surveys and measurements. Furthermore, it analyzed data transmitted by the monitoring system installed in the a result, three times of ground displacement occurred as well as a number of partial tension cracks. The cut slope composed of sandstone and siltstone started its initial behavior as a result of torrential downpour and the loss of support of the substructure. For quantitative analysis of the characteristics of ground behavior, this study measured 5 lateral lines. According to the result of the measurement, displacement happened little in the section to which countermeasure had been applied, but displacement of maximum 400mm happened in the section to which countermeasure had not bee applied. The analysis of data on displacement and rainfall suggested a close relationship between ground behavior and rainfall. According to the result of stability interpretation along with the change of ground saturation, stability rate appeared to be less than 1.0 when ground saturation is over 55%. Although the current trend of ground behavior is at a stable stage falling within the range of tolerance, it is considered necessary to continue monitoring and data analysis because ground displacement is highly possible with the change of temperature during the winter.

A Study on Communal Action as Found in the Ox Seeking Pictures of Daesoon Thought (대순사상 심우도의 공공작용 연구)

  • Kim, Yong-hwan
    • Journal of the Daesoon Academy of Sciences
    • /
    • v.31
    • /
    • pp.165-197
    • /
    • 2018
  • The purpose of this article is to investigate communal action in the Ox Seeking Pictures of Daesoon Thought as an expression of future prospects. The Ox Seeking Pictures in Daesoon Thought seeks out renewal of thought, renewal of life, and true living. Here, the Ox Seeking Pictures symbolize a world in which good fortune comes true according to faith in Gucheon Sangje. The correlation between searching for the ox and the supporting teachings of the Reordering Works of Heaven and Earth in Daesoon shows the transformation of Daesoon prospects for achieving the renewal of thought. The correlation between Deep Contemplation Leading to Awakening and Finding and Following Heavenly Teachings shows the transformation of Daesoon reason into a practice implemented in daily life. The correlation between a human being's awareness and the heavenly paradise of the Later World shows transformation into true living based on everyday practice and the practical transformation of one's livelihood. In this investigation, we can say that the Ox Seeking Pictures of Daesoon symbolizes the realization of human dignity and respect for lives. No life should be destroyed or violated by another. Heaven, Earth, and Humanity can be changed and born anew. The visions of the realization of the heavenly paradise of the Later World show that this paradise in the world results from Daesoon principles. This provides a unique insight when compared to the bodhisattva ideal conveyed through the Ox Seeking Pictures of Mahayana Buddhism. Daesoon's Ox Seeking Pictures consist of a three-way interlocking of renewal of thought, implementation in life, and the practical transformation of one's livelihood. The communal spirituality based in Daesoon Truth connects and mediates among people and appears in three aspects. Firstly, it is thought to be a vision of the renewal of thought through the 'Virtuous Concordance of Yin and Yang.' Secondly, it is thought to be the vision of a new life based upon the spirit of Mutual Beneficence. Thirdly, it is thought to be a vision of true living through the realization of human dignity. Because of the appearance of the Ox Seeking Pictures of Daesoon Thought, this narrative picture shows the oxherd as searching for an ox which is the symbol of Daesoon Truth and Dao. Even though he catches the ox, he is still holds the rope to tie the ox to himself. He makes an effort to keep the ox steady. Finally, the oxherd's enlightenment becomes the source of responsibility to help unenlightened people in their struggles. In conclusion, it is necessary to interpret these paintings as the start of the Later World.