• Title/Summary/Keyword: 시공관리자

Search Result 82, Processing Time 0.022 seconds

Analysis of Basic Capabilities for Building Demolition Experts - Focused on Domestic and International Cases (건축물 해체공사 전문인력을 위한 기본역량 분석 - 국내·외 사례를 중심으로)

  • Lee, Kyung-Koo;Shin, Yong-Seob;Lee, Hyung-Yong;Chun, Jae-Youl
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • The rising number of accidents during building demolition work has significantly heightened interest in this field. This study undertakes a comprehensive analysis of the essential capabilities required for building demolition experts, drawing on both domestic and international examples. This includes an examination of training courses for building demolition inspectors and the competencies mandated for structural demolition roles as per Korea's National Competency Standards(NCS). Furthermore, the study reviews the qualification tests and training programs for building demolition professionals in the United States, Japan, and England. The research concludes that the expertise needed for demolition construction professionals should be categorized into seven key domains: legal, structural, safety, planning, operational, constructional, and environmental aspects. These competencies are further divided across three professional tiers: technician, engineer, and manager.

Real-time load monitoring system based mobile (무선 기반의 실시간 부하 모니터링 시스템)

  • Park, Hong-Jin
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.9
    • /
    • pp.1095-1100
    • /
    • 2004
  • The computer system is gradually complicated because of explosive growth of computer system and IT technology. For efficient management of complicated system, system load monitoring technology is essential. In this paper, we is implemented the real-time load monitoring system based mobile than the traditional methods that are used load-related commands in system manager or specific load application programs based connected wire. Advantage of implemented load monitoring system in this paper is freely saw load information in time and space though mobile method like as PDA, cellular phone, more than traditional methods intime and space.

  • PDF

Application of BIM technologies for maintenance of subway structures (지하철 구조물 유지관리를 위한 BIM 기술 활용)

  • Shim, Chang-Su;Kim, Seong-Wook;Yun, Nu-Ri;Song, Hyun-Hye
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.91-94
    • /
    • 2011
  • 시설물 전생애주기에 걸쳐 정보가 공유되고 피드백 될 수 있는 BIM(Building Information Modeling) 기술의 등장은 유지보수 관리자들에게 가장 필요한 유지관리점검 도구의 의미를 지님과 동시에, 정보모델을 기반으로 주요 기술영역 및 사업주체간 원활한 의사소통이 가능해지도록 한다. 효율적인 지하철 터널의 유지관리를 위해서는 체계적으로 조직된 데이터가 필수적이다. 설계, 시공, 유지관리 단계별로 효과적인 협업을 위한 유기적인 단일 모델이 요구된다. BIM기반의 지하철 터널 구조물의 유지관리를 위해 건설정보분류체계 및 이를 보안한 유지관리점검 표준분류체계를 적용한 정보모델을 개발하였다.

  • PDF

사업관리 절차서 개선 효율화 방안

  • Yun, Jae-Ho
    • Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.58-64
    • /
    • 2003
  • 건설 프로젝트를 수행함에 있어서 사업관리운영 절차서는 매우 중요하다. 국내에서는 일부 대형 공공 사업을 제외하고 프로젝트의 특성에 맞는 절차서를 개발하여 적용한 예는 드물다. 이러한 점을고려하여 현재 공사가 진행죽인 대표적인 국내민간자본 SOC사업을 표본으로 삼아 절차서의 활용현황을 검토분석하고 그에 따른 효율화 방안을 구하여 보았다. 이를 위해서 사업수행주체인 발주자, 사업관리자, 감리자, 설계자, 시공계약자 등을 대상으로 현재 보유/사용하고 있는 절차서에 대한 이해도, 사업관리지식체별 업무절차에 대한 이해도를 설문조사하였다. 설문조사의 분석결과를 토대로 건설사업관리수행상 업무수행절차의 전반적인 이행실태를 점검하여 문제점을 도출함으로서 향후 사업관리운영절차서의 체계적인 개발을 위한 추진방향을 설정하고 사업관리전반에 대한 인식제고와 효율적인 사업관리체계의 적용방안을 모색하여 제시하였다.

Analysis of Ambivalence Differences among Groups for Temporary Firefighting Facilities of Workers at Construction Sites (공사현장 근로자의 임시소방시설에 대한 집단 간 Ambivalence 차이분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.765-778
    • /
    • 2021
  • The purpose of this study is to prevent fire accidents in advance by deriving prior knowledge among groups about temporary fire-fighting facilities of workers at construction sites and devising appropriate improvement measures. The findings are as follows.First, in the case of fire extinguishers, statistical attention was paid to the contractor, supervisor, partner worker and fire extinguisher manager between designations. 87% of fire managers and 70% of facility supervisors said fire extinguisher management managers needed to be designated for each type of construction, which requires designation of fire extinguisher management managers, frequently checking and relocating. Second, in the case of simple fire extinguishing facilities, statistical attention was paid to the application of penalties for unauthorized use of fire extinguishing facilities with construction companies, supervisors, and business partners.Third, in the case of emergency alarm measures, statistical attention was paid to the application of emergency alarm sound to temporary broadcasting facilities with construction works, supervisors, and business partners.Fourth, in the case of induction, statistical attention was paid to the application of connection between construction works, supervisors, and partner workers, such as passage guidance, emergency lighting, etc.It was found that 65% of construction workers and 55% of electrical workers had different applications such as aisle guidance and emergency lighting for each type of business partner. In order to resolve blind spots such as evacuation zone guidance due to the structure of the building, it is necessary to easily distinguish the direction of the entrance door from a long distance by applying it in conjunction with passage guidance lights and emergency lighting.

Working Design Management of the Design Build Projects Using CBR (CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안)

  • Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.432-437
    • /
    • 2002
  • As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.

  • PDF

Analysis of Practical Use Cases and Proposal for Improvements of Machine Guidance System Utilized in Smart City Construction Projects (스마트시티 건설현장에 활용된 머신 가이던스 시스템의 실무 활용사례 분석 및 개선방안 제시)

  • Kim, Sung Yeop;Lee, Won Hyo;Kang, Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.3-10
    • /
    • 2024
  • The purpose of this study is to analyze the effects of smart construction equipment applied at the construction site of the first smart city in the Korea and derive an application strategy for the utilization of smart construction equipment. To achieve this, aythors examined the practical effects and issues of safety systems and construction systems utilizing machine guidance (MG) technology, which is a representative smart construction equipment used in civil engineering construction sites. Both the MG safety system and MG construction system were found to be sufficiently effective in improving construction productivity. However, there are challenges that need to be addressed, such as the approval process for work results using MG systems, system changes due to frequent replacement of on-site equipment, and usability improvements for elderly on-site workers. The study presented some solutions that have been implemented on-site to address these issues. The utilization effects and issues presented in the study were analyzed through direct feedback from workers and managers who have utilized the MG technology on-site for a considerable period of time. These results can be used as preliminary data for the similar construction projects, considering the limited availability of empirical analysis data for equipment automation.

Construction Lean Process Development and Application for Field Productivity Improvement (건설 현장 생산성 향상을 위한 Lean 프로세스 개발과 적용에 대한 연구)

  • Kim, Yong-pyo;Jeong, Yong-ho;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.88-97
    • /
    • 2020
  • Practical and efficient application of lean construction, which has been proposed as an alternative to the limitations of traditional construction management methods, was developed to facilitate application on site and improve productivity through the fusion of traditional construction management methods. The concepts of Lean Time and Lean Cycle Time, which are the principles of lean construction, were introduced to eliminate waste and smooth flow production and pursuit of perfection, and the goal of establishing and improving the criteria for measurement and improvement was established and the information collection template was configured and applied to ensure reliability of measurement and analysis. Based on this, the project feasibility, reliability, and continuous improvement process were applied to the Field case to verify its effectiveness.

Effect of Opponents' Communication Styles on Job Stress of Building Construction Field Managers (상대방의 커뮤니케이션 유형이 건축공사 현장관리자 직무스트레스에 미치는 영향)

  • An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.177-183
    • /
    • 2018
  • The communication issue in the building construction site organization effects on the job stress of the field mangers, because the field managers are working with various members in the construction site organization. Therefore, the purpose of this study is to investigate the effect of opponents' communication styles on job stress of the building construction field managers. As a result of this study, it was found that the job stress felt by the building construction field managers was differed according to the opponents' communication styles. In special, when the communication style of the opponents of construction field managers was an emotive style or a director style, job stress was higher. However it was a supportive style or a reflective style, job stress was lower. The results of this study are expected to help to build the site organizational management system to improve the performance of construction work in the building construction projects.

A Study of Risk Management in Major Hospital Construction Projects (효율적인 리스크 관리방안에 관한 연구)

  • Kim Sang-Il;Lee Jae-Sub
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.242-245
    • /
    • 2003
  • Most engineering tasks require collaboration between many users in major hospital Construction Projects that have many risks. Loss of cost and change orders occurred in factors such as information exchange, misunderstandings, advanced Technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. Each part of the major hospital construction projects have been rapidly changed technology of equipments. Therefore it is a major challenge to make a high level of communication and to have mutual understanding. The objective of this paper is to reduce risks for the design process and construction process of hospital projects.

  • PDF