• Title/Summary/Keyword: 시공공정

Search Result 517, Processing Time 0.025 seconds

Development of Process Management Manual for Quality Improvement of Green Building (그린빌딩의 품질향상을 위한 공정관리매뉴얼 개발)

  • Kim, Dae-Geon;Hwang, Hyun-Jun;Ryu, Kyoung-Gu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.245-246
    • /
    • 2013
  • The construction of green building has distinct charicteristics by work classification by applying green technologies. Thus if the new technologies are applied to construction, unskiiled worker can experience construction time delay, reconstruction occurrence and quality decrease because of mistakes during the construction and work progress. For this background, we establish the work progress manual to secure quality and performance during the construction phase of green building and provide method to be used in the construction sight operation.

  • PDF

A Study on the Plan Establishing Process Data System for the Process Plan of Construction Works (건설공사의 공정계획을 위한 공정정보 시스템 구축에 관한 연구)

  • 안효수;권춘안
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.142-147
    • /
    • 2001
  • Recently, as the field of construction industrial is enlarged and the blanket control system is formed, the process plan considered from initial process formation to construction cost must be systematic and rational. So we have to propose and compose the new process formation system that divides the intention decisive property of construction data, its relationship and the data property according to process definitely and can express and control easily the public ownership of construction data and network process under the peculation control. So this study decides the field formation and construction data of the work according to the ordering and contract way to establish the process data system for the process plan, shows that the lot theory is necessary to form the economical construction field and proposes that the integrated formation system of construction data that is made by code system must be established.

  • PDF

Database establishment method for process scheduling by means of simulation (시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론)

  • Ko, Yong-Ho;Noh, Jae-Yun;Ngov, Kheang;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

Development of Construction Performance Indicators Using Artificial Neural Network and Discrete Construction Simulation for Earthmoving Operation (토공사 공정관리를 위한 이산형 건설시뮬레이션과 인공신경망 기반 건설성능지표 도출 방법론)

  • Jung, Dahyun;Park, Seongbong;Lee, Sumin;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.10-11
    • /
    • 2021
  • Demands for digital transformation of the construction industry are increasing to improve the accuracy of the construction operation planning and the performance of the construction operation. Even though large number of studies are being conducted to this date, most of the studies are not likely to be available on the real sites. Therefore, this study provides construction managers with a methodology of drawing construction performance indicators based on productivity analysis using Artificial Neural Network (ANN) models and Web-CYCLONE. This methodology is expected to have high utilization and precision of construction operation planning and management.

  • PDF

Hydroelectric Sorting Process is coal Gasification Slag Effect on the Quality of fine Aggregates (수력선별 공정이 석탄 가스화 용융 슬래그 잔골재 품질에 미치는 영향)

  • Hu, Yun-Yao;Kim, Su-Hoo;Han, Jun-Hui;Kim, Jung;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.120-121
    • /
    • 2021
  • This study examines the performance of the pre-treatment process system to use CGS, a by-product generated in IGCC, as a concrete fine aggregate for construction materials, on the quality of CGS fine aggregate. As a result of the analysis, it is judged that the quality of fine aggregates of CGS can be improved at both density, absorption rate, and 0.08mm body passage amount after the hydroelectric screening process using water as a medium during the pretreatment process. It is believed that it can be used as basic data for national standard certification of CGS fine aggregates in the future.

  • PDF

Planning and Scheduling using EOT Claim analysis (EOT 클레임 분석 기법을 활용한 공정관리)

  • Woo, Han Kil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.248-249
    • /
    • 2021
  • Planning and Scheduling in Korean has been developed from Bar Chart to CPM, integrated management and EVM were attempted. As growing of overseas projects, Scheduler was also recognized as important one. However, the reality is that most Korean construction projects still remain in the preparation of construction plan and construction schedule in 1990s. The global Planning and Scheduling trend is EOT claims. I would like to understand the global trend of EOT claims and EOT analysis, and to find out Planning and Scheduling measures to successfully promote EOT claims.

  • PDF

Facade Cleaning Process Analysis For Construction Robot System Design of High-rise Building External wall Maintenance (고층건물 외벽 유지보수 건설로봇 시스템 개발을 위한 청소공정 작업절차 분석)

  • Kim, Dae-Geon;Kim, Bok-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.77-79
    • /
    • 2011
  • As residents and building owners demand maintenance that is required to achieve sustainable building performance, efficient building management methods are required. Even though the demand for maintenance systems is increasing, current maintenance work for high-rise buildings mostly uses conventional ropes and gondolas that pose a high risk of accidents and exhibit poor performance and efficiency. Thus, there is an urgent need to develop an automation robot system that can reduce accidents and improve the maintenance efficiency of the conventional high-rise building façade maintenance system. As a preceding work for the development of an automation robot system, this study classified and analyzed the work processes of actual construction sites and proposed basic techniques for the work mechanisms of the robot system by investigating the motions of cleaning workers.

  • PDF

Integration of Construction Inspection to Schedule Management (공정관리와 연계한 건설 검측 업무 체계화 방안)

  • Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF

Effectiveness Analysis of the Construction Schedule for PC Apartment Buildings using a Tower Crane (타워크레인을 적용한 대단지 PC공동주택의 공정계획 효용성 분석)

  • Kim, Ki-Ho;Lee, Bum-Sik;Lee, Dong-Gun;Kim, Min-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.105-106
    • /
    • 2023
  • In project projects where various factors arise, the construction company's initial establishment of a reasonable process plan reduces various variables and potential risks. In order to create a densely written initial process plan, it is necessary to compare the economic feasibility of time and money by reflecting Slack time. Through this, site managers can lead a successful project based on reasonable and stable construction.

  • PDF

Crack Control of Wall type Structures by Shrinkage and Temperature Reinforcement (수축ㆍ온도 철근에 의한 벽체형 철근 콘크리트 구조물의 균열 제어)

  • 김영진;김상철
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.2
    • /
    • pp.52-60
    • /
    • 2002
  • 지하철 구조물과 같은 매스 콘크리트 구조물을 시공할 때 온도 측정을 하는 경우는 많으나 이는 내외부 온도차를 적정한 수준으로 유지하여 균열 발생을 제어하기 위한 수단일 뿐 균열폭을 일정한도 내로 제어할 수 있는 조치는 아니다. 매스 콘크리트 구조물에서 균열폭을 제한 값 이하로 하기 위해서는 적절한 양의 철근을 배치하여야 한다. 또한 시공 이음 등을 작은 간격으로 설치하는 것은 구속도를 완화시키고 온도응력이나 균열폭을 저감시켜 균열 제어상 매우 효과적인 수단이 될 수 있다. 그러나 시공 이음, 균열 유발 줄눈 등의 이음간 간격을 좁히면 내하력 수밀성, 내구성 등에 악영향을 미칠 가능성이 높고, 타설 회수가 많아져 동일한 공정이 반복 투입되므로 시공 속도의 저하 및 공사비 상승 등의 단점이 나타날 수 있다.(중략)