• Title/Summary/Keyword: 스마트-시티

Search Result 649, Processing Time 0.028 seconds

Derivation of Components for Feasibility Study of Smart City Public and Private Partnership Projects (스마트시티 민관합동사업의 타당성분석 구성요소 도출)

  • Hyun, Kilyong;Jin, Chengquan;Lee, Sanghoon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.98-110
    • /
    • 2023
  • The smart city public and private partnership project is a project to build and operate a sustainable city by investing land and capital in public-private partnership to build urban infrastructure and providing various urban services. It highly depends on the precise feasibility study and the projection of the various factors affecting the project during the planning stage to get the project successful. However, it is very difficult to predict the possibility of the project success in advance due to various physical and social factors. It is necessary to derive factors affecting the project at the planning stage and respond with appropriate analysis in order to solve these problems and to carry out a successful project. Therefore, this study derived preliminary components for feasibility study through previous studies and order status analysis and presented feasibility study components such as five-step processes, 10 process items, 19 analysis items, and 54 detailed analysis items through the Delphi method. It can be expected that this research is to contribute corresponding to diversified possible risks and facilitate the projects during the promotion.

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

Development of SVM-based Construction Project Document Classification Model to Derive Construction Risk (건설 리스크 도출을 위한 SVM 기반의 건설프로젝트 문서 분류 모델 개발)

  • Kang, Donguk;Cho, Mingeon;Cha, Gichun;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.

Progressive Evaluation of Concrete Deterioration Caused by Chloride-Induced Steel Corrosion Using Impact-Echo Testing (충격 반향 신호 모니터링을 통한 철근 부식 진전에 따른 콘크리트 상태 평가)

  • Rizky Pitajeng;Julfikhsan Ahmad Mukhti;Seong-Hoon Kee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.3
    • /
    • pp.37-46
    • /
    • 2024
  • This study investigates the evolution of concrete damage due to chloride-induced steel corrosion through Impact-echo (IE) testing. Three reinforced concrete specimens, each measuring 1500 mm in length, 400 mm in width, and 200 mm in thickness, were fabricated using three concrete mixture proportions of blended cement types: ordinary Portland cement, ground granulated blast-furnace slag and fly ash. Steel corrosion in the concrete was accelerated by impressing a 0.5 A current following a 35-day cycle of wet-and-dry saturation in a 3% NaCl solution. Initial IE data collected during the saturation phase showed no significant changes, indicating that moisture had a minimal impact on IE signals and highlighting the slow progress of corrosion under natural conditions. Post-application of current, however, there was a noticeable decline in both IE peak frequency and the P-wave velocity in the concrete as the duration of the impressed current increased. Remarkably, progressive monitoring of IE proves highly effective in capturing the critical features of steel-corrosion induced concrete deterioration, such as the onset of internal damages and the rate of damage propagation. These results demonstrate the potential of progressive IE data monitoring to enhance the reliability of diagnosing and prognosticating the evolution of concrete damage in marine environment.

Development of Evaluation Indicators for Optimizing Mixed Traffic Flow Using Complexed Multi-Criteria Decision Approaches (다기준 복합 가중치 결정 기반 혼재 교통류 최적화 평가지표 개발)

  • Donghyeok Park;Nuri Park;Donghee Oh;Juneyoung Park
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.2
    • /
    • pp.157-172
    • /
    • 2024
  • Autonomous driving technology, when commercialized, has the potential to improve the safety, mobility, and environmental performance of transportation networks. However, safe autonomous driving may be hindered by poor sensor performance and limitations in long-distance detection. Therefore, cooperative autonomous driving that can supplement information collected from surrounding vehicles and infrastructure is essential. In addition, since HDVs, AVs, and CAVs have different ranges of perceivable information and different response protocols, countermeasures are needed for mixed traffic that occur during the transition period of autonomous driving technology. There is a lack of research on traffic flow optimization that considers the penetration rate of autonomous vehicles and the different characteristics of each road segment. The objective of this study is to develop weights based on safety, operational, and environmental factors for each infrastructure control use case and autonomous vehicle MPR. To develop an integrated evaluation index, infra-guidance AHP and hybrid AHP weights were combined. Based on the results of this study, it can be used to give right of way to each vehicle to optimize mixed traffic.

Review of No Net Loss(NLL) of Wetland and Suggestion of Appropriate NLL in Korea (내륙습지 총량관리제도의 고찰 및 도입 방안 제안)

  • Yujin Kang;Junhyeong Lee;Taewoo Lee;Duckgil Kim;Jaeseung Seo;Soojun Kim;Hung Soo Kim
    • Journal of Wetlands Research
    • /
    • v.26 no.3
    • /
    • pp.227-235
    • /
    • 2024
  • Inland wetlands provide important ecosystem services or functions, including biodiversity conservation, water purification, flood control, and carbon sequestration. However, many inland wetlands are being degraded by urbanization and industrialization, raising the need for conservation and restoration. This study proposes the adoption of No Net Loss(NLL) of Wetland for wetland conservation and restoration in Korea by the review of the literatures. To this end,, we analyzed the wetland conservation and management systems of the United States, Canada, Germany, Japan, and Australia, and identified institutional features and success factors of each country, and sought ways to adapt them to domestic conditions of Korea. The case of the United States highlights the importance of legal frameworks and public-private collaboration, Canada demonstrates systematic management approaches, Germany maintains a balance between development and conservation, Japan underscores the need for cooperative conservation efforts, and Australia emphasizes the efficiency of offset markets. The introduction and operation of these schemes are expected to contribute to climate change mitigation, biodiversity conservation, and water quality improvement, but ongoing research and policy efforts are needed to ensure that the schemes are well established.

Smart Space based on Platform using Big Data for Efficient Decision-making (효율적 의사결정을 위한 빅데이터 활용 스마트 스페이스 플랫폼 연구)

  • Lee, Jin-Kyung
    • Informatization Policy
    • /
    • v.25 no.4
    • /
    • pp.108-120
    • /
    • 2018
  • With the rise of the Fourth Industrial Revolution and I-Korea 4.0, both of which pursue strategies for industrial innovation and for the solution to social problems, the real estate industry needs to change in order to make effective use of available space in smart environments. The implementation of smart spaces is a promising solution for this. The smart space is defined as a good use of space, whether it be a home, office, or retail store, within a smart environment. To enhance the use of smart spaces, efficient decision-making and well-timed and accurate interaction are required. This paper proposes a smart space based on platform which takes advantage of emerging technologies for the efficient storage, processing, analysis, and utilization of big data. The platform is composed of six layers - collection, transfer, storage, service, application, and management - and offers three service frameworks: activity-based, market-based, and policy-based. Based on these smart space services, decision-makers, consumers, clients, and social network participants can make better decisions, respond more quickly, exhibit greater innovation, and develop stronger competitive advantages.

A Study on the Change of Smart City's Issues and Perception : Focus on News, Blog, and Twitter (스마트도시의 이슈와 인식변화에 관한 연구 : 뉴스, 블로그, 트위터 자료를 중심으로)

  • Jang, Hwan-Young
    • Journal of Cadastre & Land InformatiX
    • /
    • v.49 no.2
    • /
    • pp.67-82
    • /
    • 2019
  • The purpose of this study is to analyze the issues and perceptions of smart cities. First, based on the big data analysis platform, big data analysis on smart cities were conducted to derive keywords by year, word cloud, and frequency of generation of smart city keywords by time. Second, trend and flow by area were analyzed by reclassifying major keywords by year based on meta-keywords. Third, emotional recognition flow for smart cities and major emotional keywords were derived. While U-City in the past is mostly centered on creating infrastructure for new towns, recent smart cities are focusing on sustainable urban construction led by citizens, according to the analysis. In addition, it was analyzed that while infrastructure, service, and technology were emphasized in the past, management and methodology were emphasized recently, and positive perception of smart cities was growing. The study could be used as basic data for the past, present and future of smart cities in Korea at a time when smart city services are being built across the country.

Implication of Smart City in Adaption to Silver Population (인구 고령화에 대응한 스마트시티의 함의 탐색)

  • Lee, Jeong-Eon;Lee, Seung-Yun
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2017.05a
    • /
    • pp.459-460
    • /
    • 2017
  • The research proposes theoretical recommendations for Smart City that targets elderly citizens. The elderly citizens in question are people currently in their mid-50s to early 60s, in order to adequately employ futuristic technologies into four major sectors: healthcare, post-retirement employment, community-based governance, and environment-friendly infrastructure. The research concludes that the technical application of welfare to the elderlies through constructing a purposeful Smart City is desirable, environmental consideration should come in prior concern as a sustainable foundation.

  • PDF

Smart City Standardization Trends (스마트시티 국제표준화 동향)

  • Lee, J.S.
    • Electronics and Telecommunications Trends
    • /
    • v.33 no.2
    • /
    • pp.86-90
    • /
    • 2018
  • ISO, IEC, ISO/IEC JTC 1 and ITU-T have been preparing for smart city standardization since 2013, and as a result of related activities, four international standardization groups, namely, ITU-T SG20, IEC Systems Committee on Smart Cities, ISO TC268, and ISO/IEC JTC 1/WG 11, have been established, and the development of related international standards is progressing. In this paper, the status of the standardization activities of ITU-T SG20, the IEC Systems Committee on Smart Cities, ISO TC268, and ISO/IEC JTC 1/WG 11 are reviewed.