Construction Contract Management Framework Using the Blockchain Technology (블록체인 기반의 스마트 건설계약 프레임워크)

  • Chui, Jinrui;Moon, Sungwoo
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.1-10
    • /
    • 2021
  • Blockchain is a secure technology that enables transactions between parties without risking data corruption. Besides cryptocurrencies, blockchain technology is being widely adopted in various forms by diverse industries. One promising application is construction contracts. Given that construction projects are executed under strict contractual requirements, blockchain technology-based contracts can ensure that contractual requirements are executed among parties to the contract. The objective of this study is to apply blockchain technology to smart construction contracts and determine their potential feasibility in construction management. In this study, a prototype smart construction contract is presented and its applicability is explored. We conclude that smart construction contracts can be effective as a contractual tool to enhance payment flows in the construction process.

Effectiveness Analysis of the Use of Smart Technology on Construction Project Performance (스마트 건설기술의 활용이 프로젝트 성과에 미치는 효과성 분석)

  • Lim, Hyunsu;Cha, Minsu;Yoo, Wi Sung;Kim, Chang-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.227-228
    • /
    • 2022
  • The slowdown of the global economic market due to the pandemic is causing the global construction market to stagnate, and the use of smart construction technology is drawing attention as one of the main alternatives to overcome this problem. In fact, a number of previous studies have been published that smart construction technologies such as building information modeling and drones can contribute to project performance improvement, such as productivity improvement and cost reduction. However, previous studies focus on the application direction and technical effectiveness of smart construction technology, so the analysis in terms of the contribution that the application of the technology has to the project performance is insufficient. Therefore, the purpose of this study is to focus on the effectiveness aspect of the application of smart construction technology on the project performance. The results of this study are expected to be able to be used as basic data for establishing policies related to the activation of smart construction technology promoted by the government and setting the direction for the use of smart construction technology by stakeholders.

  • PDF

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

Apportionment of Liquidated Damages and Compensation for Delay Damages in Domestic Construction Project : Analysis and Improvement (국내 현행 공기지연 책임에 따른 지체상금 및 손실보상의 문제점 및 개선방안)

  • Kim, Kyong Ju;Kim, Kyoungmin;Kim, Jong Inn;Wei, Ameng;Kim, Eu Wang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.12-20
    • /
    • 2023
  • To calculate the amount of owner-caused and contractor-caused delays based on a simplified delay analysis, which has been customarily used in Korea, has a limitation in reflecting the impact of the concurrent delay and the acceleration work. It also resulted in the apportionment of liquidated damages by applying the ratio of the number of delays between the owner and the contractor. This study analyzes that the conventional method does not meet the international standards. In order to improve the problem of construction delay analysis and the apportionment of liquidated damages based on it, owner delays, contractor delays, concurrent delays, and the impact of acceleration should be analyzed together. This study suggests that in the apportionment of liquidated damages, the extension of time should be extended by the sum of concurrent delays and the owner-caused delays, and liquidated damages should be imposed on delays incurred after the extension of time. It can be seen that it conforms to the international standards. The results of this study are expected to contribute to improving the problems of delay analysis and liquidated damages calculation, which have been conventionally accepted.

Blockchain Applications in Construction

  • Bum-Soo, Kim;Seong-Jin, Kim;Do-Young, Kim
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.1
    • /
    • pp.79-86
    • /
    • 2023
  • Construction is one of the oldest fields of providing human living comfort. However, despite the continuous development not only in IT but also in other fields, productivity degradation due to low automation is still serious. In particular, the use of the 4th industrial revolution technologies in construction is just beginning. Blockchain, which is one of the 4th industrial revolution technologies, is a type of a distributed database that is used to replicate, share, and synchronize data spread across different geographical locations, such as multiple sites, countries, or organizations. In this paper, we introduce the block chain and analyze use cases according to seven themes in construction. As a result of the analysis, it is expected to increase the understanding of blockchain in construction and provide usefulness for the development of various services in the future.