• Title/Summary/Keyword: 수직 밀폐형 시스템

Search Result 28, Processing Time 0.029 seconds

Evaluation of a Ground Heat Exchanger Appropriate for the Site of the Third Stage Construction of Incheon International Airport (인천국제공항 3단계 건설부지에 적합한 지중열교환기 시스템 평가 연구)

  • Cho, Nam-Hyun;Song, Jung-Tae;Yoon, Seok;Lee, Seung-Rae
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.5
    • /
    • pp.23-33
    • /
    • 2015
  • In the present study, a ground heat exchanger was installed for each heat source in the system at the site to evaluate ground heat conductivity, constructability, and economic feasibility; the factors considered in the study included ground heat, groundwater, fillers (such as bentonite and pea pebbles) and the shape of the heat exchange pipe (e.g., U and D-U). The aim was to determine the ground heat exchanger appropriate for the geothermal system in the 3rd-phase construction of Incheon International Airport. A comparative cost analysis of the initial costs based on the above information showed that although the initial costs of the regular vertical closed loop-II and modified vertical closed loop were lower than those of the regular vertical closed loop-I, they could not be expected to deliver high economic efficiency from the viewpoint of constructability (filler injection, heat exchange pipe insertion). The initial costs proved to be higher in the case of Geohil.

Regional Distribution of Ground Thermal Conductivity for Vertical Closed Type Ground Heat Exchanger Design (수직 밀폐형 지중열교환기 설계를 위한 지중 열전도도의 지역별 분포)

  • Jung, Kye-Hoon;Sohn, Byong-Hu;Lim, Hyo-Jae
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.423-428
    • /
    • 2007
  • This study was performed to construct a geothermal data base about thermal conductivity of ground heat exchanger and thermal properties of grouting material which used to refill the borehole. We have acquired geothermal data sets from 39 sites over wide area of South Korea except to Jeju island. From data analysis, the range of thermal conductivity is 1.5$\sim$4.0 W/mK. It means that thermal conductivity varies with grouting material as well as regional geology and ground water system.

  • PDF

Numerical Simulations for Optimal Utilization of Geothermal Energy under Groundwater-bearing Conditions (지하수 부존지역에서 최적 지열에너지 활용방식 수치 모의)

  • Kim, Jin-Sung;Cha, Jang-Hwan;Song, Sung-Ho;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.24 no.4
    • /
    • pp.487-499
    • /
    • 2014
  • While the vertical open type of heat exchanger is more effective in areas of abundant groundwater, and is becoming more widely used, the heat exchanger most commonly used in geothermal heating and cooling systems in Korea is the vertical closed loop type. In this study, we performed numerical simulations of the optimal utilization of geothermal energy based on the hydrogeological and thermal properties to evaluate the efficiency of the vertical open type in areas of abundant groundwater supply. The first simulation indicated that the vertical open type using groundwater directly is more efficient than the vertical closed loop type in areas of abundant groundwater. Furthermore, a doublet system with separated injection and extraction wells was more efficient because the temperature difference (${\Delta}$) between the injection and extraction water generated by heat exchange with the ground is large. In the second simulation, we performed additional numerical simulations of the optimal utilization of geothermal energy that incorporated heat transfer, distance, flow rate, and groundwater hydraulic gradient targeting a single well, SCW (standing column well), and doublet. We present a flow diagram that can be used to select the optimal type of heat exchanger based on these simulation results. The results of this study indicate that it is necessary to examine the adequacy of the geothermal energy utilization system based on the hydrogeological and thermal properties of the area concerned, and also on a review of the COP (coefficient of performance) of the geothermal heating and cooling system.

Construction of Ground Effective Thermal Conductivity Database for Design of Closed-Loop Ground Heat Exchangers (밀폐형 지중열교환기 설계를 위한 지중 유효열전도도 데이터베이스 구축)

  • Choi, Jae-Ho;Sohn, Byong-Hu;Lim, Hyo-Jae
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.776-781
    • /
    • 2008
  • A ground heat exchanger in a GSHP system is an important unit that determines the thermal performance of a system and its initial cost. The Size and performance of this heat exchanger is highly dependent on the thermal properties. A proper design requires certain site-specific parameters, most importantly the ground effective thermal conductivity, the borehole thermal resistance and the undisturbed ground temperature. This paper is part of a research project aiming at constructing a database of these site-specific properties, especially ground effective thermal conductivity. The objective was to develop and evaluation method, and to provide this knowledge to design engineers. To achieve these goals, thermal response tests were conducted using a testing device at nearly 150 locations in Korea. The in-situ thermal response is the temperature development over time when a known heating load imposed, e.g. by circulating a heat carrier fluid through the test exchangers. The line-source model was then applied to the response test data because of its simplicity. From the data analysis, the range of ground effective thermal conductivity at various sites is $1.5{\sim}4.0\;W$/mK. The results also show that the ground effective thermal conductivity varies with grouting materials as well as regional geological conditions and groundwater flow.

  • PDF

Impact of Design Parameters on Length and Application Effect of Surface Water Heat Exchanger(SWHE) (지표수 열교환기의 용량과 적용 효과에 대한 설계 인자의 영향)

  • Sohn, Byonghu;Min, Kyong-Chon
    • Transactions of the KSME C: Technology and Education
    • /
    • v.4 no.1
    • /
    • pp.49-56
    • /
    • 2016
  • Commercial buildings are generally cooling-dominated and therefore reject more heat to a vertical ground heat exchanger(GHE) than they extract over the annual cycle. Shallow ponds can provide a cost-effective means to balance the thermal loads to the ground and to reduce the length of GHE. The objective of this work has been to develop a design tool for surface water heat exchanger(SWHE) submerged in shallow pond. This paper presents the analysis results of the impact of design parameters on the length of SWHE and its application effect on geothermal heat pump(GHP) system using vertical GHE. In order to analysis, We applied ${\epsilon}-NTU$ method on designing the length of SWHE. Analysis results show that the required pipe length of SWHE was decreased with the increase of approach temperature difference and with the decrease of pipe wall thickness. In addition, when the SWHE was applied to the GHP system, the temperature of vertical GHE was more stable than that of standalone GHE system.

Cooling and Heating Energy Performance and Cost Analysis of Vertical Closed-loop Geothermal Heat Pump Coupled with Heat Storage Tank Compared to Conventional HVAC System (일반공조 시스템 대비 축열조와 연동된 수직밀폐형 지열히트펌프의 냉난방 에너지 성능 및 경제성 분석)

  • Kim, Min-Ji;Do, Sung-Lok;Choi, Jong-Min;Lee, Kwang Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.11
    • /
    • pp.81-87
    • /
    • 2018
  • Among various types of geothermal heat pump systems, Vertical Closed-Loop Geothermal Heat Pump (VGSHP) has received increasing attention due to a variety of advantages such as the potential to be installed in a relatively small space and improved energy efficiency. In this research, the performance of VGSHP system coupled with heat storage tank was evaluated, by analyzing operational behavior of heat storage tank, the variations of heat pump energy performance due to the connection with heat storage tank, part load ratios characteristics of heat pump and the corresponding energy cost, compared to chiller and boiler based conventional system. The results of this study showed that the VGSHP system coupled with heat storage tank showed an energy saving effect of about 18% for cooling and about 73% for heating, and annual heating/cooling energy cost reduction of 43,000,000 KRW ($ 39,000), compared to the conventional air conditioning system. In addition, after considering both energy cost and initial investment cost including equipment, installation and auxiliary device expenses, payback period of approximately 11.8 years was required.

Measurements of In-situ Thermal Conductivity of Closed Type Ground Heat Exchanger in Korea (국내의 주요 지역에서 밀폐형 열교환기의 열전도도 측정)

  • Jung, Kye-Hoon;Lim, Hyo-Jae;Han, Ji-Won;Park, Kyung-Woo
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.3401-3406
    • /
    • 2007
  • This study was performed to acquire the reliable in-situ thermal conductivity of closed type ground heat exchanger used in ground source heat pump. We selected four sites(Cheonan, Daejeon, Daegu, Gwangju) which are central area of South Korea. Test results show that the effective thermal conductivities are 2.33 W/m$^{\circ}C$, 2.50 W/m$^{\circ}C$, 2.75 W/m$^{\circ}C$ and 2.86 W/m$^{\circ}C$. From this data, we can see that thermal conductivity varies about the range of 23% with the sites. Also, thermal conductivity increases up to 20% by changing grouting material from low salica sand to high one.

  • PDF

A Study on Thermal Conductivity Properties of Ground Heat Exchangers for GSHP systems (지열냉난방시스템 수직형 지중열교환기 그라우트의 열적 특성에 관한 연구)

  • Baek, Sung-Kwon;Jeon, Joong-Kyu;An, Hyung-Jun
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.546-549
    • /
    • 2007
  • 지열 냉난방 시스템의 설계는 냉난방 공간의 크기에 따라 필요한 부하를 계산하여 설계하게된 다. 설계 부하를 충분히 소화할 수 있는 지열교환기의 길이와 보어홀의 깊이 및 개수는 지반의 열적 특성에 크게 좌우된다. 열전도율이 큰 지반일수록 지열교환기 내의 열 흡수 및 소산이 효과적으로 이루어져 지열교환기의 길이도 상대적으로 짧아질 수 있다. 즉, 효율적이고 정확한 설계를 하기 위해서는 지반, 암반 및 지중열교환기의 물리적 특성에 따른 열적 특성을 설계자는 미리 숙지하여야 한다. 현재 국내에서 수직 밀폐형 지중열교환기의 그라우트로 벤토나이트를 가장 많이 사용하고 있으나, 해외의 경우 지중 조건에 따라 시멘트 또는 벤토나이트를 적절히 선택하여 시공하고 있다. 이는 벤토나이트의 특성상 적용 조건이 제약을 받기 때문이며, 특히 지하수가 존재하지 않을 경우 사용이 사실상 불가능하다. 국내에서 이에 대한 충분한 연구는 아직 이루어지지 않았으며, 시멘트 그라우트를 사용하기 위한 물리적, 열적 특성에 대한 연구가 필요한 시점이라 판단하여 본 연구를 수행하였다. 시멘트 그라우트의 경우 수화반응이 일어나는 초기의 건조수축을 최소화하는 배합비로 물성을 구성하였으며, 벤토나이트는 일반 현장 시공 비율을 사용하였다. 열전도율은 첫째 실내 시험으로 시멘트 그라우트에 대한 열판시험법과 벤토나이트 그라우트에 대한 탐침시험법으로 수행하여 구하였으며, 두 번째 방법인 현장 시공으로 직접 현장열응답시험을 수행하여 그라우트 간의 열적 특성을 비교하였다. 또한 기존 시멘트그라우트의 열적 특성을 개량한 코오롱건설에서 개발한 시멘트 그라우트에 대한 열적 거동도 기존 타 그라우트의 열적 거동과 비교하였으며, 개발 제품의 성능이 상당히 우수함을 알 수 있었다.

  • PDF

A Study of the Effect of Borehole Thermal Resistance on the Borehole Length (보어홀 전열저항이 보어홀 길이에 미치는 영향에 관한 연구)

  • Lee, Se-Kyoun;Woo, Joung-Son
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.5
    • /
    • pp.20-27
    • /
    • 2009
  • The effect of borehole thermal resistance on the borehole length is studied. In performing this work a new concept BLRR(borehole length reduction rate) is developed based on the line source model. The solution of line source model is shown to be valid through the comparison with the data of thermal response test. It is shown that BLRR is a function of soil thermal conductivity(k) and borehole thermal resistance($R_b$). The value of BLRR increases with increasing k, which means reducing $R_b$ is more effective when k is high. The reduction of borehole length with change of $R_b$ is easily estimated with BLRR. The validity of BLRR is also examined with EED analysis.

A Study on Entering Water Temperature in Vertical Closed Ground Loop System Considering the Economical Feasibility in Load of the Office Building (사무시설에 수직형 지열원 냉 난방시스템의 경제성을 고려한 인입온도(EWT)에 관한 연구)

  • Lee, Byung-Doo;Lee, Dae-Woo;Lee, Se-Jin
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.579-585
    • /
    • 2009
  • Recently, Vertical-Closed Loop system using geothermal which is the most efficient among the building cooling and heating systems is coming into wide spread due to assistance of domestic policies. However, there is a limitation that a design of ground heat exchanger taking 60% of construction cost is done by GLD and GLHEPRO programs without specific guidelines and consideration on Entering Water Temperature(EWT). For getting an optimal EWT, we analyzed the costs for construction of ground heat exchanger and cooling and heating for 15 years. In the results, reduction of construction costs as the length of ground heat exchanger shortens was much greater than increase of the electrical power consumption as COP gets low. EWT that COP of heat pump can be 3.76 or above was below $31^{\circ}C$ in cooling and was over $5^{\circ}C$ in heating.

  • PDF