• Title/Summary/Keyword: 수용단계

Search Result 762, Processing Time 0.034 seconds

Developing a Methodology for Stakeholder Participation in Site Feasibility Studies for Offshore Wind Farms (해상풍력 입지타당성 조사단계에서의 이해관계자 참여 방법론 개발)

  • Jongmun Park;Kongjang Cho
    • Journal of Wind Energy
    • /
    • v.14 no.2
    • /
    • pp.5-13
    • /
    • 2023
  • As offshore wind farms are developed, the importance of cooperation with stakeholders such as fishermen from the initial phase is gradually increasing. This study developed a methodology that can promote the involvement of fishermen in the site feasibility review process. The spatial scope is Gunsan City, which is establishing an initial offshore wind project strategy. A survey was conducted for representatives of 12 fishing villages on the location preference for offshore wind farms. As a result, fishermen suggested negotiable or absolute opposite locations by examining a local sea map. Location preference seems to depend on the degrees of vitalization of fisheries using vessels. This study shows that fishermen can have reasonable opinions according to the location, not unconditionally, in initial discussions on offshore wind power. Investigating stakeholders with various positions is essential, and adjustments are needed for conflicting points in the future.

EIS-based Interface Model between Controlling and Legacy System. (관리 회계시스템과 Legacy 시스템 간의 EIS 기반의 인터페이스 모델)

  • Han, Sam-Yong;Kim, Jinh-Yung
    • Annual Conference of KIPS
    • /
    • 2007.05a
    • /
    • pp.581-584
    • /
    • 2007
  • RTE(Real Time Enterprise)라는 경영 기법이 21 세기에 대두 되면서 많은 기업들이 환경을 구축하기 시작 하고, 보험사들도 ERP 구축을 통하여 RTE 환경을 이루고자 노력하고 있다. 본 논문에서는 한국 보험사에 구축된 사례를 바탕으로 관리 회계 관점에서의 ERP 와 Legacy 시스템간의 인터페이스를 분석하였다. 이를 통해 유지 보수 단계의 문제점과 시스템 자원 이용의 비효율성 및 시스템 확장에 대한 요구 사항을 쉽게 수용 할 수 없는 구조로 구축 되었음을 알 수 있었다. 이에 대한 해결책으로써 Data Hub 신설 및 코드 항목의 독립 등을 포함한 효과적인 모델을 제시 하며, 그 결과로Disk 이용을 26 % 절약 하고, 유지 보수의 용이성 및 시스템 확정의 용이성을 확보 할 수 있다.

The Study on Stakeholder' Concerns Regarding Consulting for Gifted Education Institutes (영재교육기관 컨설팅에 대한 영재교육 이해관계자의 관심도 연구)

  • Lee, Mi-Soon;Son, Sung Kuk
    • Journal of Gifted/Talented Education
    • /
    • v.26 no.2
    • /
    • pp.235-255
    • /
    • 2016
  • This study examined whether there were differences in stakeholders' concerns regarding consulting in gifted education institutes. A total of 122 stakeholders in gifted and talented education responded to SoCQ(the Stage of Concerns Questionnaire, Hall & Hord, 2011). The SoCQ responses of these stakeholders to consulting for gifted education institutes were converted into relative intensities and SoCQ profiles, which were analyzed by the affiliated areas of institute, teaching years in gifted education, continuities of affairs in gifted education, and approaches to teacher training for gifted education with using t-test and one-way analysis of variance. Results indicated that stakeholders generally showed the highest concern for stage 1(information) and the lowest concerns for stage 4(consequence), which were the initial stage of change and innovation in consulting for gifted education institutes. In the meanwhile, skakeholders having training program for professionals showed the more concern for stage 6(refocusing), which was a kind of resistance for the present consulting for gifted education institutes. On the based on these results, this study suggested ways(or methods) for settlement and the diffusion of successful gifted education consulting.

Development of a Method for Calculating the Allowable Storage Capacity of Rivers by Using Drone Images (드론 영상을 이용한 하천의 구간별 허용 저수량 산정 방법 개발)

  • Kim, Han-Gyeol;Kim, Jae-In;Yoon, Sung-Joo;Kim, Taejung
    • Korean Journal of Remote Sensing
    • /
    • v.34 no.2_1
    • /
    • pp.203-211
    • /
    • 2018
  • Dam discharge is carried out for the management of rivers and area around rivers due to rainy season or drought. Dam discharge should be based on an accurate understanding of the flow rate that can be accommodated in the river. Therefore, understanding the allowable storage capacity of river is an important factor in the management of the environment around the river. However, the methods using water level meters and images, which are currently used to determine the allowable flow rate of rivers, show limitations in terms of accuracy and efficiency. In order to solve these problems, this paper proposes a method to automatically calculate the allowable storage capacity of river based on the images taken by drone. In the first step, we create a 3D model of the river by using the drone images. This generation process consists of tiepoint extraction, image orientation, and image matching. In the second step, the allowable storage capacity is calculated by cross section analysis of the river using the generated river 3D model and the road and river layers in the target area. In this step, we determine the maximum water level of the river, extract the cross-sectional profile along the river, and use the 3D model to calculate the allowable storage capacity for the area. To prove our method, we used Bukhan river's data and as a result, the allowable storage volume was automatically extracted. It is expected that the proposed method will be useful for real - time management of rivers and surrounding areas and 3D models using drone.

Cardiovascular Responses over the Time Course during Muscle Group III Stimulation in Prehypertensive Individuals (고혈압 전단계자들에 대한 골격근 Group III 자극 시 시간에 따른 심혈관 반응)

  • Park, Won-Il;Park, Si-Young;Choi, Hyun-Min;Lee, Joon-Hee;Jeon, Jong-Mok;Kim, Jong-Kyung;Shim, Jae-Kun;Nho, Ho-Sung
    • Journal of Life Science
    • /
    • v.19 no.11
    • /
    • pp.1568-1574
    • /
    • 2009
  • The purpose of this study was to investigate whether group III muscle afferents play an important role eliciting abnormal blood pressure response mediated during passive muscle stretch in prehypertensive individuals. Eleven middle-aged prehypertensive men (average BP 133/80 mmHg) and nine middle-aged normotensive men (average BP 119/74 mmHg) participated in this study. After 1 min rest baseline data collection, the subject's foot was flexed (dorsiflexion) by an automated cybex for one minute. Systolic blood pressure (SBP), diastolic blood pressure (DBP), mean arterial blood pressure (MAP), heart rate, stroke volume, cardiac output, and total peripheral resistance were continuously measured on a beat-by-beat basis from a finger via a Finapres device for 1 minute. To evaluate the role of mechanoreflex, a component of exercise pressor reflex, SBP, DBP, and MAP responses over the course of time were examined. The results showed that the pressor response mediated by the muscle mechanoreflex was faster in prehypertensive individuals compared to the normotensive individuals. The substantial pressor response was observed within mean 20 sec of the onset of passive stretch in prehypertension, while mean 45 sec in normotension (p<0.05). It is concluded that excessive pressor response produced during exercise in prehypertension may be due to the dysfunction of the mechano-receptors.

An Intelligent Monitoring System of Semiconductor Processing Equipment using Multiple Time-Series Pattern Recognition (다중 시계열 패턴인식을 이용한 반도체 생산장치의 지능형 감시시스템)

  • Lee, Joong-Jae;Kwon, O-Bum;Kim, Gye-Young
    • The KIPS Transactions:PartD
    • /
    • v.11D no.3
    • /
    • pp.709-716
    • /
    • 2004
  • This paper describes an intelligent real-time monitoring system of a semiconductor processing equipment, which determines normal or not for a wafer in processing, using multiple time-series pattern recognition. The proposed system consists of three phases, initialization, learning and real-time prediction. The initialization phase sets the weights and tile effective steps for all parameters of a monitoring equipment. The learning phase clusters time series patterns, which are producted and fathered for processing wafers by the equipment, using LBG algorithm. Each pattern has an ACI which is measured by a tester at the end of a process The real-time prediction phase corresponds a time series entered by real-time with the clustered patterns using Dynamic Time Warping, and finds the best matched pattern. Then it calculates a predicted ACI from a combination of the ACI, the difference and the weights. Finally it determines Spec in or out for the wafer. The proposed system is tested on the data acquired from etching device. The results show that the error between the estimated ACI and the actual measurement ACI is remarkably reduced according to the number of learning increases.

The Widening of Fault Gouge Zone: An Example from Yangbuk-myeon, Gyeongju city, Korea (단층비지대의 성장: 경주시 양북면 부근의 사례)

  • Chang, Tae-Woo;Jang, Yun-Deuk
    • The Journal of Engineering Geology
    • /
    • v.18 no.2
    • /
    • pp.145-152
    • /
    • 2008
  • A fault gouge zone which is about 25cm thick crops out along a small valley in Yangbuk-myeon, Gyeongju city. It is divided into greenish brown gouge and bluish gray gouge by color. Under the microscope, the gouges have a lot of porphyroclasts composed of old gouge fragments, quartz, feldspar and iron minerals. Clay minerals are abundant in matrix, defining strikingly P foliation by preferred orientation. Microstructural differences between bluish pay gouge and greenish brown gouge are as follows: greenish brown gouge compared to bluish gray gouge is (1) rich in clay minerals, (2) small in size and number of porphyroclasts, and (3) plentiful in iron minerals which are mostly hematites, while chiefly pyrites in bluish gray gouge. Hematites are considered to be altered from pyrites in the early-formed greenish brown gouge under the influence of hydrothermal fluids accompanied during the formation of bluish gray gouge that also precipitated pyrites. It is believed that the fault core including bluish gray gouge zone and greenish brown gouge zone was formed by progressive cataclastic flow. In the first stage the fault core initiates from damage zone of early faulting. In the second stage damage zone actively transforms into breccia zone by repeated fracturing. The third stage includes greenish brown (old) gouge formation in the center of the fault core mainly by particle grinding. In the third stage further deformation leads to the formation of new (bluish gray) gouge zone while old gouge zone undergoes strain hardening. Consequently, the whole gouge zone in the core widens.

A 2-Step Global Optimization Algorithm for TDOA/FDOA of Communication Signals (통신 신호에서 TDOA/FDOA 정보 추출을 위한 2-단계 전역 최적화 알고리즘)

  • Kim, Dong-Gyu;Park, Jin-Oh;Lee, Moon Seok;Park, Young-Mi;Kim, Hyoung-Nam
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.4
    • /
    • pp.37-45
    • /
    • 2015
  • In modern electronic warfare systems, a demand on the more accurate estimation method based on TDOA and FDOA has been increased. TDOA/FDOA localization consists of two-stage procedures: the extraction of information from signals and the estimation of emitter location. Various algorithms based on CAF(complex ambiguity function), which is known as a basic method, has been presented in the area of extractions. When we extract TDOA and FDOA information using a conventional method based on the CAF algorithm from communication signals, considerably long integration time is required for the accurate position estimation of an unknown emitter far from sensors more than 300 km. Such long integration time yields huge amount of transmission data from sensors to a central processing unit, resulting in heavy computiational complexity. Therefore, we theoretically analyze the integration time for TDOA/FDOA information using CRLB and propose a two-stage global optimization algorithm which can minimize the transmission time and a computational complexity. The proposed method is compared with the conventional CAF-based algorithms in terms of a computational complexity and the CRLB to verify the estimation performance.

Teaching Methods of Inclusive Music Classes at Elementary Schools Based on Application of Understanding by Design and Differentiated Instruction (이해중심 교육과정과 맞춤형 수업의 적용을 통한 초등학교 통합학급의 음악과 수업 방안 연구)

  • Won, Chorong
    • Journal of Music and Human Behavior
    • /
    • v.18 no.1
    • /
    • pp.79-102
    • /
    • 2021
  • The purpose of this study was to identify the teaching methods used in inclusive music classes at elementary schools by of music in elementary school inclusive classes through the application of understanding by design and differentiated instruction, and to explore the feasibility of inclusive education. To this end, based on the 2.0 version of the backward design template, a unit for music lessons for 3rd and 4th grade inclusive classes was developed. The unit presented elements of differentiated instruction that considered students with intellectual disabilities at each stage. In the first stage, goals and essential questions were presented by analyzing the curriculum's achievement standards. In the second stage, a performance task was developed using the GRASPS technique, guidelines and examples were presented. Various evaluation methods based on students' readiness, interest, and learning type were suggested. In the third stage, the unit's seven lessons were planned using the WHERETO model. Examples of differentiated instruction for students with intellectual disabilities were presented by flexibly using classroom elements. This study indicated that understanding by design and differentiated instruction can be applied to inclusive education. Future studies on more diversified educational design and strategies are needed for promoting inclusive education.

A Qualitative Study on the Growth and Development of Peer Counselors in the Field of Disability based on Grounded Theory (근거이론에 의한 장애분야 동료상담사들의 성장과 발전에 관한 질적연구)

  • Park, Jong-Hwan;Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.22 no.1
    • /
    • pp.516-534
    • /
    • 2022
  • The purpose of this study is to explore the growth and development process of peer counselors in the field of disability. The field experiences of 19 peer counselors with disabilities and peer counselors who parents of children with disabilities were analyzed using the grounded theory method. As a result, first, central phenomenon were 'assuming the role of a peer counselor' and 'motor of role performance'. Intervening conditions were 'the perception that counseling is difficult', 'self-consciousness deriving from the lack of competency' and 'the status of insufficient peer counseling'. Action/interaction strategies were 'strengthening inner capacities' and 'promoting external activities'. Consequences were 'change and growth as a peer counselor', 'an expansion of activities other than peer counseling', and 'propose development tasks for peer counseling'. Second, their growth and development process was confirmed in four stages: 'the stage of introductory counseling education beyond disability', 'the stage of growth through change', 'the stage of career exploration through Competency Enhancement', and 'the stage of entry through role challenge'. Third, main theme was 'growth and development as a peer counselor is based on capacity building'.