BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

A study on reliability analysis model of the repair and replacement cycle of a building which utilizes Monte Carlo Simulation (몬테카를로 시뮬레이션을 활용한 건축물 수선교체주기 신뢰성 분석 모델에 관한 연구)

  • Kim, Jong-Rok;Jung, Young-Han;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.41-50
    • /
    • 2010
  • This study presented a model that can enable a reliability analysis for the repair and replacement cycle of a building by using background repair and replacement data and expert opinion as foundation data and applying Monte Carlo Simulation. The presented model offers the time of the repair and replacement of building elements for the period of a year, and supports the prediction of repair and replacement and expenses demand in advance while planning the maintenance of a building. In addition, the model will significantly reduce the risks to the building owner with regard to maintenance decisions. In addition, when a person in charge of the maintenance of large-scale building assets is having difficulties making decisions regarding the repair and replacement of existing building elements due to a lack of background data to support a long-term policy on the repair and replacement requirements, an engineering solution that can ensure the adequacy of this is provided. In summary, it can be largely divided into three study results. First, a method of estimating the repair and replacement cycle that can deal with the development of a construction system was developed. Second, a probabilistic methodology that can quantify the risk of the repair and replacement cycle was proposed. Third, the proposed model can be used as a means of supporting designer and constructor in making decisions for the life cycle plan of a building during a construction project.

A Probabilistic Analysis on the Repair and Replacement Cost of Educational Facilities (교육시설물의 수선교체비용에 대한 확률론적 분석 연구)

  • Yu, Yeong-jin;Son, Kiyoung;Kim, Ji-Myong;Kim, Taihui
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.1
    • /
    • pp.3-12
    • /
    • 2018
  • Educational facilities are more uncertain about maintenance costs due to their comprehensive and long life-cycle compared to commercial buildings. In addition, maintenance of the existing post management system can not maintain the original function of education facilities continuously and economically. In order to overcome this problem, it is necessary to analyze the repair and replacement cost for the uncertainty factor in maintenance. This study propose a model to determine repair and maintenance cost and cycle of educational facility based on probabilistic estimation concept. For the analysis, Monte Carlo simulation, a probabilistic analysis method, was applied based on the repair and maintenance history data of the educational facilities in Florida. The results of this study can be used as a guideline for quantitative facility management and facility management research.

An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals (기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석)

  • Chung, Sung Young;Kim, Sean Hay
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.3-9
    • /
    • 2018
  • Although Life Cycle Cost (LCC) must be evaluated by experts, sometimes it may not allow a sufficient time for even the experienced LCC expert to make rational decisions. Therefore, it often ends with relatively comparing the final numbers. We have broken down 110 technical proposals that are actually bade and accepted for large construction projects, and then have analyzed the uncertainty of Maintenance and Energy (M&E) cost during building life cycle, which turns out be the most volatile factor in uncertainty of LCC. Also we suggest "Value Engineering Index (VEI)" - the reduced M&E cost that is normalized by the reduced first cost. It is analyzed that the most uncertain factors of the M&E cost include repair and replacement term differing from each project, duplicated repair and replacement, non-standard repair items, and site-specific energy cost. Eventually we propose a VEI population with a mean of 1.38 and a standard deviation of 1.19, which is obtained by individually and exclusively applying the uncertain factors of the M&E cost to the 35 standard sample of technical proposals. The LCC evaluators may be able to use the VEI population as the benchmark to select the technical proposal with the most reasonable LCC among many others in two suggested manners; the one is to deterministically calculate the probability of single VEIs, and the other is to stochastically calculate the probability of the VEIs where uncertainty is quantified.

User Interface Design for Life Cycle Cost Estimation System (LCC 산정 시스템의 사용자인터페이스 설계)

  • Yang, Hoe-Ryeong;Shin, Han-Woo;Kim, Tae-Hui
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.149-150
    • /
    • 2012
  • According to the increase of demand of the deteriorated building. The interest of the building's maintenance is continually increased, so studies about how to increase building's stability & prolonged life span are increased. This study's purpose is to maintain building's function, so we suggest a protocol type system of UI to estimate reasonable planning of demand of repair & replacement and to distribute budget.

  • PDF

Suggestion of an Automatic BIM-based Repair & Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 자동화방안 제시)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.87-88
    • /
    • 2016
  • In order to assess the design value of engineering work from the point of view of LCC (Life Cycle Cost) in Korea, it is mandatory for all construction works that the total construction costs are over 10 billion won. The LCC includes initial construction costs, maintenance & operation costs, energy costs, end-of-life costs, and so on. Among these, the portion for maintenance & operation costs for a building is sizeable, as compared to the initial construction costs. Furthermore, the paradigm for construction industry has rapidly shifted from 2D to BIM, which includes design planning and data management. However, the study of BIM-based LCC analysis is not adequate today, even though all domestic construction projects ordered by the Public Procurement Service have to adopt BIM. Therefore, this study suggests a methodology of BIM-based LCC analysis that is particularly focused on repair and replacement (R&R) cost. For this purpose, we defined requirements of calculating R&R cost and extracted X from the relevant IFC data. Thereafter, we input them to the ontology of calculating the initial construction costs to obtain an objective output. Finally, in order to automatically calculate R&R cost, mapping with R&R criteria was performed. We expect that our methodology will contribute to more efficiently calculate R&R cost and, furthermore, that this methodology will be applicable to all range of total LCC. Thus, the proposed process of automatic BIM-based LCC analysis will contribute to making LCC analysis more fast and accurate than it is at present.

  • PDF

Improvement of Elevator Management System after Completion (준공 이후 승강기 관리체계 개선에 관한 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.455-461
    • /
    • 2016
  • To operate a large structure or a high-rise building, elevator is essential. Nevertheless, elevator breakdowns or accidents have been consistently reported. When the accidents are not serious, the records are not reported and cumulated in the Korea Elevator Safety Agency. Additionally, in case of replacement or repair of the parts of elevator, conflicts about the person responsible for the expense of the replacement or repair are frequently occurred. However the record of accidents is not decreasing and the conflict about the fund of elevator repair is serious. So, it is needed to reduce the elevator accidents or malfunction, the operation stop of the elevator, the conflict between building owners and users. Therefore, in this study, the elevator maintenance procedures during defect liability period, the notification procedure in case of breakdown or accident elevator, the direction of elevator maintenance contracts, the direction of the elevator inspection were suggested.

Economic Analysis of Geothermal Energy Facilities Applied to Public Buildings (공공 건축물 지열에너지설비 적용에 따른 경제성 분석)

  • Jang, Young Jun;Kim, Sangyong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.423-432
    • /
    • 2014
  • The aim of this study to propose an efficient method in selecting the type of new and renewable energy applied in at the planning phase of buildings. This study applied geothermal energy facilities with high adaptability to buildings. This study considered the energy reduction and reduced cost by comparing the values with the energy consumption before applying of geothermal energy facilities. In order to propose more reliable criteria of economic evaluation, maintenance costs reflecting the replacement cycles and initial construction costs by drawings and specifications for installation facilities for practical geothermal energy based on construction statement for life-cycle cost analysis. The results will help to effectively select economic types of facilities for new and renewable energy of the planning phase of buildings.

A Study on the LCC Analysis of an Office Building HVAC System (오피스빌딩 냉난방시스템의 수명주기비용 분석에 관한 연구 : 흡수식 냉온수 유닛의 설치 유형을 중심으로 한 사례연구)

  • Park, Moon-Sun;Shin, Hyeong-Sik;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.112-121
    • /
    • 2006
  • The purpose of this study is to execute economical analysis for two types of office building HVAC system using LCC technique : single vs, separated HVAC(equal partition installation, unequal partition installation) system. The research method of this study includes the case analysis and questionnaire surveys. The results of this study are as follows: (1) LCCs of 3 types of HVAC system are estimated and the most economical one is investigated as single HVAC system, (2) In this case study, the single HVAC system was investigated as 34% lower in LCC during 15 years per $100m^2$ compared to equal partition installation, as 41% compared to unequal partition installation.

The Maintenance Process Model using BPMN Method in Public Rental Housing (BPMN 방식을 이용한 공공임대주택 유지관리 업무 프로세스 모델)

  • Park, Kyung-Mo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.743-751
    • /
    • 2016
  • It is critical to effectively change the measures of prevention from the breakdown maintenance proceeding an apartment housing maintenance task scope. It is necessary that systematization be performed for a series of tasks, such as facility inspection, diagnosis and replacement. In addition, it is preceded by establishing a standardization for maintenance work scope. Therefore, this study examined the problems related to public rental housing maintenance work scope to manage it more systematically. In addition, the study suggests a work process section for facility repairs, long term replacement and general maintenance using one on one interviews with experts to classify the occupants, management office and head office. This study's standard work system is expected to provide fairness and transparency in addition to improving the productivity in public rental housing maintenance via an efficiency promotion plan. In addition, it is used as the basic reference for developing a system of public rental housing maintenance costs and diagnosis actions. Finally, it is necessary to create improvements that provide a more objective work system standardization throughout the analysis of the productivity data according to the work flow and the review of the occupants, management office and head office in the future applications of the pilot site.