• Title/Summary/Keyword: 속도 차

Search Result 4,892, Processing Time 0.036 seconds

A Case Study of Evaluation for Lane Layout of Toll Plaza including Multi-lane ETCS (다차로 ETCS 도입 시 영업소 동선 처리 사례 연구)

  • Han, Dong-Hee;Choi, Yoon-Hyuk;Lee, Ki-Young;Jeong, So-Young
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.3
    • /
    • pp.83-94
    • /
    • 2017
  • There is a two lane ECTS(Electronic Toll Collection System) that users can pass with 80kph high speed in SeoBusan Tall Gate. This system to be combined two hi-pass lanes for removing meddle-island have been operated successfully. But, the appearance of two Lane ETCS makes toll gate more complicated, so it is very important how to arrange effectively various tolling lanes. This study was trying to evaluate lane configuration for minimizing speed and speed deviation among all kinds of lanes including two Lane ETCS in seoul toll gate. That is, we selected all scenarios to be happened actually, and evaluated them using micro traffic simulation model (VISSIM). The results of this study showed that each alternative had a very different speed and speed deviation by lane each other, so we will be able to achieve effective operation and configuration of lanes in toll gate using scenario methodology.

Accident Reconstruction Analysis by Mathematical and Optimization Method from Skid Mark and Stopped Position (활주흔과 정지지점으로부터 수학적방법과 최적화방법에 의한 교통사고 재현기법에 관한 연구)

  • 유장석;장명순
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.4
    • /
    • pp.7-17
    • /
    • 2002
  • 본 연구는 차대차 충돌사고시 차량충돌위치와 충돌속도 분석기법을 사고사례를 통해 연구하였다. 차량충돌위치는 사고현장 노면에 생성된 타이어 마크를 이용하여 수학적방법으로, 충돌속도는 실제 사고차량 최종정지위치와 모의충돌실험을 통해 분석된 차량 최종정지위치와의 차를 목적함수로 하여 이를 최소로 수렴하는 최적화기법을 이용하였다. 연구결과, 승용차량 오른쪽 앞바퀴 위치는 중앙선으로부터 좌측으로 0.45m 떨어진 진행방향 1차로 상이고, 왼쪽 앞바퀴는 중앙으로부터 좌측으로 0.345m 떨어진 지점에 위치한 상태이다. 최적화기법을 이용하여 사고차량의 충돌속도를 분석한 결과. 최적화의 오차율이 0.8%인 경우 충돌속도는 승용차량 67.75Km/h, 짚형 승용차량 29.67Km/h로 분석되었으며, 충돌 후 x축에 대한 속도는 승용차량 20.0Km/h, 짚형승용차량 15.69Km/h이고, y축에 대한 속도는 승용차량 15.68Km/h, 짚형 승용차량 7.66Km/h로 분석되었다. 반면, 기존 충돌속도 분석모형식을 이용하여 사고차량의 충돌속도를 분석한 결과 승용차량 64.97Km/h, 짚형승용차량 31.27Km/h로 도출되었다. 따라서, 최적화기법을 통해 분석한 충돌속도와 기존 분석모형식을 이용하여 분석한 충돌속도와의 오차가 승용차량 2.78Km/h, 짚형승용차량 1.6Km/h로 최적화기법을 이용하여 분석한 결과에 대한 신뢰성이 높은 것으로 연구결과 도출되었다 따라서, 추후 차 대 차 충돌사고를 분석함에 있어 타이어 흔적을 이용한 수학적방법과 모의충돌실험을 통한 최적화기법을 이용하면 충돌속도는 물론 충돌전.후 차량의 운동특성에 대한 정확한 분석이 이루어질 수 있을 것으로 기대된다.

A Compensation of the Duration Bounds According to Speaking Speed (발음 속도에 따른 지속시간 제한 값의 보상)

  • Yang Tae-Young;Lee Chungyong;Youn Dae Hee;Cha Il-Whan
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • autumn
    • /
    • pp.193-196
    • /
    • 2000
  • 본 논문에서는 제한 지속시간 모델링(bounded duration modeling)의 지속시간 제한 값(duration bound)을 화자의 발음 속도에 따라 조절해주는 발음 속도 보상 알고리즘을 제안한다. 제안된 알고리즘은 두 번의 인식 과정을 수행하는데, 1차 인식 과정은 화자의 발음 속도를 추정하기 위한 과정이고, 2차 인식 과정이 인식 결과를 얻기 위한 과정이다. 1차 인식 과정에서 추정된 화자의 발음 속도에 따라, 지속시간 제한 값을 증가, 또는 감소시킨 후, 2차 인식과정에 사용한다. 제안된 알고리즘은 CHMM 기반의 한국어 연결 숫자음 인식 시스템에 적용되었으며, KAIST에서 제작된 4-7자리 연결 숫자음 데이터베이스인 DigitDB를 대상으로 성능을 평가하였다. 인식 실험 결과, 제안된 발음 속도 보상 알고리즘이 적용된 인식 시스템에서는 $96.26\% 단어 인식률을 얻어, 제안된 알고리즘이 적용되지 않은 인식 시스템의 $94.72\%보다 $1.54\% 향상된 인식 성능을 얻을 수 있었다.

  • PDF

Assessment on the Possibility of Increase of SB5-B Small Car Impact Velocity (SB5-B 소형차 충돌속도의 상향 가능성 평가)

  • Kim, Kee-Dong;Ko, Man-Gi;Joo, Jae-Woong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.6
    • /
    • pp.3013-3022
    • /
    • 2013
  • Satisfying the large car impact condition of the high level SB5-B for "SMART Highway" longitudinal barriers, the possibility of increase of the small car impact velocity from 120km/h to 130km/h was investigated. Through computer simulation using input parameters calibrated to full-scale crash test results, various longitudinal semi-rigid barrier models were improved such that for the small car impact speed of 120km/h the change of longitudinal and transverse velocities of the impact vehicle can satisfy the THIV limit. The barrier model determined through this process satisfied the performance assessment criteria for SB5-B impact conditions. Varying the wing angle of slip block-outs of the passed barrier model, the possibility of increase of the small car impact velocity was investigated by FEA and a full-scale crash test was conducted. It has been shown that the possibility to increase the small car impact speed to 130km/h is high if the test facility condition for 130km/h impact velocity is better equipped.

대만의 전기자동차 개발

  • 양배덕
    • 전기의세계
    • /
    • v.26 no.1
    • /
    • pp.49-53
    • /
    • 1977
  • 본고는 다음의 내용을 다루었다. 1. 개발현황 2. 청화대학 제1단계 전기차 개발 3. 차의 구성 4. 연축전지 5. 동력제어 6. 추력과 속도

  • PDF

A Pilot Study on Installation Criteria of Speed Change Lanes according to the Implementation of Safety Speed "5030" in the Urban Area (도심내 안전속도 "5030"시행에 따른 변속차로 설치기준에 관한 기초연구)

  • Oh, Seok-Jin;Ha, Tae-Jun;Jin, Tae-Hee;Shin, Kwang-Min;Lee, Gang-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.57-64
    • /
    • 2021
  • The speed change lane is installed at the point where the roads are connected on the urban roads, reducing the relative speed to facilitate traffic communication. However, in the case of the speed limit of 30 km/h in accordance with the implementation of the safe speed "5030" in the city, the standard is ambiguous, and there are criticisms about the installation of the transmission lane. This study conducted a pilot study on the traffic patterns of the speed change lanes, focusing on the section where the safe speed "5030" policy was scheduled to be implemented after theoretical consideration of the speed change lanes. After on-site investigation, as a result of analyzing the traffic pattern according to the travel speed of the main road according to road conditions and traffic conditions, the effectiveness of the speed change lane according to the safety speed "5030" was analyzed. In this study, the installation criteria for speed change lane by speed were presented. The criteria is that "speed change lanes should not be installed when the speed limit is 30 km/h, and speed change lanes should be installed when the speed limit is 50 km/h." The criteria will be considered as a reference when establishing engineering standards for connection of other facilities in urban areas in the future. It is expected that unnecessary restrictions on individuals' exercise of private property rights will be minimized, smooth traffic flow and secure safety by the installation of speed change lanes and expansion of turning radius.

Two New Speies of the Genus Psammocinia(Dictyoceratida, Irchiniidae) from korea (한국 모래해면속 (망각해면목, 가는실해면과)의 2신종)

  • Sim, Chung-Ja;Lee, Kyung-Jin
    • Animal Systematics, Evolution and Diversity
    • /
    • v.17 no.2
    • /
    • pp.245-250
    • /
    • 2001
  • Two new species of the genus Psammocinia (Dictyoceratida, Irciniidae), P. bergquisti n. sp. and P. gageoensis n. sp., are described from Gageodo Island (Sohuksando Island), Korea. P. bergquisti n. sp. is characterized by the thumb like appearance and secondary fibre which makes a broad plate or secondary web while other known species in Psammocinia has many narrow and simple secondary fibres. P. gageoensis n. sp. is very similar to P. mosulpia Sim 1998 in shape, but primary fibre of the new species has more complex fascicles and it is difficult to see the detritus in the fibre. The primary fibre of this new species is cored with the smaller sand than that of P. mosulpia.

  • PDF

An Experimental Study of Membrane Transport in a Water-Ethanol System (물-에탄올 계에서 막투과 현상에 대한 실험적 연구)

  • 박원철;최창균
    • Proceedings of the Membrane Society of Korea Conference
    • /
    • 1994.04a
    • /
    • pp.43-44
    • /
    • 1994
  • 일반적으로 다공성막을 사이에 두고 막을 통한 물질전달이 일어날 때 물질전달 속도는 압력차 $\Delta P$, 유속 V, 농도차 $\Delta C$ 등의 함수로 알려져 있다. 따라서 이들 여러 변수들 중에서 어느 한가지 변수만을 독립시키고 다른 변수들을 일정하게 고정시키면, 그 특정 변수가 물질전달 속도 J에 미치는 영향을 관찰할 수 있게 된다. 본 실험에서도 물과 에탄올 양쪽상의 유입 농도를 일정하게 유지시킴으로써 그 영향을 배재하고 유속과 압력차를 각각 독립시켜 그 영향을 살펴보았다.

  • PDF

The Speed Controller of DC Motor Using Model Reference Adaptive Control Method (기준 모델 적응 제어 방직을 이용한 직류 전동기의 속도 제어기)

  • 이성백;원영진;한완옥;임현철
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1992.11a
    • /
    • pp.41-46
    • /
    • 1992
  • 고전적인 제어 기법들을 이용한 전동기의 속도 제어기는 하나의 고정된 동작점에 대해서 대개 양호한 동작 특성을 얻을 수 있으나 전동기 매개변수의 섭동 및 부하 외란의 존재시 규정된 제어 동작을 유지하기가 어렵다는 단점을 갖고 있다. 따라서 본 연구에서는 이러한 단점을 극복하기 위하여 적응 제어 기법중의 하나인 기준 모델 적응 제어 (Model Reference Adaptive Control : MRAC) 방식을 직류 전동기의 속도 제어에 적용하였으며 또한, 2차 이상인 전동기의 속도 제어 시스템을 1차로 저차화시켜 제어 알고리즘의 계산에 소요되는 시간을 줄임으로써 실시간 제어가 가능토록 하였다. 제시된 기준 모델 제어 기법과 PI 제어 기법을 직류 전동기의 속도 제어에 각각 적용하고 부하의 관성변화에 다른 속도 응답 특성을 실험을 통하여 비교 검토하였다.

  • PDF

A Review on signaling system for new high speed train test at the existing high speed line (기존 고속선에서 고속열차 최고속도시험을 위한 신호분야검토)

  • Lee, Jae-Ho;Shin, Duc-Ko;Lee, Kang-Mi
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1031-1033
    • /
    • 2008
  • 차세대 한국형 고속열차는 분산형 시스템으로 최고속도 400km/h, 운행속도 350km/h을 목표로 개발중에 있다. 차세대 고속열차의 신호시스템은 기존선의 자동열차정지(ATS, Automatic Train Stop) 및 자동열차방호(ATP, Automatic Train Protection)와 고속선의 자동열차제어(ATC, Automatic Train Control) 신호방식을 모두 사용하는 ATP+ATS+ATC 형태의 차상장치가 개발 설치될 예정이다. 따라서 이러한 장치의 개발과 연계하여 차세대 한국형 고속열차는 기존 경부고속선에서 시험주행을 할 예정이다. 따라서 기존 경부고속선에서 차세대 고속열차의 최고 속도시험를 위한 신호분야의 방안을 검토하고자 한다. 본 논문에서는 3가지의 방안을 제시하여 적합성과 운영효율성을 고려하여 최적의 방안을 도출하는 방식으로 전개할 예정이다.

  • PDF