• 제목/요약/키워드: 소프트웨어 비용산정

검색결과 83건 처리시간 0.031초

기능 점수를 이용한 소프트웨어 규모 및 비용산정 방안에 관한 연구 (An improvement of software sizing and cost estimation model with function point methods)

  • 김현수
    • 경영과학
    • /
    • 제14권1호
    • /
    • pp.131-149
    • /
    • 1997
  • Software cost estimation is an important both for buyers and sellers(developers). We reviewed domestic and foreign researches and practices on software cost estimation with function point method comprehensively, In this paper, we derived four promising alternative function point models. They are an IFPUG(International Function Point User Group)-based model(Model I), a shorthand model for client/sever software systems(Model II), a data-oricnted model for relatively large software projects(Model III), and a general- purpose function point model for non business application softwares as well as business applications(Model IV). Empirical data shows that Model I, II, and IV are very useful function point models. In particular, model II and IV look very useful models since they are concise and accurate. These models can be incorporated in a new improved guideline for software cost estimation. General opinion survey shows that Model I, II and IV are preferable. There are no significant differences in preference between buyers and sellers. The survey also shows that users think function point method is better than step(line of code)-oriented cost estimation methods in many ways including objectivity and estimation accuracy.

  • PDF

소프트웨어 비용산정을 위한 기능점수 모형 개선 연구 (An Improvement of Function Point Models for Software Cost Estimation)

  • 김현수
    • 한국정보처리학회논문지
    • /
    • 제6권9호
    • /
    • pp.2403-2413
    • /
    • 1999
  • 본 연구는 기능점수 모형의 예측능력과 활용성을 높이는 동시에 소프트웨어 사업대가 기준의 실용성을 제고하는 목적으로 수행되었다. 기능점수 개선모형 연구는 최근에도 몇가지 연구가 수행된 바 있다. 따라서 본 연구에서는 이들 연구 결과를 활용하여 모델을 개선하는 작업을 수행하였다. 우선, 기존의 국내 연구를 보완하고, 전문가의 자문을 통하여 실용성이 높은 후보 모형을 도출하였다. 현재와 같은 프로젝트 환경에서는 실제 데이터에 의한 통계적으로 완벽한 검증을 기대하기 어려우므로, 현업 프로젝트 전문가의 경험에 의한 검증이 매우 중요한 역할을 한다. 따라서 본 연구는 이러한 과정을 충실하게 거쳐 후보 모형을 도출하였다. 특히 기술적 복잡도 판단 기준표는 기능점수 모형에서 제시되지 않은 독자적인 기준으로서 한국형 기능점수 모형의 대표적인 특징이라 할 수 있다. 또한 본 연구는 39개의 프로젝트 실제 데이터를 이용하여 후보 모형의 타당성을 검증하였다. 제안된 후보 모형이 전문가에 의한 경험적인 타당성과 함께 일정 수준 이상의 통계적 유의성을 가지고 있음을 입증하였다. 본 연구의 결과는 산업계와 정부 등의 관련기관 실무 회의를 거쳐 소프트웨어 사업의 대가기준으로 활용될 수 있을 것이다.

  • PDF

회귀분석을 이용한 UCP 기반 소프트웨어 개발 노력 추정 모델 (Software Cost Estimation Model Based on Use Case Points by using Regression Model)

  • 박주석;양해술
    • 한국콘텐츠학회논문지
    • /
    • 제9권8호
    • /
    • pp.147-157
    • /
    • 2009
  • 최근 객체지향 개발 방법론을 적용하는 소프트웨어 개발 프로젝트에서 개발 노력 추정 기법으로 사용사례점수(Use Case Point, UCP)에 대한 연구가 계속되고 있다. 기존의 연구는 기술적 요인과 환경적 요인을 적용한 AUCP(Adjusted Use Case Point)에 상수를 곱하여 개발 노력을 추정하는 선형모델을 제안하고 있다. 그러나 소프트웨어 규모가 증가하면 개발기간은 기하급수적으로 증가함으로서 비선형 회귀모델이 적합하다는 사실과 UCP 계산과정에서 TCF(Technical Complexity Factor)와 EF(Environmental Factor)를 적용함에 따른 FP(Function Point) 오차가 발생함으로서 AUCP로 규모를 추정하는 것은 비현실적이다. 이 논문은 사용사례점수 기반의 기존 연구의 문제점을 제시하고, 기존 연구의 문제점인 TCF와 EF를 고려하지 않고 직접 UUCP로 부터 개발 노력을 추정할 수 있는 모델(선형, 로그형, 다항식, 거듭제곱, 지수형)을 도출하고 평가한다. 그 결과, 기존의 선행 모델보다 비선형모델인 지수형 모델이 우수한 결과를 보였다. 따라서 개발될 소프트웨어 시스템의 UUCP를 계산한 후 제안된 모델을 이용하여 개발 노력을 추정함으로서 개발에 소요되는 직접비용 산정이 가능하다.

제조업의 재해손실비용산정을 위한 소프트웨어 개발에 관한 연구 (A Study on Development of the Software for Measurement of Safety Cost in Manufacture Industry)

  • 권희봉;조수원;이창호
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2001년도 춘계학술대회
    • /
    • pp.39-43
    • /
    • 2001
  • The existent system of management for Measurement of Safety Cost are not effective because of the data loss and time loss and occurrence of errors through manual calculation. Therefore, tile development of the software for measurement of safety cost can solve the problem through the systematic calculation for safety cost and converting the related data to database, and also can build the strategy of the investment of Safety cost through analysing and comparing with the past data in the database. As a part of development of the software of Measurement of Safety Cost which is appropriate for the domestic environment, this study is developing a software based on Noguji method, which is one of the methods of Measurement of Safety Cost, and to appraise the efficiency of the management of Measurement of Safety Cost we will implement and improve the software in the case of the domestic enterprises.

  • PDF

획득 프로세스를 고려한 소프트웨어 비용 산정방안 (Software Cost Estimation Considering Acquisition Process)

  • 송영일;이길섭
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제14권2호
    • /
    • pp.173-189
    • /
    • 2005
  • Recently, Korean software industry has enjoyed fast growth, thus phenomenon drew attention to the need for more precise and standardized cost estimation system for software development. However, many obstacles exist in achieving a more precise and universally applicable cost measurement. These obstacles include : (1) the intangible nature of intellectual efforts, (2) lack of cost standards, (3) lack of quantitative yardstick to determine the potential complication, (4) lack of both cost monitoring during development and coordinating between acquisition process and cost estimation. The purpose of this study is to facilitate software development cost estimation considering acquisition process that will meet korean user's needs, and to create better models that will be cost for software development particularly for Korean environment.

  • PDF

제조업의 재해 손실 비용 산정을 위한 소프트웨어 개발에 관한 연구 (A Study on Development of the Software for Measurement of Safety Cost in Manufacture Industry)

  • 권희봉;조수원;이창호
    • 대한안전경영과학회지
    • /
    • 제3권1호
    • /
    • pp.1-10
    • /
    • 2001
  • The existent system of management for Measurement of Safety Cost are not effective because of the data loss and time loss and occurrence of errors through manual calculation. Therefore, the development of the software for measurement of safety cost can solve the problem through the systematic calculation for safety cost and converting the related data to database, and also can build the strategy of the investment of Safety cost through analysing and comparing with the past data in the database. As a part of development of the software of Measurement of Safety Cost which is appropriate for the domestic environment, this study is developing a software based on Noguji method, which is one of the methods of Measurement of Safety Cost, and to appraise the efficiency of the management of Measurement of Safety Cost we will implement and improve the software in the case of the domestic enterprises.

  • PDF

원자력 해체시설 특성관리 시스템을 위한 CBD 프로세스의 적용 방안 (CBD process applying for DEFACS)

  • 조운형;박승국;최윤동;문제권
    • 소프트웨어공학소사이어티 논문지
    • /
    • 제25권1호
    • /
    • pp.11-18
    • /
    • 2012
  • 원자력 시설 해체 사업은 해체 시 방사성 물질이 발생하기 때문에 시설 해체에 있어서 일반적인 해체 공법을 사용하기 어렵다. 그렇기 때문에 원자력 시설의 해체 계획을 수립하는데 해체 대상시설의 성격을 조사하고 파악하는 것이 매우 중요하며 해체 대상 원자력 시설의 특성 자료 조사는 해체 폐기물의 양을 예측하고 해체 사업의 비용 산정에 크게 활용이 된다. 한국원자력연구원에서는 이를 목적으로 해체사업 대상 시설의 특성자료를 관리하는 시스템 DEFACS(Decommissioning Facility Characterization DB System)을 개발하였다. 그러나 원자력 시설 해체에는 시간이 오래 걸리기 때문에 부득이하게 해체 사업 중에 시스템을 개발하였고 이는 지속적인 요구사항의 변경이 발생하는 원인이 되었다. 이러한 이유로 개발에 있어서 일반적인 개발 프로세스를 적용키 어려웠던 바, 본 논문에서는 개발 중 요구사항 변경에 대한 효율적인 대응을 하기 위하여 기존의 CBD(Compoenent Based Development) 프로세스를 CD(Component Development)와 CBSD(Component Based Software Development)로 구분하여 변경사항에 대한 핸들링을 하나의 컴포넌트로 다루고 컴포넌트 별로 CBD를 재적용하여 재귀적으로 프로세스를 핸들링한다. 이로써 컴포넌트 변경에 대한 전체 시스템의 변경점을 최소화하고 컴포넌트와 프로세스의 독립성을 강화함으로써 요구사항 변경으로 인한 프로세스의 중지를 최소화 하였다.

  • PDF

고정식 표면영상유속계 (FSIV)를 이용한 실시간 하천 유량 산정 (Real-time Discharge Measurement of the River Using Fixed-type Surface Image Velocimetry)

  • 김서준;류권규;윤병만
    • 한국수자원학회논문집
    • /
    • 제44권5호
    • /
    • pp.377-388
    • /
    • 2011
  • 표면영상유속계(SIV)는 영상 분석 기법을 이용하여 하천의 표면유속을 측정하고, 이를 토대로 유량을 산정하는 시스템이다. 본 연구에서는 고정식 표면영상유속계(FSIV) 시스템을 달천 수전교에 설치하여 실시간으로 연속적인 유량 측정을 실시하였다. 수전교에 적용된 FSIV의 하드웨어 시스템은 영상 획득을 위한 2대의 디지털 카메라와 컴퓨터, 그리고 수위 측정을 위한 초음파 수위계로 구성된다. 이 현장 장비들에서 획득된 실시간 영상과 수위 자료는 무선인터넷을 이용하여 실시간으로 홈페이지에 전송되며, 표면영상유속분석 소프트웨어를 이용하여 유량을 산정한다. FSIV에 의한 유량산정 결과는 직상류의 괴산댐 방류량과 FSIV와 동일한 지점에 설치된 Acoustic Doppler Velocity Meter (ADVM)를 설치한 후 유속지수법으로 산정된 유량과 비교하여 검토하였다. 댐 방류량과 비교한 결과 30$m^3/s$ 이상의 유량에서는 대부분 5~10%의 오차를 보였으며, ADVM을 이용하여 측정된 유량과 비교한 결과는 약 200$m^3/s$ 이상의 유량에서는 오차가 약 5 % 이내로 확인되었다. FSIV의 설치 경비와 운용에 드는 비용과 인력을 감안한다면, FSIV는 실시간으로 유량을 관측할 수 있는 좋은 대안이 될 것으로 판단된다.

계층분석기법을 활용한 전장관리정보체계 소프트웨어 시큐어 코딩룰 선정 평가 방안 (Evaluation Method Using Analytic Hierarchy Process for C4I SW Secure Coding Rule Selection)

  • 최준성;김우제;박원형;국광호
    • 한국통신학회논문지
    • /
    • 제38C권8호
    • /
    • pp.651-662
    • /
    • 2013
  • 본 연구에서는 적용대상체계에 적합한 시큐어 코딩룰을 선정 평가하기 위한 방안으로, 적용대상 체계의 특성에 따른 체계적용적합성(개발언어적합성, 플랫폼적합성), 위협평가(침해의 심각성, 침해의 가능성), 적용기대효과(신뢰성/품질향상, 수정 비용) 등을 종합적으로 고려한 시큐어 코딩룰의 선정 평가 방안을 제시하였다. 이를 활용하여, 전장관리정보체계의 체계 특성에 부합하는 197개의 시큐어 코딩룰을 선정하였다. 또한 선정된 각 코딩룰 별로 대상 체계에 대한 적용을 위한 우선 순위를 산정하였다.

위험을 고려한 응용소프트웨어의 유지관리비용 산정모델에 관한 연구 (A Study on the Maintenance Cost Estimation Model for Application Software by Considering Risks)

  • 정형종;구은영;한경석
    • 한국IT서비스학회지
    • /
    • 제14권3호
    • /
    • pp.67-84
    • /
    • 2015
  • Software is more diverse and complex and the level of importance for the maintenance of application software to securely operate software is also gradually increasing in proportion. The calculation method for maintenance cost of application software applied in Korea public enterprises is involved in the range of 10 to 15% of development cost, depending on the Software Project Cost Estimation Guide. Moreover, as most software maintenance cost estimation procedures do not take into consideration of the risk factors related of maintenance, it can be seen as a main cause for the occurrence of maintenance related accidents. This study proposes a maintenance cost estimate model that takes into consideration of the risks related to the software maintenance activities to improve and resolve issues arising from the estimation of maintenance cost. In doing so, maintenance risk factors are analyzed and a risk index is derived through the analysis of risk levels based on the risk factors. Based on such analysis, a maintenance cost estimate method which reflects the maintenance risk index was established.