• Title/Summary/Keyword: 소내전력

Search Result 27, Processing Time 0.021 seconds

A Study on the effect on reactive power transmitted to the power station by Voltage (154kV) of Power System (계통전압(154kV)이 소내수전 무효전력에 미치는 영향 연구)

  • Jeon, Kyu-Nam;Chang, Moon-Soung;NamGoong, Hyuk;Jeong, Hae-Jung;Ahn, Joo-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2007.11b
    • /
    • pp.314-315
    • /
    • 2007
  • As a section of electric power system linked with Kepco was changed, the decrease in qulity of the electric power transmitted to the Hapcheon hydraulic power station occurred. The actual state bring about the overheating and capability decline of electricity accommodation equipment. From now, let's improve the efficiency on the maintenance of generating equipment by studying about the cause and the method for this problem.

  • PDF

The long-term operating evaluation of the grid connected PV power system (계통연계형 태양광 발전시스템의 장기 운전평가)

  • Kim, E.H.;Ahn, K.S.;Lim, H.C.;Kim, Y.R.;Kim, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1089-1090
    • /
    • 2008
  • 본 고에서는 전력사업용 특고압 연계 태양광 발전시스템의 실계통 연계운전 특성에 대하여 기술하고자 한다. 본 설비는 150 kVA급 PCS 및 모듈 용량 122.5 kWp의 용량으로 2005년 8월 25일부터 태안발전본부 구내에서 상업운전 중에 있으며, 발전설비 이용율은 12.71 %, 소내 소비율 평균 6.66%로 분석되었으며 특별한 문제점 없이 정상적으로 운전되고 있다.

  • PDF

The practical operating evaluation of the grid connected PV power system (계통연계형 태양광발전시스템의 실증운전 평가)

  • Kim, Eui-Hwan;Ahn, Kyo-Sang;Lim, Hee-Chun
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.5
    • /
    • pp.72-77
    • /
    • 2008
  • The purpose of this paper is to explain the real characteristics of generation system of large scale power system of high voltage the grid connected PV power system for electricity industry. Main system is made up PCS in the class 150kVA. and we studied commercial operation in Korea-Western Power Company,(Tae-An headquarter) with the capacity of module is 122.5 $kW_p$. On the average, power plant utilities' utilization is 12.71 percent and consumption rate is 6.66 percent. We operated normally since 25th, August 2005 without any other problems.

Field Application of H-Bridge Multi-level Inverter for Fluidized Bed Combustion Boiler Secondary Air Fan (200MW 석탄화력 순환 유동층 보일러 이차공기송풍기용 H-브릿지 멀티레벨 인버터 현장적용)

  • Kim, Bong-Suck;Ryu, Ho-Seon
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.12 no.5
    • /
    • pp.424-431
    • /
    • 2007
  • This thesis proposed H-Bridge Multi-Level Inverter for Fluidized Bed Combustion Boiler Secondary Air Fan in 200MW thermal power plant. The adjustable speed drive systems improve the efficiency in lightly load condition and extend the life span of motor by limiting the over current at starting. H-Bridge Multi-level Inverter is composed of the several series low voltage power cell inverters, which have the independent isolated do link, in each phase. KEPRI(Korea Electric Power Research Institute) has successfully completed to develop, install, and commission H-Bridge Multi-level Inverter(6.6kV, 1MVA). This thesis gives a full detail about H-Bridge Multi-level Inverter, proposed boiler DCS(Distributed Control System) logic, and commissioning test result.

Development of Verification Program for Safety Analyses of APR1400 on-site & off-site Power System Design (신형경수로1400 원전 소내.외 전력계통의 설계안전성 평가를 위한 검증 프로그램 개발)

  • Zhu, O.P.;Oh, S.H.;Oh, S.K.;Kim, K.J.;Choi, J.H.;Lee, B.I.;Park, C.W.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.87-89
    • /
    • 2001
  • On-site power system design of APR1400 is different from that of existing and operating plants and APR1400 has no operating experience. So we have to confirm its adequacy of design exclusively by analyses. So an method of analysis is the only way to evaluate safety of design of the power system of APR1400. Therefore the purpose of this paper is a construction of verification program and a verification of utilities' analysis results by using this program in order to confirm the adequacy of APR1400 on-site & off-site power-system.

  • PDF

A Study on the Effect to Reduce the Greenhouse Gas with a Pump Scheduling System in Water Supply Plant : Energy Efficiency Improvement CDM Project in Paldang Pumping Station(III) (펌프 스케쥴링 시스템을 적용한 수도사업장의 온실가스 저감효과 분석 : 팔당3 취수장 에너지효율향상 CDM 사업을 중심으로)

  • Kim, Min Su;Lee, Hyung Muk;Park, Min Su;Gwon, Gi Beom
    • Journal of Climate Change Research
    • /
    • v.4 no.1
    • /
    • pp.63-75
    • /
    • 2013
  • The purpose of this study is to analyze the green-house gas emission reduction of the pump scheduling system applied to the water-supply facilities in all objectivity with AMS-II.C/Version 13 in CDM methodology. To calculate the baseline and project emission in Paldang Pumping Station (III) the data about water flow, water level, electricity consumption, etc. before and after the implementation of project was used. This study considers internal facility (mostly for lighting) electricity consumption and grid loss in order to get more accurate emission reductions. The methodology used in this study will be able to apply to different energy improvement techniques to calculate emission reductions in water supply facilities.

Economic Assessment on an Integrated system of Phosphoric Acid Fuel Cell and Organic Rankine Cycle (인산형 연료전지와 유기랭킨사이클 연계시스템에 대한 경제성 평가)

  • Kim, Deug Soo;Yoo, Hoseon
    • Plant Journal
    • /
    • v.18 no.1
    • /
    • pp.43-49
    • /
    • 2022
  • In this study, the operational characteristics of the 7.48 MW fuel cell power plant consisting of 17 units of 440 kW Phosphoric Acid Fuel Cell (PAFC) in operation since its commercial operation in December 2017 were explained and the heat recovery process of the plat using Organic Rankine Cycle (ORC)was simulated. The fuel cell system performance improvement and economic assessment were analyzed by calculating the amount of heat recovery and electric power available when connecting a 125 kW XLT Model ORC for hot water heat sources with 105℃, 40.8 t/h. The result of the study shows that integrating the 125 kW ORC to PAFC power plant would improve generating efficiency by about 0.6% through annually 851,472 kWh of electricity produced by ORC, and fuel cell and ORC integrated systems were calculated to have a 0.35% higher Internal Return Ratio and more Net Present Value of 1,249 million KRW than not installing ORC despite installation costs.

  • PDF