• Title/Summary/Keyword: 소규모 공사장

Search Result 8, Processing Time 0.021 seconds

A Study on the Reduction Plan of Dust Dispersion at Small-Scale Construction Sites in Downtown Seoul (서울 도심지 내 소규모 공사현장 비산먼지 감소방안에 관한 연구)

  • Cho, Jeong Gyu;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.6
    • /
    • pp.745-750
    • /
    • 2021
  • As public concern for fine dust has increased, so too has the interest in fugitive dust. Fugitive dust generated at construction sites, which is then scattered by vehicles moving around the sites, accounts for a significant portion. Small construction sites, which comprise the majority of construction sites, are often not adequately managed, because there are no regulations on fugitive dust for such sites. Therefore, in this study, in order to contribute to the establishment of fugitive dust management regulations on small-scale construction sites and to prepare measures to reduce fugitive dust, we measured and analyzed fugitive dust generated at small-scale building sites in Seoul. The fluctuations of fugitive dust generated at small-scale sites over time were checked, and the relatively low concentration when measured behind fences and railings suggested that fence installation is an appropriate method of reducing fugitive dust.

Introduction of Small-Scale Pumped-Storage Generation Technology to solve the Problem of Renewable Energy Volatility (재생에너지 변동성 문제 해결을 위한 소규모 양수발전 활용 기술 소개)

  • Tae Gyu Hwang;Jong Seok Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.78-78
    • /
    • 2023
  • 기후변화 위기는 유사 이래 인류가 직면한 가장 큰 도전으로 범정부적 글로벌 문제로서 이를 해결하기 위한 다양한 정책들이 범국가 차원 혹은 세계적 기업들에 의해 발표 혹은 시행되고 있다. 이러한 기후변화위기와 탄소배출 저감을 위한 대표적인 대응 방안 중 하나가 바로 재생에너지의 확대·보급 노력이다. 그러나 재생에너지는 날씨와 계절 등 자연환경의 영향을 받는 에너지원으로써 간헐성, 변동성을 가지므로, 시간대별 발전량 예측과 전력공급 안정성에 어려움이 있다. 이러한 문제를 해결하기 위하여 재생에너지 발전은 석탄화력 발전과 달리 전력의 수요와 공급의 균형을 위한 에너지저장장치(Energy Storage System, 이하 ESS)가 있어야 한다. ESS는 전력공급 안정성 향상과 전력 수급의 유연성을 제공하는 장점이 있지만, 초기 설치비용이 높은 단점이 있다. 특히, 배터리 기반 ESS의 경우 높은 구축 비용과 한정적인 충. 방전수명으로 인하여 대용량 ESS로써의 역할 수행에는 분명한 한계가 있다. 하지만 재생에너지와 연계한 ESS로 양수발전댐을 활용할 경우 장주기, 장수명, 대용량 에너지 저장에 매우 합리적인 수단으로 판단되었다. 다만, 양수발전 댐 구축에는 토목공사로 인한 환경 훼손이라는 문제점도 존재한다. 본 고에서는 지역 분산형 소규모 양수발전(Pumped Storage Hydropower, 이하 PSH)댐 구축 및 운영기술 개발을 통해 지역 전력공급과 전력 수급을 조절하면서 변동성 재생에너지를 안정적으로 사용할 수 있는 방안을 소개하고자 한다. 특히, 해당 기술은 지역별 특성에 맞춰 유연하게 설치할 수 있으며, 대규모 토목공사로 의한 환경적 부작용을 최소화할 수 있다. 또한 소규모 PSH는 지역의 저수지 및 수자원을 이용하여 에너지를 저장함으로써 변동성 큰 재생에너지의 유연화 대응과 동시에 안정적인 에너지 공급이 가능하다. 본 고에서는 재생에너지의 확대·보급에 따른 문제점과 대표적 ESS 기술들을 분석·소개한다. 지역분산형 소규모 PSH 기술개발 연구기획 내용 소개를 통하여 전력 생산 및 공급의 탈중앙화를 달성하고, 지역별 변동성 재생에너지의 안정적 활용과 지역 전력공급 특성 및 전력 수급에 대응할 수 있는 방안을 제안하고자 한다.

  • PDF

A Study on the Dynamic Effect Influencing to Urban Railway Structures by Vibration from Near-field Excavating Work (근접장 굴착진동이 도시철도 구조물에 미치는 동적영향 연구)

  • Woo-Jin, Han;Seung-Ju, Jang;Sang-Soo, Bae;Seung-Yup, Jang;Myung-Seok, Bang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.4
    • /
    • pp.41-53
    • /
    • 2022
  • In the excavation work like blasting/excavator work bordering on the urban railway, the dynamic safety of railway structures like tunnel, open-cut box structure and elevated bridge was investigated by numerical analysis in this study. The practically presented criteria on influential zones at the blasting work in the construction industry was numerically checked in cases of the precise vibration-controlled blasting (type II) and the small scale vibration-controlled blasting (type III) and it was shown that the criteria on blasting work methods needed to be supplemented through continuous field tests and numerical analyses. The influence of excavation vibration by mechanical excavators was especially investigated in case of earth auger and breaker. The numerical analysis of tunnel shows that the criteria on vibration velocities from the regression analysis of field test values was conservative. The amplification phenomenon of excavating vibration velocity was shown passing through the backfilling soil between the earth auger and the open-cut box structure. It was shown that the added-vibration on the superstructure of elevated bridge was occurred at the bottom of pile like earthquake when the excavator vibration was arriving at the pile toe. The systematic and continuous research on the vibration effect from excavating works was needed for the safety of urban railway structures and nearby facilities.

Development of Model for Selecting Superstructure Type of Small Size Bridge Using Dual Classification Method (이원분류기법을 이용한 소규모 교량 상부형식선정 모형에 관한 연구)

  • Yun, Su Young;Kim, Chang Hak;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1413-1420
    • /
    • 2015
  • On the design phase of small size bridge, owing to the lack of related guidelines or standards to determine a superstructure type of bridge, many designers tend to select the type depending on expert's experience and knowledge. Moreover, recently, as types of bridge superstructure become diverse and more conditions need to be considered in the project, the decision makes process become complex. This research covered the selection of a superstructure type of a middle or small size bridge with span length of about 50m, which frequently built for national roadway, selecting type of bridge superstructure more systematic way rather than the existing ways to compare construction methods or to depend on expert's experiences. This study proposes to build a bridge superstructure type selection model using one of the techniques of artificial intelligence techniques SVM by applicability of the model examined through the verification of the actual case.

ZAn Experimental Study on Performance Evaluation of Simplified Composite Steel I-Beam Bridge (초간편 강합성 H형강 교량의 실험 성능평가 고찰)

  • Kim, Jae-Heung;Park, Jong-Sup;Lee, Son-Ho;Choi, Seung-Ho;Lee, Young-Ho
    • Proceedings of the KAIS Fall Conference
    • /
    • 2009.12a
    • /
    • pp.29-32
    • /
    • 2009
  • 본 연구는 도로교 설계 기준 바탕으로 H-형강을 사용하여 20~30m 사이의 지간장을 가진 중 소규모 교량에 적용이 가능한 초간편 교량의 모형실험 결과와 유한요소해석프로그램(ABAQUS)을 사용한 해석 결과와 비교 분석하여 초간편 교량의 성능을 평가한 것이다. 일반적으로 우리나라의 교량들은 시공과정에서 여러 단계를 거쳐 시공한다. 시공단계가 복잡할수록 공사기간은 늘어나기 때문에 기상 현상에 의한 파괴와 교량의 낙후로 인해 유지, 보수, 교체 또는 교량확장을 해야 하는 경우 교통 혼잡과 경제적 손실을 줄 수 있다. 따라서 본 연구는 이와 같은 경제적 손실을 줄일 수 있는 초간편 H형강 교량의 연구의 일환으로 기존의 연구 결과를 모형실험 수행 결과와 비교하여 최적성능을 평가하기 위해 실시하였다. 사용된 실험체는 실험장소인 건설기술연구소의 구조실험동 장소 여건에 따라 10m 안팎의 경간을 갖는 교량으로 제작하였다. 실험체의 설계 제작 과정에 대해 검토한 후 범용구조해석 프로그램을 이용하여 동일한 조건을 적용한 결과를 비교 후 최종적으로 초간편 교량의 성능에 대한 평가를 실시하여 김재흥 등(2009)의 의해 제안된 하중분배계수 값이 적용가능한지 판단하였고, 실험을 통해 응력 분포와 극한하중에 대해 검토하였다.

  • PDF

소단면 터널에서 에멀젼폭약의 사압현상과 대책

  • Min, Hyeong-Dong;Jeong, Min-Su;Jin, Yeon-Ho;Park, Yun-Seok
    • Proceedings of the KSEE Conference
    • /
    • 2008.10a
    • /
    • pp.17-28
    • /
    • 2008
  • 국책사업이나 SOC의 확충을 위한 도로 및 철도의 건설에서 적용되는 터널의 단면크기를 보면, $50m^2$에서부터 $100m^2$이상의 중 대단면 터널이 주를 이루고 있으나, 전력구, 통신구, 소규모로 운영되는 광산의 채광용 터널, 용수를 위한 도수로터널 등 특수한 용도로 설계, 시공되고 있는 터널에서는 $20m^2$이하의 단면크기를 갖는 경우가 있다. 이러한 소단면 터널의 경우에는 협소한 작업공간으로 인하여 적용공법 뿐만 아니라 장비의 사용 또한 제약을 받게 되어 작업효율이 저하되고 공사기간이 늘어나게 되는 등 여러 가지 문제점을 안고 있다. 특히, 에멀젼 폭약을 사용하는 발파에서 먼저 기폭된 발파공의 충격압력에 의해 인접공의 폭약이 예비압축(Precompression)되어 사압현상을 일으키고 잔류약을 발생시키는 사례가 종종 발생하고 있다. 사압현상은 당해 발파의 실패와 함께 2차적인 사고의 위험요인이 될 수 있으므로 이를 방지하기 위한 대책을 수립하여야 한다. 이를 위해 기존 문헌을 통하여 사압현상의 원인과 발생 가능성을 검토하였고, 국내에서 주로 사용되는 에멀전폭약의 수중 내충격성시험과 충격압력 전달시험을 실시하여 사압현상의 발생정도를 측정하였으며, 사압현상이 발생한 소단면 터널현장을 대상으로 대책을 수립하여 적용하였다. 심발방법을 변경하여 전단의 충격압력을 견딜 수 있는 공간격을 확보하고 뇌관의 초시간격을 적절하게 배치한 발파패턴을 적용한결과, 사압현상을 억제하고 잔류약의 발생을 감소시켜 계획 굴진장을 확보하고 파쇄석의 크기를 감소시키는 등 양호한 결과를 얻을 수 있었다.

  • PDF

A Study on the Application of Roof Panel Shield Method (RPS 공법의 적용성 연구)

  • Kim, Jung-Hyi;Jung, Byung-Chul;Shin, Eun-Chul;Kim, Jong-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1585-1592
    • /
    • 2008
  • 산업사회의 발전에 따라 사회 기반시설분야도 복잡다양해지고 특히 도시기능이 활발해지면서 지금의 도심지에는 지하철, 상수도, 하수도, 전력구, 통신구, 지하보차도, 지하상가, 지하주차장 등 여러 가지 용도의 지하공간이 요구되고 있으며, 이러한 지하 구조물을 축조하는데 있어 도로상에 차량 증가로 인한 교통 혼잡이나, 지하매설물의 장애로 인하여 기존의 개착식 공법으로 시행하지 못하고 지하터널공사로 시행하는 경우가 빈번하다. 기존 국내 외 터널공법 관련문헌과 현재 사용되는 터널공법의 실제 시공에 관한 정보를 수집하여 장 단점, 시공시 주의사항, 적용조건등의 조사내용을 바탕으로 RPS 공법을 고안하였다. 소규모 지하구조물을 구축하기 위한 RPS 공법은 출발갱내에서 상부에 파이프 루프를 시공한 후 광폭 유압 패널이 장착된 철제 선도관을 추진시켜 선도관을 원압잭에 의하여 압입한 후 P.C. 콘크리트 구조물을 거치하고 원압으로 압입 추진토록 하였다. 또한, 대규모 지하구조물 축조시에는 구조물 예정상단부에 지반조건에 따라 파이프 루프공법 또는 소구경 Semi-Shield 공법을 이용하여 루프를 시공함으로써 상부의 침하를 방지하고, 측벽은 광폭유압 패널을 이용하여 여굴의 최소화 및 곡선부 시공을 용이하게 하였다.

  • PDF

The Analysis of Underground Utility Tunnel Positions using Lineament and GPR (선구조와 지하 투과 레이더를 이용한 지하공동구 위치 해석)

  • Jang, Ho-Sik;Seo, Dong-Ju
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.4
    • /
    • pp.142-150
    • /
    • 2006
  • In this study, GPR and lineament methods are used for the effective construction. GPR method is non-destructive testing to understand underground utility tunnel while lineament method is to understand locational environment. First, soil condition of the subject area is surveyed by location analysis. As the result of GPR survey, small-scale and large-scale of underground utility tunnel's location and scale were estimated. From the result of estimation, it is found that the main cause of underground utility tunnel's generation was not the effect of landslide or disturbed foundation from the excavation work but crack of shear & tension from the effect of fault movement which grew by insulation surroundings. From now on, this investigation method would be very useful in the survey and design stage on site for the effective construction and maintenance.

  • PDF