• Title/Summary/Keyword: 성과기반군수지원

Search Result 8, Processing Time 0.022 seconds

A Study on the Improvement of Logistic Support by Performance Based Logistics (성과기반군수(PBL)를 활용한 군수지원 발전방안 연구)

  • Choi, Seok-Cheol
    • Journal of the military operations research society of Korea
    • /
    • v.34 no.2
    • /
    • pp.43-61
    • /
    • 2008
  • Performance based logistics(PBL) is recently studied and applied for enhancing the combat readiness and reducing the life-cycle cost for weapon system in the United States. Therefore, in this paper, we review the issues of logistic support and suggest alternatives to effectively manage the logistic support for weapon system by using performance based logistics, especially during operation and support phase of weapon systems.

A Study on the Application of PIDO Technique for the Maintenance Policy Optimization Considering the Performance-Based Logistics Support System (성과기반 군수지원체계의 정비정책 최적화를 위한 PIDO 기법 적용에 관한 연구)

  • Ju, Hyun-Jun;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.632-637
    • /
    • 2014
  • In this paper the concept of the performance-based logistics (PBL) support for weapon systems is discussed and an enhancement is studied such that prior to the Operational phase, the development of the PBL can begin from the Engineering & Manufacturing Development (EMD) phase together with multiple performance indices considered. The genetic algorithm should be considered for the complex system to solve the maintenance policy optimization. In particular, the requirement of repair level analysis model is developed based on reflecting the PBL concept. To decide the maintenance policy prior to Operational phase in accordance with customer requirements, the PIDO(Process Integration and Design Optimization) technique useful in choosing the performance indices and changing the constraints was used. The genetic algorithm of PIDO tool, like PIAnO and ModelCenter, was verified that it could be applied to optimize the maintenance policy.

A Study on the Application of Performance Based Logistics (성과기반군수(PBL) 적용방안 연구)

  • Choi, Seok-Cheol
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.11 no.2
    • /
    • pp.88-94
    • /
    • 2008
  • It is very important for weapon systems to manage the logistic support for the better combat readiness. Therefore, in this paper we review the issues of logistic support and suggest alternatives to effectively manage the logistic support for weapon systems by using performance based logistics, especially during operations and support phase.

A Methodology for Creating a Simulation Model for a Agent Based and Object-oriented Logistics Support System (군수지원시스템을 위한 에이전트 기반의 객체 지향 시뮬레이션 모델 아키텍처 설계 방법론)

  • Chung, Yong-H.;Hwam, Won-K.;Park, Sang-C.
    • Journal of the Korea Society for Simulation
    • /
    • v.21 no.1
    • /
    • pp.27-34
    • /
    • 2012
  • Proposed in the paper is an agent based and object-oriented methodology to create a virtual logistics support system model. The proposed virtual logistics support system model consists of three types of objects: the logistics force agent model(static model), the military supplies transport manager model(function model), the military supplies state manager model(dynamic model). A logistic force agent model consists of two agent: main function agent and function agent. To improve the reusability and composability of a logistics force agent model, the function agent is designed to adapt to different logistics force agent configuration. A military supplies transport manager is agent that get information about supply route, make decisions based on decision variables, which are maintained by the military supplies state manager, and transport military supplies. A military supplies state manager is requested military supplies from logistics force agent, provide decision variables such as the capacity, order of priority. For the implementation of the proposed virtual logistics force agent model, this paper employs Discrete Event Systems Specification(DEVS) formalism.

A study on the Performance Analysis of PBL for Air Weapon System (항공무기체계 운영의 PBL 성과분석에 관한 연구)

  • Park, Keun-Seog;Yoon, Yong-Hyun;Eom, Jung-Ho
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.25 no.4
    • /
    • pp.52-60
    • /
    • 2017
  • This paper forces on the analysis of the overall outcome regarding Performance Based Logistics(PBL) application for Air Weapon System. We used data from domestically developed aircraft such as KT/A-1 and T-50 as well as data from foreign F-15K aircraft and F100 Engine to analyze the current ROKAF PBL application results. Furthermore, this paper thus suggests various techniques to maximize the outcome of user-based PBL performance such as clarifying the responsibility between customer and the company, developing standardized PBL performance index under TLCSM, PBL related maintenance capacity development, wartime PBL implementation process of domestic/foreign companies and many other schemes based on the analyzed data.

Construction and Application of Intelligent Decision Support System through Defense Ontology - Application example of Air Force Logistics Situation Management System (국방 온톨로지를 통한 지능형 의사결정지원시스템 구축 및 활용 - 공군 군수상황관리체계 적용 사례)

  • Jo, Wongi;Kim, Hak-Jin
    • Journal of Intelligence and Information Systems
    • /
    • v.25 no.2
    • /
    • pp.77-97
    • /
    • 2019
  • The large amount of data that emerges from the initial connection environment of the Fourth Industrial Revolution is a major factor that distinguishes the Fourth Industrial Revolution from the existing production environment. This environment has two-sided features that allow it to produce data while using it. And the data produced so produces another value. Due to the massive scale of data, future information systems need to process more data in terms of quantities than existing information systems. In addition, in terms of quality, only a large amount of data, Ability is required. In a small-scale information system, it is possible for a person to accurately understand the system and obtain the necessary information, but in a variety of complex systems where it is difficult to understand the system accurately, it becomes increasingly difficult to acquire the desired information. In other words, more accurate processing of large amounts of data has become a basic condition for future information systems. This problem related to the efficient performance of the information system can be solved by building a semantic web which enables various information processing by expressing the collected data as an ontology that can be understood by not only people but also computers. For example, as in most other organizations, IT has been introduced in the military, and most of the work has been done through information systems. Currently, most of the work is done through information systems. As existing systems contain increasingly large amounts of data, efforts are needed to make the system easier to use through its data utilization. An ontology-based system has a large data semantic network through connection with other systems, and has a wide range of databases that can be utilized, and has the advantage of searching more precisely and quickly through relationships between predefined concepts. In this paper, we propose a defense ontology as a method for effective data management and decision support. In order to judge the applicability and effectiveness of the actual system, we reconstructed the existing air force munitions situation management system as an ontology based system. It is a system constructed to strengthen management and control of logistics situation of commanders and practitioners by providing real - time information on maintenance and distribution situation as it becomes difficult to use complicated logistics information system with large amount of data. Although it is a method to take pre-specified necessary information from the existing logistics system and display it as a web page, it is also difficult to confirm this system except for a few specified items in advance, and it is also time-consuming to extend the additional function if necessary And it is a system composed of category type without search function. Therefore, it has a disadvantage that it can be easily utilized only when the system is well known as in the existing system. The ontology-based logistics situation management system is designed to provide the intuitive visualization of the complex information of the existing logistics information system through the ontology. In order to construct the logistics situation management system through the ontology, And the useful functions such as performance - based logistics support contract management and component dictionary are further identified and included in the ontology. In order to confirm whether the constructed ontology can be used for decision support, it is necessary to implement a meaningful analysis function such as calculation of the utilization rate of the aircraft, inquiry about performance-based military contract. Especially, in contrast to building ontology database in ontology study in the past, in this study, time series data which change value according to time such as the state of aircraft by date are constructed by ontology, and through the constructed ontology, It is confirmed that it is possible to calculate the utilization rate based on various criteria as well as the computable utilization rate. In addition, the data related to performance-based logistics contracts introduced as a new maintenance method of aircraft and other munitions can be inquired into various contents, and it is easy to calculate performance indexes used in performance-based logistics contract through reasoning and functions. Of course, we propose a new performance index that complements the limitations of the currently applied performance indicators, and calculate it through the ontology, confirming the possibility of using the constructed ontology. Finally, it is possible to calculate the failure rate or reliability of each component, including MTBF data of the selected fault-tolerant item based on the actual part consumption performance. The reliability of the mission and the reliability of the system are calculated. In order to confirm the usability of the constructed ontology-based logistics situation management system, the proposed system through the Technology Acceptance Model (TAM), which is a representative model for measuring the acceptability of the technology, is more useful and convenient than the existing system.

A study on the PBL Application Scheme for Optimal Maintenance of the KF-X Project (한국형전투기(KF-X)의 최적정비를 위한 PBL 적용방안에 관한 연구)

  • Park, Keun-Seog;Yoo, Yong-Hyun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.24 no.3
    • /
    • pp.10-18
    • /
    • 2016
  • This paper deals with the Performance Based Logistics(PBL) application scheme pertaining to optimal maintenance program for logistics of Korean Fighter Experimental(KF-X) Project. For enhancement of the performance based logistics system application to KF-X program the selection of appropriate standards fit to maximize cost-cutting, a set of performance metrics fit for the purpose of the contract, foreign technology dependence of core equipments and parts were considered. Thus, selecting appropriate standards fit for Korean logistics environment, domestic maintenance enterprise for stable rate of operation of KF-X, a systematic reliability task that is able to measure quantitative combat capability are suggested.

An Analysis on the Effect of PBL(Performance Based Logistics) Application for ROK Navy Landing Ship Fast(LSF-II) (해군 고속상륙정(LSF-II)에 대한 성과기반군수지원(PBL) 적용 효과 분석)

  • Chanjung Kim;Myoungjin Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.331-338
    • /
    • 2023
  • ROK Navy Landing Ship Fast(LSF-II) is equipped with special equipment that is not compatible with other combat ships due to special missions. So there are almost no maintenance capabilities except for simple repair parts replacement and maintenance parts. The researcher determined that the way to solve these problems was to apply Performance Based Logistics (PBL), and reviewed the cases of PBL applications abroad and domestically. To confirm the current maintenance capability, we visited LSF-II operation unit to identify maintenance capabilities for each mounted equipment, and interviews with operators and maintenance practitioners confirmed the limitations of outsourcing maintenance and the need to apply PBL. In order to analyze the effect of PBL application, the measure of effectiveness and measure of performance were selected based on the opinions of LSF-II operation/maintenance practitioners and PBL experts and the practical experience of this researcher. A survey was conducted on operation/maintenance practitioners and professional personnel. Based on the survey results, the effect of applying PBL was analyzed using the AHP technique, and an efficient PBL application plan was proposed for LSF-II.