Improvement Plan based on Awareness Investigation of Construction VE System in Domestic Construction (국내 건설공사 시공 VE 제도 인식조사에 기반한 개선방안)

  • Park, Jin-Young;Seo, Ho-Hyong;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.79-88
    • /
    • 2018
  • Construction business VE is classified into design stage VE and construction stage VE. The faster the application, the better the effect. Therefore, the design stage VE was legislated in 2000 and actively applied. However, it is urgent to activate the construction VE, which is complementary to the design VE system. In the meantime, we have made a lot of efforts to activate construction VE by suggesting the necessity of construction VE system, improvement of technology development compensation system, concrete implementation method of construction VE, but it was not effective due to lack of related laws. This study compares and analyzes construction VE system in Korea and abroad for the activation of construction VE after recognizing such domestic reality. A survey of experts in each field of the construction industry was conducted and suggestions for improvement of construction VE system suitable for domestic construction industry were suggested.

Establishment of Collaborative Decision Making Support Process in Pre-Final Design Step (건축 중간설계단계의 협력 의사결정 지원 프로세스 구축)

  • Oh Seung-Jun;Kwon Won;Kim kyung-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.315-318
    • /
    • 2003
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore The final object of this study is to propose the establishment method of decision support process for the cooperative design in order to provides improved design coordination and optimize the building system.

  • PDF

A Conceptual Study on Standardization for Drawings on the Basis of Collaboration (협업기능에 기반한 설계도면 표준화의 개념정립에 대한 연구)

  • Chin Kyung-Ho;Han Seung-Hun;Ryu Ho-dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.593-597
    • /
    • 2003
  • As construction projects are complicated and large in scale, a collaboration between project participants is getting more emphasized over the last few years. The collaboration tools for participants are various. but traditionally drawings and specifications have played an important role. Especially, though storage form in drawings vary in entire construction lifecycle, drawings are still important as the core factor in latest information technology streams in regard to usefulness and reusability of information. As an attempt to standardize drawings in the public construction based on CALS/EC, this study analyzes user's requirements for drawings qualitatively, and looks into drawings standards in Korea, America and Japan, and each kind of ISO standard for drawings. And this study predicts future-oriented user's requirement for drawings based on Construction CALS/EC, and presents future-oriented direction of development applicable in domestic drawing standard in construction.

  • PDF

A Preliminary Study on the Analysis of Constructability Issues in High-Rise Office Buildings (고층사무소 프로젝트의 시공성 항목 분석에 관한 기초연구)

  • Kwon Dong-Hyuk;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.235-238
    • /
    • 2002
  • The successful completion of a construction project requires a thorough understanding of all stages and phases of the project, and enhanced through integration of design and construction during the pre-construction stage. Constructability is a major factor in measuring the success or failure of construction project. During the pre-construction stage, lack of construction knowledge integration in the planning and design process is a major factor that leads to constructability problems during the construction stage. this study is to find out such problems based on interview and questionnaire in the structure's work of High-Rise Office Buildings. The objective of this study is to Identify Impact aspect of the structure's work of High-Rise Office Buildings.

  • PDF

Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case - (설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 -)

  • Yeon, Heejung;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

Numerical Experiment on Environmental Conditions of Mass Concrete (매스콘크리트의 주변환경조건에 대한 수치실험)

  • 이장화;변근주
    • Magazine of the Korea Concrete Institute
    • /
    • v.9 no.5
    • /
    • pp.217-224
    • /
    • 1997
  • 매스콘크리트의 타설시 온도이력을 정확히 예측하기 위해서는 재령별로 민감하게 변하는 시공 및 주변 환경요인을 엄밀히 반영하여 온도이력을 합리적으로 해석하는 것이 필요하다. 본 연구에서는 시공시에 발생되는 주변환경조건을 고려한 상태에서 온도이력을 해석할 수 있도록 개발된 해석프로그램을 이용하여 주변환경조건에 대한 수치실험을 수행하고자 한다. 수치실험의 목적은 매스콘크리트 타설시 각종 인자가 매스콘크리트의 온도이력에 미치는 영향정도를 정량적으로 파악하여 실제 매스콘크리트의 설계 및 시공시 사전에 콘크리트의 온도이력을 예측하여 효율적으로 관리하는데 있다. 수치실험을 수행한 결과주어진 구조물의 설계조건에 부가하여 타설시기, 타설온도,거푸집조건 및 제거시기, 양생 및 개기온도 등의 시공시 주변환경조건의 영향이 대단히 민감하게 작용하는 것으로 나타났다.

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

A Study on the Quality Control Plan for Waterproof Construction in Apartment Houses (공동주택 방수공사 품질관리 방안 마련에 관한 연구)

  • Kim, Kwang-Ki;Kim, Byoungil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.109-120
    • /
    • 2024
  • For successful waterproofing construction, it is very important to secure construction quality as well as material performance of waterproofing materials used in construction. Due to the long-term cost reduction policy following the economic downturn in the construction market, most construction companies are using general low-priced waterproof materials rather than high-quality waterproof materials without clear quality control standards. Without clear education on construction, construction is being carried out with meaning only on construction activities. In addition, the waterproofing method applied in combination is a situation where water leakage occurs due to waterproofing failure due to insufficient construction quality because the construction method is complicated. Therefore, it is necessary to review the quality control measures(design, materials, construction) for successful waterproofing work and improve problems that are derived so that stable waterproofing work can be done. In order to expect the leakage prevention effect of a building, first, it is required to select appropriate materials for each part of the building and environment in the design stage, and the selected materials must satisfy all items of the Korean Industrial Standard(KS). Second, to secure the quality of waterproofing construction, sincere construction by workers is required. In this paper, we tried to describe "review of waterproof design", "constructor education", "site inspection", and "criticism(correction/supplementation)" as quality control measures after material selection.