• Title/Summary/Keyword: 생애주기 비용분석

Search Result 207, Processing Time 0.028 seconds

A Case Study of Life Cycle Cost Analysis on Pavements in Apartment Complex (단지내 도로포장별 생애주기 비용 분석(LCCA) 사례 연구)

  • Jung, Jong-Suk;Park, Yong-Boo;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.297-303
    • /
    • 2014
  • Recently, block and permeable pavements have been placed in apartment complex. However. it is hard to decide the cycle of maintenance and repair due to lack of performance evaluation criteria for these pavements. This study carried out life cycle cost analysis(LCCA) to present resonable alternatives of the pavements by considering initial construction cost, maintenance and repair cost along with the cycle of repair. According to results of LCCA, the interlocking concrete block pavement is the best alternative when the repair cycle of 20years is assumed, while asphalt concrete pavement is the best alterative when the repair cycle of 10years is assumed. Therefore, the repair cycle is most important factor to select alternative. Also, it is necessary to develop resonable performance evaluation index to quantify the cycle of maintenance and repair in the future.

Economics analysis for life cycle cost design of bridges (LCC를 고려한 교량의 경제성 분석)

  • Shin, Yung-Seok;Pack, Jang-Ho;Ahn, Sung-Chan
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.162-165
    • /
    • 2010
  • 합리적인 교량 대안선정을 위해서는 설계 시 경제성, 경관성, 안전성 및 기능성, 유지관리 용이성, 시공성 등 다양한 속성을 고려하여야 한다. 이 중 경제성은 초기비용뿐만 아니라 공용수명에 걸쳐 발생하는 유지관리비용, 보수 보강비용, 해체 폐기비용 등의 합인 총 생애주기비용에 대해 최소의 비용으로 최상의 가치를 창출하도록 하여야 한다. 본 연구에서는 건설계획과정에서 대표적으로 고려될 수 있는 대안으로 세 가지 교량 형식(강상자형교, 소수주형교, PSC-I형 거더교)을 대상구조물로 선정하고 교량의 공용수명은 상태등급곡선으로부터 추정한 내하율 곡선을 사용하여 산정하였다. LCC최적설계를 위해 설계변수, 제약조건, 목적함수를 구성하였고, 총 생애주기비용을 공용수명으로 나눈 연간생애주기비용을 사용하여 하여 합리적인 교량의 경제성 분석을 수행하였다.

  • PDF

A Comparison Analysis of Life Cycle Cost (LCC) of Pumps - In the Focus on Comparison of Excellent and General Products in Water Industry - (Pump의 생애주기 비용(LCC) 비교 분석 - 물산업 우수제품과 일반제품의 비교를 중심으로 -)

  • Park, Woopyung;Choi, Yong;Jeon, Si Young;Kim, Jinho;Kang, Seongmi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.66-73
    • /
    • 2022
  • In order to induce users to purchase excellent products in the water industry that satisfy the technical standards of excellent products, in this study, it is to present the advantages of the cost aspect of the pumps as the objective basis. It will be to promote technology development of domestic water companies and to create a virtuous cycle structure in the water industry. In order to present an objective basis for the merits in terms of cost, an economic evaluation was conducted through life cycle cost analysis. For the LCC analysis, initial cost (pump cost and installation cost), operation cost (energy cost and maintenance cost) and demolition cost (disposal cost and residual value) are searched and calculated. As the results of comparison on two capacity of pumps, the energy cost of the excellent pump is 212 million KRW lower than the that of general pump in the large pump. The cost of excellent pump was 17 million KRW lower than that of general pump in small capacity pump. As the results of sensibility test, if the product is developed in the direction of improving pump efficiency and increasing the replacement cycle of consumables, it is predicted that the effect on LCC will be large.

Optimum Service Life Management Based on Probabilistic Life-Cycle Cost-Benefit Analysis (확률론적 생애주기비용-이익분석 기반 수명관리 최적화 기법)

  • Kim, Sunyong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.19-25
    • /
    • 2016
  • Engineering structures including civil infrastructures require a life-cycle cost and benefit during their service lives. The service life of a structure can be extended through appropriate inspection and maintenance actions. In general, this service life extension requires more life-cycle cost and cumulative benefit. For this reason, structure managers need to make a rational decision regarding the service life management considering both the cost and benefit simultaneously. In this paper, the probabilistic decision tool to determine the optimal service life based on cost-benefit analysis is presented. This decision tool requires an estimation of the time-dependent effective cost-benefit under uncertainty to formulate the optimization problem. The effective cost-benefit is expressed by the difference between the cumulative benefit and life-cycle cost of a deteriorating structure over time. The objective of the optimization problem is maximizing the effective cost-benefit, and the associated solutions are the optimal service life and maintenance interventions. The decision tool presented in this paper can be applied to any deteriorating engineering structure.

Optimal Life Cycle Cost Design of a Bridge (교량의 생애주기비용 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The importance of the life cycle cost (LCC) analysis for bridges has been recognized over the last decade. However, it is difficult to predict LCC precisely since the costs occurring throughout the service life of the bridge depend on various parameters such as design, construction, maintenance, and environmental conditions. This paper presents a methodology for the optimal life cycle cost design of a bridge. Total LCC for the service life is calculated as the sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The optimization method is applied to design of a bridge structure with minimal cost, in which the objective function is set to LCC and constraints are formulated on the basis of Korean Bridge Design Code. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on damage probabilities to consider the uncertainty of load and resistance. Repair and rehabilitation cost is determined using load carrying capacity curves and user cost includes traffic operation costs and time delay costs. The optimal life cycle cost design of a bridge is performed and the effects of parameters are investigated.

The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis (댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구)

  • Yoon, Jae-Ho;Moon, Young-Il
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.715-724
    • /
    • 2003
  • It is true that SOC facilities, such as dams, need long life cycles since more time has to be invested for the phases of planning, examination, feasibility study, design, contract, construction, and maintenance. This longer life cycle is easily exposed to the risk. And thus, brings additional cost by the delayed project, convenient loss according to the additional run of use, and benefit lose of not to using the facilities. So, the purpose of this study is to try to find a solution to reduce these time consuming problems which could diminish the whole national competition. Hence, this study is to show efficient, systematical project performance and network model by using reciprocal analyses between the construction period and cost based on economical analysis of each phase of life cycles. In addition, on the basis of these outputs, the Fast Track Method is suggested as an alternative solution as a new Approach in Life Cycle's Analysis.

Life Cycle Cost Analysis at Design Stage of Cable Stayed Bridges based on the Performance Degradation Models (성능저하모델에 기초한 사장교의 설계단계 생애주기비용 분석)

  • Koo, Bon Sung;Han, Sang Hoon;Cho, Choong Yuen
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2081-2091
    • /
    • 2013
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedently in civil engineering practice. Accordingly, in the 21st century, it is almost obvious that life-cycle cost together with value engineering will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, the most researches have only focused on the Deterministic or Probabilistic LCC analysis approach and general bridge at design stage. Thus, the goal of this study is to develop a practical and realistic methodology for the Life-Cycle Cost LCC-effective optimum decision-making based on reliability analysis of bridges at design stage. The proposed updated methodology is based on the concept of Life Cycle Performance(LCP) which is expressed as the sum of present value of expected direct/indirect maintenance costs with expected optimal maintenance scenario. The updated LCC methodology proposed in this study is applied to the optimum design problem of an actual highway bridge with Cable Stayed Bridges. In conclusion, based on the application of the proposed methods to an actual example bridge, it is demonstrated that a updated methodology for performance-based LCC analysis proposed in this thesis, shown applicably in practice as a efficient, practical, process LCC analysis method at design stage.

A Measure for Improving the Systematic Evaluation of the Life Cycle Cost in Technical Proposal Tendering (기술제안입찰에서의 계적인 생애주기비용 평가를 위한 개선방안)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.71-83
    • /
    • 2012
  • The use of technical proposal tendering has been expanding recently with the aim of effecting cost reduction, quality enhancement, technological development and value realization centered on multifunctional administrative cities, innovation cities, and the Yongsan relocation project. In line with the increasing interest towards life cycle cost improvement measures as an important evaluation category concerning technical proposal tendering, efforts in preparing measures that can execute the security of credibility and objective evaluation concerning architectural life cycle cost are being made. However, problems such as lack of applicable cases of design development and detail design, distortion of initial construction costs concerning the original plan, combination of constant price and current price, the ambiguity of the calculation standards between tendering corporations, inaccuracy of terms, and insufficient compositional formats concerning life cycle improvement measures are being cited. Accordingly, this study sought to propose a measure to improve the compositional guidelines, format, and standards so that a systematic life cycle cost evaluation can be executed for the reliable distinction of each participating corporation, enhanced credibility and objective evaluation of the life cycle cost improvement measure for technical proposals.

Corrosion Fatigue Reliability-Based Life Cycle Cost Analysis of High-Speed Railway Steel Bridges (고속철도 강교량의 부식 피로신뢰성 기반 생애주기비용 분석)

  • Cho, Hyo-Nam;Jeon, Hong-Min;Sun, Jong-Wan;Youn, Man-Keun
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.1
    • /
    • pp.107-113
    • /
    • 2008
  • As it recently appears that LCC (Life Cycle Cost) analysis may be considered as an essential method for economic evaluation of infrastructures. Many researches have been made to assess LCC of each facility based on reasonable methods. However, expected maintenance repair cost must be reasonably estimated to enhance the reliability of LCC analysis through systematic and rational methods. This study is intended to propose a rational approach to reliability-based LCC analysis of high-speed railway steel bridges considering lifetime corrosion and fatigue damage. However in Korea, since high speed railway steel bridges are only recently constructed, no direct statistical data are available for the account of the maintenance cost and thus their maintenance characteristics are not clear yet. In this paper, for the assessment of expected maintenance/repair cost, the fatigue system reliability analysis incorporating the corrosion effect is proposed by considering the corrosion and fatigue damage using measured data of high speed railway steel bridges. A model proposed by Rahgozar, of at for fatigue notch factor considering the corrosion effect is used in order to incorporate the corrosion effect into the fatigue strength reduction and S-N curve. Finally, the effectiveness of LCC model proposed for high-speed railway steel bridges is demonstrated by a numerical example.

Optimal Life-Cycle Cost Design of Steel Box Girders (강박스 거더의 생애주기비용 최적설계)

  • Shin Yung-Seok;Park Jang-Ho;Lee Hyun-Sub;Ahn Ye-Jun
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.18 no.4 s.70
    • /
    • pp.445-452
    • /
    • 2005
  • This paper presents a design method to minimize Life Cycle Cost (LCC) of steel box girders. The LCC considered in this paper includes initial cost, expected life-cycle maintenance cost and repair cost. A load carrying capacity curve is derived from a condition grade curve of steel girders and load tarrying capacity that is measured in safety diagnostic test. And then, optimal design of steel box girders is performed on the basis of load carrying capacity curve. In this paper time and number of times for repair of steel girders are determined based on the calculated load carrying capacity curve. Also, annual costs considering real discount rate are compared and analyzed in various cases. It is concluded that the optimal design of steel box gilders considering LCC by the presented method will lead to more economical and safer girders than conventional design.