• Title/Summary/Keyword: 생애(生涯)

Search Result 1,467, Processing Time 0.028 seconds

A Study on Determining Weight of Lifetime Value(LTV) using Analytic hierarchy Process(AHP) (계층분석과정을 활용한 고객생애가치 가중치 결정에 관한 연구)

  • 양광모;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.3
    • /
    • pp.131-140
    • /
    • 2002
  • Today's environment of enterprise is changing, They have to face customer' demands with the right product, the right service and supply them at the right time. And also cut down logistics and inventory cost and bring up the profit as much as they can. This means the change of putting enterprise first in importance to putting customer first importance. therefore to correspond to customer's demand, shorting lead time is becoming a essential condition. The answer to this changes of environment is supply chain management. In this paper, It consolidates the necessity on a LTV(Life Time Value) and analyzes data which is concerned of Customer Value. Under the these environments, defines the LTV(Life Time Value) rule that can improve the customer value. We solved this problems using AHP(Analytic Hierarchy Process) for consistency at relationship matrix, AHP(Analytic Hierarchy Process) is based on Saaty's consistency rate. If consistency rate is under 0.1 point, preference rate's weights are acceptable. This study develop a program for AHP weights and support Satty's consistency rate.

Life Cycle Cost Analysis of Steel Railroad Bridges Under Corrosive Environment (강철도교의 부식영향에 따른 생애주기비용분석)

  • 이종수;유선미;조선규;김만철
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.684-689
    • /
    • 2002
  • This paper represents the life-cycle cost(LCC) of steel bridges which are located on the train-network. Corrosion problems are mainly considered in the steel members such as steel plate girder, box girder, truss and arch. Based on the current value, initial construction cost, maintenance cost and demolition cost are calculated and life-cycle costs are formulated for the several types of bridges. From the comparison on each LCC, an effective painting method is recommended for reducing the LCC of steel bridges. Even though the initial cost of Super Weather Resistance Heavy Duty Paintings (Resin Fluoride) is expensive, because of the long endurance, the LCC of steel bridges painted with Super Weather Resistance Heavy Duty Paintings (Resin Fluoride) is less than that painted with General Heavy Duty (Rubber Chloride).

  • PDF

Development of VE/LCC Evaluation Model for Railway Route Selection (최적 철도 노선 선정을 위한 VE/LCC 평가 모델 개발)

  • 이동욱;이태식
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.215-222
    • /
    • 2004
  • Optimal route selection of railway should take consideration of the function of the railway, topography, practicability of construction and management as well as the cost. This study performed the surveys for experts and surrounding industries and the review for the bid guidelines in order to develop the quality model with the AHP method and establish the weight for each factor. Six quality models were developed for such as the efficiency of railway operation, structure design and practicability, economic feasibility, correspondence with other plans, civil appeal and environmental sustainability, and correspondence with system. The detailed evaluation elements were also derived by each factors.

Analysis of the Life Cycle Cost for the Ballasted Track and the Concrete Track Structures (자갈도상과 콘크리트도상 궤도구조의 생애주기비용 분석)

  • Baek, Jae-Wook;Song, Yoo-Seob;Park, Tae-Hyo
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1299-1305
    • /
    • 2006
  • In this paper, the objective is an evaluation of economics using Life Cycle Cost(LCC) analysis for the ballasted track and the concrete track. However, since the absence of reliable data on maintenance activities, the degree of a reliability about the results of the LCC analysis is insufficient yet. In order to remedy the problems, we surveyed a professional research group for an approximate estimation which can be represented a degree of maintenance through a application of examples. Hereby we found that it is possible to expect the retrenchment of cost using preventive maintenance management. Moreover we proposed appropriate and economical restrictions between track structures.

  • PDF

A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing (LCC 평가를 통한 지붕방수공법선정에 관한 연구)

  • Choi, Oh-Young;Kim, Tae-Hui;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.127-134
    • /
    • 2008
  • The purpose of this study is to propose the decision making technique in roof waterproofing method at the early construction stage. Selecting the suitable construction method is difficult because of the complex interrelationships between many factors of influencing the construction method selection. This study presents an example of selecting suitable method by analyzing LCC (Life Cycle Cost) in roof waterproofing work. In this study, roof waterproofing method is analyzed by LCC(Life Cycle Cost) which is consists of the initial costs, running costs, and removal costs. Sheet waterproofing, membrane waterproofing and asphalt waterproofing costs are compared to select the most economic method. The result of this study revealed that considering LCC is useful in selecting the proper method in the construction work.

A Study on Sensitivity Analysis of Life-Cycle Cost of Concrete Bridges (콘크리트 교량의 생애주기비용 민감도 분석)

  • Koo, Bon-Min;Byun, Kuen-Joo;Song, Ha-Won
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.773-776
    • /
    • 2004
  • The so-called Life Cycle Cost (LCC) analysis on reinforced concrete bridge can provide useful information for initial design and maintenance plan of the RC bridge. This paper proposes an LCC prediction equation and a sensitivity analysis method for RC bridges. An LCC equation for the RC bridge which includes initial investment cost, maintenance cost, and demolition cost was derived and verified from the data for design and construction of an RC slab bridge. In order to solve uncertainty problem on actual discount rate and material characteristics in the analysis of LCC of concrete bridges, a sensitivity analysis method on the LCC using the Monte Carlo simulation technique was suggested.

  • PDF

Framework on a Prediction Model for Building Repair & Maintenance Using Big Data Analytic Approach (Big Data 분석 방법론을 이용한 건물 유지보수 예측 모형 기본 방안 개발)

  • Lee, Eun-Ji;Choi, Byoung-Il;Ko, Yong-Ho;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.114-115
    • /
    • 2013
  • The maintenance and repair period consists the largest part of a construction project life cycle cost. However, it has been analyzed that the repairing plan relies on regulations and the officers' experience mostly that sometimes lead to performing unnecessary work. Moreover, the data occurred during repairing have not been stored in a system that can be used in future plans. Therefore, the purpose of this study is to suggest a repairing cost and time predicting model by applying the properties of the building.

  • PDF

A Study on the Estimating Process for Life Cycle Cost based on BIM (BIM기반 Life Cycle Cost 산정을 위한 프로세스에 관한 연구)

  • Lee, Hyun-Joo;Moon, Joon-Ho;Park, Gyu-Tae;Kim, Tae-Hee;Kim, Kwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.149-151
    • /
    • 2011
  • Recently, Architectural Design based on Building Information Modeling(BIM) is popular, construction management based on BIM is necessary. such as Quantity take off, scheduling, and Life Cycle Cost Estimating etc. Therefore, in the study, LCC Estimating using BIM Data, which is extracted from architectural designing process is proposed.

  • PDF

A Basic Study on School Facility Management for Violence Prevention Based on CPTED Method (CPTED이론을 적용한 학교시설물 유지관리 방안 기초연구)

  • Kim, Boo-Young;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.112-113
    • /
    • 2013
  • For prevention of the school violence, many researchers have been conducted the studies based on crime prevention through environment design(CPTED) in the architecture planning phase. However, besides of architecture planning, the study considering the aspect of the facility management is needed during life cycle of educational facilities. In this study, the objective is to propose the effective school facility management for violence prevention based on CPTED method during life cycle of the facilities.

  • PDF

A study on Improvement Method for Systematic Defect Management of Apartment Life-cycle (공동주택 생애주기의 체계적인 하자관리를 위한 개선 방안 연구)

  • Park, Chang-Wook;Yun, Seok-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.618-621
    • /
    • 2007
  • The existing defect management is focused on step before closing work, a builder preliminary research and tenant preliminary research. Each step is not related. And the existing study on defect management mainly classify into work type and defect type according to work type. This study divide into defect part. Also this study propose PDA based web and 3DCAD for improving method of existing defect management.

  • PDF