• 제목/요약/키워드: 생산성 관리

Search Result 3,577, Processing Time 0.04 seconds

A Study on Productivity Improvement Scheme Through Site Case Study In PSM (현장 사례를 통한 PSM 공법의 생산성 향상 방안에 관한 연구)

  • Lee Tai Sik;Lee Won Yong;Kim Gil Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.541-544
    • /
    • 2001
  • PC Box Girder was constructed by PSM(Precast Span Method) to solve the shortage of the construction period. The site case study was used in the PSM to find the construction productivity improvement. In this case study, main reasons of low productivity were founded unskilled technical engineers and insufficient equipment management winter season concrete curing condition. Productivity improvements are presented by assigning production personnel appropriately, motivation which increased by providing incentives for technical engineers, strictly cooperation of each participant, organizational teamwork, and Promoting productive work condition. Additional method of productivity improvements are continuous improvement of the work methods by considering the feedback on previous work, and continuous training to best handle the site conditions. This study of productivity improvement will help to use the most advantage of the PSM method and desire to successfully plan the future construction performance.

  • PDF

A Study on the Analysis of Planning and Management Factors of Finishing Works Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 마감공정의 계획 및 관리요인 분석에 관한 연구 - 초고층 주거건축물 공사 건식벽체공법을 대상으로)

  • Lee, Chi-Joo;Kim, Jae-Joon;Lee, Yoon-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.132-140
    • /
    • 2007
  • There is an increase in interest and investment in high-rise housing as it is perceived to be a new value-added market in the construction industry. In constructing a high-rise housing, the finishing works are executed in accompaniment with many other activities that are progressed repeatedly and spontaneously on each floor. It was reported that the duration of finishing works differs according to the management ability of the executing company and has a significant effect on the entire project duration. We suggest a need to concentrate on important management factors by analyzing the factors affecting the productivity of finishing works based on the site characteristics in high-rise housing. There are various complex productivity-affecting factors including the technical factors involved in planning and managing the processes of finishing works. From the viewpoint of planning and management factors, the importance of productivity-affecting factors was analyzed using the Analytic Hierarchy Process (AHP). A continuous examination of the management of high-importance factors will make it possible to improve productivity by enhancing the understanding of productivity-affecting factors of finishing works and suggesting a practical management direction.

Development of an Auto Socket Management Technique for Semicon Production Syste, (반도체 생산 시스템의 자동 Socket 관리 기술 개발)

  • 정화영;김종훈
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1999.10c
    • /
    • pp.167-169
    • /
    • 1999
  • 산업응용 시스템에 있어서의 생산성이란 시스템의 성능 및 효율성에 관한 척도가 된다. 따라서, 시스템의 개발 전과정에서 이를 향상시키려는 많은 노력이 이루어진다. 특히 반도체의 제조공정에서는 이를 위한 노력이 민감하게 발전되어 왔다. 이들 중 IC Test Handler의 Socket관리는 제품(Device)의 생산량과 함께 시스템의 효율성에 직접적인 영향을 주는 부분으로 많은 연구 및 개발이 이루어지고 있다. 본 논문에서는 이러한 생산성 및 효율성을 높이기 위한 자동 Socket 관리 시스템을 개발하여 사용자(Operator)에게 보다 향상된 시스템 환경을 제공하고자 한다. 이를 위해 PC 환경의 GUI 시스템을 도입하였으며, 실제적인 제어부분은 Real Time 운영체제를 탑재한 VME 시스템이 담당하였다. 또한, 신뢰성을 위하여 날짜별 데이터를 하드디스크에 저장하여 Socket 데이터를 사용자가 확인할 수 있도록 하였다.

  • PDF

Productivity Obstacle Factors Analysis For The Overseas Chemical Plant Utilizing The Revised IPA (수정 IPA를 활용한 해외 화공플랜트 생산성 저해요인 분석)

  • Jeon, Woo-Geun;Lee, Suk-Won;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.17-26
    • /
    • 2017
  • The total amount of overseas plant orders obtained by Korean construction companies in 2015 decreased by approximately 51% from the previous year. While a chemical plant sector has the highest portion of the plant orders by accounting for 63% of the plant industry, its orders also decreased by approximately 43% in the same year. Recently, plant construction companies in overseas projects have been dominating the engineering sector owing to their advanced technology, experience, and accumulated knowledge. Therefore, measures must be taken to secure the competitiveness of domestic companies in the global plant industry. Especially, productivity management is an important issue to strengthen the national competitiveness with the development of construction technology. As the productivity influences long term growth, we analyze productivity obstacle factors by using the revised IPA, a technique to measure attribute importance and performance. With the identified factors, we suggest improvement plans and measures to enhance productivity of overseas chemical plant projects. This study will help the companies to come up with medium and long term measures by discussing results and implications it provides.

Datamodel for Productivity Management of Construction Project (건설공사 생산성 관리를 위한 데이터모델)

  • Ryu Han-Guk;Yu Jung-Ho;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2002
  • Construction delay claim occurs more often than any other claim. Delay claim impacts adversely the company's existence as well as the project's monetary problem. Because the calculation of the delay is not quantitative, owing not to have enough evidence, it is hard to solve evenly the delay claim. So, it is need to cumulate structurely the construction data or evidence during the construction. This study considers the established study about construction delay claim database and the problems and then presents the relation method between phase schedule and database. Finally, this study established the productivity claim database modeling for construction project through conceptual database modeling and logical database modeling based on information needed to make construction productivity database. So. the purpose of the study is to establish the datamodel for productivity management of construction project for calculating the delay days considering the lost productivity.

  • PDF

Analysing Decision Factors of Delivery System for Finishing Work in High-Rise Building Construction (초고층건물 마감공사의 발주방식 선정요소에 대한 연구)

  • Lee Jae-Il;Ahn Byung-Ju;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.345-348
    • /
    • 2003
  • The overall ability to manage the construction projects from an integrated perspective is important due to the emerging of high-rise building constructions. Potential hazardous of low productivity exist in the finishing work of high rise building a distinct example of the projects. Especially, the number of activities that should be controlled during finishing work is more than during skeleton work. Thus field managers should attract more attention to manage finish work activities. The low productivity of these activities can diminish that of skeleton work. Decision factors of the delivery system for finishing works in the high-rise building project is established by means of literature review and questionnaire survey and a basis to analyze the effects of the criteria to the deli very system is presented.

  • PDF

생산성 향상을 위한 환풍기 조립생산의 애로공정분석에 관한 연구

  • 정영득;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2001.05a
    • /
    • pp.287-291
    • /
    • 2001
  • 본 연구에서는 생산성이 저하되고 있는 DWV-2O/ 25 DRG(수동개폐식) 모델과 DWV-20/25 DRA 모델을 대상으로 조립생산시스템에서 발생되고 있는 애로공정의 문제점과 불량품 발생 상태를 관리 기술적인 견지에서 분석하여 생산성 향상을 증대하고자 하는데 목적이 있다.

  • PDF