• Title/Summary/Keyword: 상수도시설

Search Result 211, Processing Time 0.027 seconds

Intrusion Detection Methodology for SCADA system environment based on traffic self-similarity property (트래픽 자기 유사성(Self-similarity)에 기반한 SCADA 시스템 환경에서의 침입탐지방법론)

  • Koh, Pauline;Choi, Hwa-Jae;Kim, Se-Ryoung;Kwon, Hyuk-Min;Kim, Huy-Kang
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.22 no.2
    • /
    • pp.267-281
    • /
    • 2012
  • SCADA system is a computer system that monitors and controls the national infrastructure or industrial process including transportation facilities, water treatment and distribution, electrical power transmission and distribution, and gas pipelines. The SCADA system has been operated in a closed network, but it changes to open network as information and communication technology is developed rapidly. As the way of connecting with outside user extends, the possibility of exploitation of vulnerability of SCADA system gets high. The methodology to protect the possible huge damage caused by malicious user should be developed. In this paper, we proposed anomaly detection based intrusion detection methodology by estimating self-similarity of SCADA system.

Rehabilitation with the Green Method for the Huge Pipeline Using a Dry-Type Equipment (녹색공법을 이용한 대형 수도관 갱생)

  • Kim, Young-Ju;Choi, Byoung-Seub;Lee, Sang-Hyun;Hong, Dae-Sung;An, Hyo-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.282-286
    • /
    • 2009
  • 1979년 준공된 수도권 광역상수도 1단계 시설은 상당한 노후화가 진행되었을 것으로 예상되며, 또한 향후 한강하류권 용수공급계획이 예정되어 있어 내부부식 및 관로손상부 개량의 시급성이 제기되었다. 이에 따라 직경 2,800${\sim}$800mm의 초대구경 도수관 53.9km의 개량을 위한 사업이 추진되었으며 시공성, 환경성, 경제성 등의 여러 항목에 대한 검토 결과 신개념 녹색공법인 비굴착식 건식일체형 공법이 최종 선정되었다. 그동안 기존관 개량공사에서 주로 사용되었던 굴착공법이 굴착에 따른 공기지연, 소음 분진 악취 등의 환경오염, 전구간 굴착에 따른 공사비 증가 등 많은 문제점을 안고 있는 것에 반해, 동사업에서 채택된 비굴착공법은 관로내에서 작업이 이루어지므로 공기단축, 환경오염 최소화에 따른 민원발생 최소화, 작업구만 굴착함에서 오는 공사비 절감 등 상대적으로 훨씬 우수한 것으로 평가된다. 동공법에 따르면 관내부 갱생공사는 '배수 및 잔류토사 제거'${\to}$'관내건조'${\to}$'표면처리'${\to}$'프라이머도장'${\to}$'본도장'의 순으로 진행된다. 일체형 장비에 의한 이와 같은 초대형관의 자동화시공은 세계에서 처음 적용되는 것이다.

  • PDF

About the Designation of Privacy and Information Protection Firm (정보보호전문업체 지정에 즈음하여)

  • Shin, Hoon
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.4
    • /
    • pp.62-64
    • /
    • 2001
  • As of July 1. 2001, the Law of Information 8t Telecommunication Protection has been compulsory to audit protection status on national information and Telecommunications Infra facilities such as communication, electricity, waterworks, airport, railway, primary facilities of government and the first financial circles. In U.S. institutions, organizations and corporations in each field are trying to prepare for Safe Har-bor agreed on Internet privacy regulation between U.S. and Europe to be effective in 2003. The Safe Harbor was motl-vated by strict European standard. Other countries make privacy and information protection law according to their own interest. Therefore Korean technical experts have to develop the law responding to national interest and public welfare. Besides scientific Held, experts in the field of politic, economy and academy also have to work hard to develop the law.

  • PDF

Adaptive Management of Water Supply Systems to Deal with Climate Changes: A Gwangdong Dam Case Study (기후 변화 대응을 위한 상수도 시설 적응형 관리의 필요성: 2008-2009 광동댐 취수 제한 사례 연구)

  • Lee, Sangeun;Choi, Dongjin;Park, Heekyung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.5
    • /
    • pp.583-598
    • /
    • 2009
  • From the engineering standpoint, this study puts a special emphasis on application of adaptive management. To do this, we analyze the recent issue about water scarcity of the Gwangdong dam. Using the system dynamics model, we defined the system including water balance in the dam, dam manager's operation rules, regional water supply and local water distribution, and customer damage. It was expected that the model is useful to explain the real case, and also water scarcity of Gwangdong led to total damage of about 2.56 billion won, mainly to customers in the Taebaeck city. Two adaptive management options (i.e., optimal allocation of limited water resources, and early control of dam storage) were applied to the model in order to examine whether adaptive management is effective to mitigate the damage, it is concluded that the case study could largely reduce or entirely avoid the damage with adaptive engineering options.

Modeling Mixing of Suspended Sediments in Paldang Lake (팔당호의 부유사 확산 거동 모의)

  • Seo, Il-Won;Jun, In-Ok;Choi, Nam-Jung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1664-1668
    • /
    • 2008
  • 팔당호는 수도권의 상수원수로서 매우 중요한 역할을 맡고 있다. 팔당호의 수도권 상수도 공급량은 전체 공급량에 32%를 차지하고 있으며, 현재 4개의 취수구에서 상수원수가 취수되고 있다. 취수장의 총 취수시설 용량은 $9.02{\times}10^6\;m^3/day$ 규모이고, 실제 취수되는 양은 약 $4{\times}10^6\;m^3/day$이다. 따라서 팔당호의 지속적인 수질관리 및 수질예측이 중요하다고 할 수 있다. 실제로 팔당호는 여러 가지 수질 문제를 안고 있다. 팔당호 상류의 인구가 증가하고 도시화되면서 유입되는 오염물질의 양이 증가하고 있으며 이런 상황에서 상수원수로서 필요한 수질을 확보하는 데에 어려움을 겪고 있다. 특히 집중호우 시 호수 및 하천에 발생하는 부유사 문제가 심각한 수준이다. 하천에서 부유사 문제는 수자원 이용뿐만 아니라 하천 생태계까지 피해를 미치게 된다. 따라서 부유사 거동에 대해 해석하는 모형개발에 대한 연구가 필요한 실정이다. 본 연구에서는 이렇듯 중요성과 문제성을 동시에 지니고 있는 팔당호의 수질을 예측, 관리를 위해 2차원 수질모델을 이용하여 부유물질 확산거동을 예측하고자 한다. 수로연장이 길고 수심이 깊은 댐이나 호수에서는 x-z방향으로 구획을 나누고 하천, 하구나 만에서는 수심보다 수평방향 면적이 넓기 때문에 x-y방향으로 구획을 나누는 것이 일반적이며, 팔당호의 경우 수리학적으로 큰 규모의 호수이기 때문에 이러한 2차원 모형을 이용하는 것이 적합하다. 본 연구에서는 2차원 수질 해석모델인 SED-2D를 이용하여 부유사 확산 거동에 대한 해석모델 개발을 연구하였다.

  • PDF

Expert System for Emergency Decision Making for Metro Water Supply Systems (광역상수도 시설의 비상시 의사결정을 위한 전문가시스템)

  • Kim, Eung Seok;Kim, Joong Hoon;Baek, Chun Woo;Lee, Jung Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.1
    • /
    • pp.103-110
    • /
    • 2007
  • An efficient operational strategy using expert system for metro water supply systems in case of emergency situations is developed in this study. The emergency situations of the water supply systems are classified into three categories : pipeline system accident, machinery and electric facility accident and water quality accident. A PC-based expert system is developed using CLIPS for Seoul metro water supply system, Phase 1 & 2 system and Phase 3 & 4 system. Broad professional knowledges and experiences from the experts in the water supply systems have been collected systematically to construct the knowledge base. Decision-making in case of an emergency is based upon the professional knowledge so that a rational and efficient operational management can be available even in the absence of experienced expert. Especially the expert model developed in this study also provides a guide for pumping operation in case of pipeline accident to confirm that the proper pressure to all nodes in the system is supplied. The pipe network simulator KYPIPE has been consecutively executed by trial and error fashion for each pipeline in the system. The results from KYPIPE were included in the knowledge base to supplement the knowledge of the field engineers.

A Study on the Application of Roof Panel Shield Method (RPS 공법의 적용성 연구)

  • Kim, Jung-Hyi;Jung, Byung-Chul;Shin, Eun-Chul;Kim, Jong-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1585-1592
    • /
    • 2008
  • 산업사회의 발전에 따라 사회 기반시설분야도 복잡다양해지고 특히 도시기능이 활발해지면서 지금의 도심지에는 지하철, 상수도, 하수도, 전력구, 통신구, 지하보차도, 지하상가, 지하주차장 등 여러 가지 용도의 지하공간이 요구되고 있으며, 이러한 지하 구조물을 축조하는데 있어 도로상에 차량 증가로 인한 교통 혼잡이나, 지하매설물의 장애로 인하여 기존의 개착식 공법으로 시행하지 못하고 지하터널공사로 시행하는 경우가 빈번하다. 기존 국내 외 터널공법 관련문헌과 현재 사용되는 터널공법의 실제 시공에 관한 정보를 수집하여 장 단점, 시공시 주의사항, 적용조건등의 조사내용을 바탕으로 RPS 공법을 고안하였다. 소규모 지하구조물을 구축하기 위한 RPS 공법은 출발갱내에서 상부에 파이프 루프를 시공한 후 광폭 유압 패널이 장착된 철제 선도관을 추진시켜 선도관을 원압잭에 의하여 압입한 후 P.C. 콘크리트 구조물을 거치하고 원압으로 압입 추진토록 하였다. 또한, 대규모 지하구조물 축조시에는 구조물 예정상단부에 지반조건에 따라 파이프 루프공법 또는 소구경 Semi-Shield 공법을 이용하여 루프를 시공함으로써 상부의 침하를 방지하고, 측벽은 광폭유압 패널을 이용하여 여굴의 최소화 및 곡선부 시공을 용이하게 하였다.

  • PDF

Design of versatile controller system for water treatment (수 처리를 위한 다목적 컨트롤러 시스템 설계)

  • Baek, Sung-hyun;Jang, Jong-wook
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.05a
    • /
    • pp.432-435
    • /
    • 2014
  • 하수관거는 생활환경의 개선, 공중위생, 침수방지 공공수역의 수질보전 및 건전한 물 순환 등을 구축하기 위하여 반드시 필요한 도시기반시설이다. 이러한 하수관거는 시가지의 하수를 배제, 처리하여 공공수역의 수질을 보전함으로서 생활환경을 개선하고, 우수를 신속히 배제함으로써 도시재해를 방지하는 등 2가지 기능을 갖고 있다. 지금 현 상 하수도 시스템은 우수, 하수나 둘 다 무조건 하수처리장으로 유하하여 처리하는 실정이다. 이러한 시스템에서는 평상시에는 문제가 없으나 강우 시에 한 번에 많은 우수가 하수 처리장으로 유하되어 하수 처리장의 처리 능력이 초과 되어 오히려 역효과를 일어 날 수 있고, 하수처리를 할 때 필요한 세제 및 재료들이 추가로 더 사용되기 때문에 정부의 국고 낭비가 되고 있는 실정이다. 그래서 본 과제에서는 이러한 단점을 보완하기 위하여 수 처리를 위한 다목적 컨트롤러 시스템을 설계 및 제안한다. 그 결과, 하수관거의 유량 및 수질을 검사 하여 하수일 경우에는 하수처리장으로 유하하고, 깨끗한 수질일 경우에는 바로 공공수역과 하천으로 흘려보내어 하수 처리장의 불필요한 처리능력에 대해 감소시킬 것이다. 추가로 각 디바이스에서 유 무선 통신으로 인한 디바이스에 대한 모니터링이 가능하고 데이터베이스에 항상 저장하기 때문에, 디바이스에 대한 관리가 쉬워지며, 관리에 대하 관리비를 줄 일 수 있기 때문에 1석 2조의 효과를 거 둘 수 있을 것이다.

  • PDF

Expansion of Water Reuse Facility for Building Unit to Solve Water Shortage Problem (물 부족 문제의 해결을 위한 건축물 단위의 물재이용 시설 확대 방안)

  • Park, Yong-hwa;Shim, In-tae;Kim, Hyun-jin;Jang, Am
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.7
    • /
    • pp.377-384
    • /
    • 2017
  • This study examined the possibility of solving the water shortage problem through the water reuse of buildings through the Suwon water reuse (greywater) facility installation project conducted as a pilot project of Ministry of Environment. Water reuse of individual building units can reduce city water demand by up to 25%. This is a level that can solve the water shortage problem in Korea. However, in order to revitalize the water reuse facilities of individual buildings, it is necessary to solve the problem of the user's rejection of the greywater and the economical problems. The resolution of the user's rejection can be solved by linking the MBR process with the AOP process. When the MBR process and the AOP process are operated in conjunction with each other, it is found that the users do not feel the water quality difference with the tap water. Economical problems can be solved at the water rate levels when the facility capacity is over 100 ton/day considering the construction cost and the operation cost, and when the operation cost alone is over 15 ton/day. Furthermore, when considering the social benefit cost, it is found that profit is generated from 150 ton/day.

Introduction plan of future integrated water circulation management system using LID facility model verification (LID시설 모델검증을 활용한 미래형 통합 물순환관리시스템 도입방안)

  • Lee, Jiwon;Gil, Kyungik
    • Journal of Wetlands Research
    • /
    • v.23 no.1
    • /
    • pp.67-73
    • /
    • 2021
  • As the impermeable area increases due to urbanization and industrialization, the influence of non-point pollutants caused by rainfall runoff on the water system is increasing. In the past, the best management practices(BMP) were used a lot to manage non-point pollutants, but recently, technology that naturally treats them through LID (Low Impact Development) technology is widely used. In this study, various rainfall events were simulated through the SWMM model based on the data of rainfall monitoring in bioretention among natural facilities. The characteristic of LID modeling research is that it is difficult to build accurate modeling data with short-term data because real data is the result obtained through natural facilities, and it is difficult to implement an accurate model. In this study, the data monitored for 3 years It is significant in that it has built a precise model. The actual data monitored a total of 18 times was simulated, and the inflow and outflow and the removal efficiency of five pollutants were simulated. As a result of performing the performance evaluation, most of the 7 items showed excellent indicators, and the TN and TP showed relatively low simulation performance. In the future, it is expected that Korea will introduce an integrated water management system in which the water supply system and the sewage system are substantially integrated and operated. Therefore, the results of this study are considered to play an important role in the initial stage of rainfall management in the future integrated water management system, and the extent of rainfall runoff reduction and pollutant reduction in the expected installation area can be predicted in advance. This is expected to prevent overdesign of bioretention.