A Feasibility Study on the Research Infrastructure Project of System Semi-Conductor Industry (시스템 반도체산업 기반조성사업의 타당성 분석 연구)

  • Kim, Dae Ho
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.9 no.2
    • /
    • pp.87-95
    • /
    • 2014
  • The High-price development & testing tools and IP infratstructures are required for the development of system semi-conductors, but SMEs have not ability to prepare for them. Recently in terms of the miniaturization and the advancement of semiconductor process, the cost of the semi-conductor development have shown the rising tendency and the market-based design tools used are requied to be upgraded due to the advancement in the environment and technology. On the contray, many other contries such as Taiwan, Japan, China, and User are supporting this system semi-conductor industry. Korean government is trying to build the research infrastructure for system semi-conductor industry that aims to reduce the costs of the design infrastructure investment, to support the companies of system semi-conductor development and to incubate the fab-less start-ups. This study analyzes the feasibility of the project, by using the AHP analysis and the results shows that this project is considered feasible because the AHP overall score is evaluated as 0.840, the overall score is greater than or equal to 0.55.

  • PDF

Analysis of Influencing Item of Green Building Certification;Focused on Energy Part of Commercial Buildings (친환경 인증 사업타당성 영향요인 분석;업무용건축물의 에너지 평가부문을 중심으로)

  • Kook, Dong-Hoon;Kim, Ah-Yung;Han, Kap-Kyu;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.431-435
    • /
    • 2007
  • Green Building Certification Program, which was first introduced to residential buildings in Korea in 2002, has been put on track. This program is expected to bring about the effect in the economic viewpoint that was based on a life-cycle-cost analysis, not to mention the environmental viewpoint. However, given the fact that the existing model for feasibility analysis focusing on early investment cost can hardly be applicable to the green buildings because of lacking the life-cycle-cost reduction factor, it remains still difficult to conduct an objective evaluation. The study thus was intended to identify the factors that should be additionally considered in conducting the feasibility study to be implemented through the analysis of the certification items of green buildings as a preliminary study in structuring the evaluation model for feasibility analysis of green buildings.

  • PDF

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구)

  • Lee, Chun-Kyong;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.905-908
    • /
    • 2008
  • The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.

  • PDF

Literature Studies for Testing validity of Business Model of High-tech Starts-up;Utilizing BMO Model (창업기업의 비즈니스 모델 타당성 평가방안의 이론적 고찰;BMO 모델 응용 중심으로)

  • Chung, Hwa-Young;Yang, Young-Seok
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.2 no.2
    • /
    • pp.1-22
    • /
    • 2007
  • This paper is targeting on developing pre-test Methodology for start-up as tuning successful business modelling with their implementation. Start-up is asked to a complete preparation and analysis for business to enhance the success possibility. In this stream, Start-up should test the validity of their business model before starting a business. This paper deliver alternatives to meet this requirement. Overall, this paper suggest two different approaches. First, by literature review, this paper prove the importance of BM in success factor analysis of high-tech start-up. Second, This paper prove BMO Model as the best practicing model to assess the validity of BM. Additionally, this paper, BMO will be utilized to bring significant implications to sort out enhancing strategies of BM validity.

  • PDF

Evaluation Methods of Sociality in the Decision Making Process for Dam Construction (공공사업(댐)의 의사결정시 사회성 평가 방법)

  • Kim, Woo-Ku;Kim, Tea-Young;Lee, Gwang-Man
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.657-662
    • /
    • 2006
  • 공공사업의 목적은 사업을 통해서 발생하는 혜택을 인간 및 사회가치 적합하도록 최대한 확산하고자 하는 것이다. 그럼에도 불구하고 당해 사회적 가치를 고려하지 않는 경제 및 정책 범주에서만의 분석은 공공사업의 추진타당성에 신뢰저하를 가져오거나 사업추진지역사회의 막연한 불안감(저항)에 효과적으로 대응하지 못하는 문제를 일으키고 있다. 따라서 타당성 있는 사업추진 및 지역사회 저항을 극복할 수 있는 방법발견은 중요하다고 하겠다. 해결방향은 공공사업으로 영향 받는 당해지역에서의 경제(정책포함)외적인 제약조건까지 파악하여서 전반적인 사회경제적가치(시장가치)를 재발견해 가는데 있다. 그것은 공공사업의 예비타당성 평가시에 잠재적으로 부딪힐 저항이나, 개발이후에 발생할 수 있는 확산가치까지도 대상에 포함시켜야 한다는 의미이다. 주지하는 바와 같이 잠재적 가치는 경제적 요소에서만 발생하기 보다는 당해지역의 사회문화적 잠재성 극대화에서 나온다. 지금까지의 계획수립과정은 정부와 전문가집단이 중심이 되어 계획을 수립하고 작성된 계획안에 대해 시민단체, 환경단체 등 이해당사자들이 공청회나 공람을 통해 의견을 제시하는 소극적 프로세스였다. 한편, 대안적 프로세스는 계획수립의 초기단계부터 다양한 이해당사자를 참여시키고 이들을 보조자가 아닌 계획수립의 주체로서 인정하고 협의와 조정과정을 거쳐 합의를 도출함으로써 계획의 정당성을 확보하고 실행가능성을 높이는 방식이 유용할 것으로 사료된다. 본 연구는 미래지향적 가치를 포괄하고 있는 예비적인 사회적 타당성의 평가항목 및 방법을 제시하고자 한다. 이것은 일반적으로 사회영향평가(SIA: Social Impact Assesment)모델을 통해서 공공사업 및 민간사업이 당해 사회에 미치는 영향을 파악하고, 이의 대응방안 마련에 초점을 맞추고 있다. 주요 내용은 공공사업관리방식의 체계를 파악하고 공공사업의 사회적 타당성 및 국내외 적용사례 분석을 통한 시사점 도출과 사회성 검토항목 및 평가방법을 제시한 후, 우리나라에의 적용방안을 검토하였다.

  • PDF

The Feasibility Analysis of Urban Public Rental Housing in Korea (도심형 공공임대주택의 사업타당성 분석)

  • Kim, Ok-Yeon;Kim, Yong-Tai;Kim, Yong-Soon
    • Land and Housing Review
    • /
    • v.6 no.3
    • /
    • pp.117-127
    • /
    • 2015
  • Korean government has launched a new public rental housing policy for younger generation suffering from instable housing conditions in CBD area. This paper is to analyze the financial feasibility of urban public rental housing projects, based on its cash flows. Urban rental housing projects should find out the way to reduce costs and to secure cheap land, because of the high land price in CBD area and complex relationship of legal rights. Project types are categorized by the land acquisition method and district characteristics. For 10 sample projects, financial feasibility was analyzed. Cash flows were calculated on the design plan and 16 scenarios were made by combining 4 important variables. The variables are increase rate of land price, increase rate of monthly rents, ratio of public and market rents, and the interest rate of National Housing Fund. The findings are as follows. Government land rent-type can reduce initial costs because it is not necessary to buy land. However, total NPV is lowered at the time of liquidation due to the land return. Private land acquisition-type require more initial costs. But the NPV at liquidation time increases with land disposal. To improve financial feasibility, acquisition-type should be preferred in high land-price area and rent-type should be preferred in low land-price area. Among influencing variables, the rate of increase in land price and the ratio of public and market rents turned out to be the most important. Although the ratio of public and market rents can be controllable, high ratio will cause the burden of tenants. Therefore, interest rate adjustment of National Housing Fund is more desirable.

Financial Feasibility Study by Considering Risk Factors for High-Rise Development Project (초고층 개발사업의 리스크 요인을 고려한 재무적 타당성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.3-16
    • /
    • 2017
  • Forecasting cash flow is very important but is difficult and complicated to analysis in high-rise development projects. And An expected value which was forecasted on the early stage is likely to fluctuate due to uncertainties around such complicated huge project to consider the probable uncertainty. There are not objectified method which are able to cope with uncertainty of project, and feasibility study based on selected financial analysis does not include liquidity of cash flow. Through such a stochastic method, developer can cope with cash flow fluctuation and set up a financial plan. Also this study is meaningful for laying the foundation for high-rise development project and feasibility study as well as the suitability and accuracy of feasibility study. Analysis showed that NPV and IRR include residential apartments shows surplus revenue as return of apartments offset deficit of hotel and office. Factors influencing the project feasibility for high-rise development project are sales account of $1^{st}$ year and annual vacancy rate of office.

A Feasibility Study on Cold Energy Business using LNG (액화천연가스를 이용한 냉열사업의 타당성 연구)

  • Kim, Ho-Yeon;Lee, Yong-Won;Ha, Jong-Mann
    • 한국가스학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.251-256
    • /
    • 2006
  • LNG 냉열 활용에 대한 관심은 유가의 고공행진과 더불어 고조되고 있다. 본 연구는 생산기지 내에서 LNG 냉열의 이용현황 및 활용 가능량에 대한 분석을 토대로 LNG를 사용하는 6대 냉열사업에 대한 타당성 연구를 수행하였다 하절기 생산기지 내에서 냉열의 활용 가능량은 전체 냉열량의 30%로 LNG kg당 약 60kcal 정도로 매우 적다. 또한 생산기지 내에서 천연가스 송출량이 시간대별로 크게 차이가 발생되기 때문에 실질적으로 활용 가능한 양은 이것보다 적은 것으로 나타났다. 6대 냉열사업은 공기액화분리, 냉열발전, 저온분쇄, 액화탄산 및 드라이아이스, 냉동 및 냉장창고, 지역냉방사업이고, 사업화 가능성에 대한 타당성 연구를 수행하였다. 본 결과 전체 냉열사업의 투자비 회수기간이 15년 이상 상회하는 것으로 나타났다. 현시점에서 냉열사업 자체의 외국기술 의존도 때문에 막대한 초기투자비가 필요하고, 생산품의 부가가치가 낮으며 기존 시장에서 경쟁력을 확보하기가 어려운 것으로 평가되었다.

  • PDF

Economic Feasibility Analysis of the Metropolitan Area Green Heat Project (수도권 그린히트 프로젝트의 경제적 타당성 분석)

  • Kim, Sang-Kee;Kim, Lae Hyun;Yoo, Seung-Hoon
    • Journal of Energy Engineering
    • /
    • v.24 no.1
    • /
    • pp.32-41
    • /
    • 2015
  • The Metropolitan Area Green Heat Project (MAGHP), which collects unused heat gathered from power plants, steel works, landfills in western Metropolitan area and distribute it to integrated energy business (IEB) companies, is proposed for the purpose of enhancing energy efficiency and providing low-price heat for IEB companies. Therefore, in order to decide on whether to initiate the MAGHP, the economic feasibility analysis of the project is widely demanded. This paper attempts to consider and measure four economic benefits: heat supply benefit, production cost reduction benefit, greenhouse gas mitigation benefit, and air quality improvement benefit. In addition, the paper tries to conduct the economic feasibility analysis. The project requires three-year investment and thirty-year operation. Three important findings emerge from the analysis. First, its net present value is computed to be 1,269 billion won and more than zero. Second, its benefit/cost ratio is calculated to be 1.72 and bigger than 1.0. Third, its internal rate of return is estimated to be 24.26% and larger than the social rate of return, 5.5%. In conclusion, the MAGHP is socially profitable and should be conducted immediately.

A study on Applying Hyperbolic Social Discount Rate onto the Benefit-Cost Analysis: Focused on Appropriate Analytical Time Span (쌍곡선함수 방식의 사회적할인율 적용에 대한 연구: 적정 분석기간의 설정을 중심으로)

  • Kim, Sang Kyum
    • Environmental and Resource Economics Review
    • /
    • v.24 no.1
    • /
    • pp.85-107
    • /
    • 2015
  • This study analyzes the effect of applying hyperbolic social discount rate onto the results of benefit-cost analysis of environmental public investment projects in Korea. In order to check the application possibility to the actual feasibility study, the discount factors generated by hyperbolic function, rather than traditional exponential one, would be applied to the benefit and cost data from the pre-feasibility studies which peformed for environmental public investment projects. The results of this study shows that using hyperbolic social discount rate is effective for enhancing test results, only under the condition of which the full expansion of the time periods of analysis is satisfied. According to the simulation results of this study, to achieve higher benefit/cost ratio by using hyperbolic social discount rate, the period should be increased up to 120 to 150 years at least.