Estimation of Project Duration by Probabilistic Linkage Evaluation Technique (PLET) (확률적 연결관계 평가기법(PLET)에 의한 사업공기 추정)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.44-52
    • /
    • 2014
  • Generally, the most difficult works at scheduling are to estimate the duration of activities and linkages between them because the possibility that the duration and linkages could be exposed to the uncertainties is so high. When estimating a project duration, therefore, the probabilistic estimation of the duration as well as the probabilistic estimation of the linkages between activities should be considered concurrently. The PERT that is one of the most popular techniques applied for the probabilistic estimation of a project duration can not consider the uncertainties of the linkages because it only estimates the probabilistic duration limited to 'FS0' relationship. The purpose of this study is to propose the new method "PLET" for stochastically estimating the project duration based on the probabilistic estimation of the BDM's relationships, and also provide more wide and various probabilsitic information about the project duration by it.

A Study on the EVMS for successful application to KHP program (한국형 헬기 시제품 개발을 위한 EVMS 적용방안에 관한 연구)

  • We, Oh-Gie;Chung, Ho-Su
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.1
    • /
    • pp.73-89
    • /
    • 2006
  • In this paper, EVMS procedure for KHP program is presented. Research and development of a defense system as a long lead program has a high probability of cost growth due to the uncertainty and risk. Therefore, meeting schedule, technical performance and preventing excessive cost overrun are the main concerning point to successful research and development program. EVMS(Earned Value Management System) is a program management system using earned value to control cost, schedule and technical performance. In order to control cost and schedule and to meet technical performance requirements of the KHP research and development program, it is necessary for us to adapt EVMS to the program.

Flood Risk Analysis of Waterfront in Nakdong River Basin based on Field Survey of Flood Vulnerable Area (홍수취약구간 현장조사 기반의 낙동강 유역내 친수공간 홍수위험도 분석)

  • Kim, Tae Hyung;Kim, Keuk Soo;Kim, Sam Eun;Kwak, Jae Won;Choi, Kyu Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.254-254
    • /
    • 2016
  • 최근 4대강 살리기 사업에 의한 하천 준설과 보의 건설은 낙동강에서의 평수기와 홍수기의 수위차를 상당히 감소시켰으며 이로 인한 친수 목적으로 활용할 수 있는 공원, 캠핑장, 하상도로, 주차장 등 고수부지 공간이 다양하게 조성되면서 대국민적인 여가활동을 창출하고 있다. 이러한 하천구역 내에 조성된 친수공간은 하천 홍수로 인한 피해 위험도 또한 함께 증가함에 따라 정확한 홍수정보의 제공과 신속한 홍수예보의 발령은 증가된 홍수위험도에 대처하기 위한 필수적인 요소가 된다. 현재 홍수예보는 홍수예보지점인 수위관측소를 기준으로 발령하고 있어 실제 홍수에 취약한 구간에 대한 홍수정보를 제공하기에 어려운 것이 현실이다. 모든 홍수취약지점에서 수위관측을 통해 위험상황을 실시간으로 모니터링 하는 것이 홍수 피해에 대비하고 대응하기 위한 가장 확실한 방법이나, 예산과 인력의 문제 등으로 인해 현실적인 한계점이 존재할 수 밖에 없다. 따라서 기존의 정보를 이용하여 홍수에 신속하게 대응하기 위해, 각 친수공간이 홍수예보지점 또는 수위관측소 지점과 어떠한 연관성을 갖는지 조사할 필요가 있다. 본 연구에서는 낙동강 유역의 취약구간에 대한 현장조사를 통해 조사구간에 대한 DB를 구축함으로써 홍수 발생시 하천변 취약구간에 효과적으로 홍수정보를 제공할 수 있는 기초자료를 확보하고자 하였다. 또한 확보된 홍수취약지구의 기초정보를 이용하여 각 친수지구가 가지는 홍수위험도를 분석하였다. 이를 위해 수위관측소 기반의 홍수취약구간 선정 기준을 정립하고, 기준에 의해 선정된 18개 수위관측소와 관련한 취약구간에 대해 현장조사를 실시하였으며, 이를 바탕으로 홍수취약구간 관리대장을 작성하였다. 연구 결과를 통해 주요 친수시설의 고도 및 좌표를 기반으로 하는 홍수위험도를 제시하였고, 이를 수위와 연계하여 홍수 발생 가능성을 제시할 수 있는 객관적인 근거를 확보할 수 있었다. 향후 이 자료는 낙동강 홍수예보에 있어 취약구간에 대한 각 수위별 지점현황과 각 지점의 홍수위험도 분석을 위한 기초자료로 활용될 수 있을 것으로 판단된다.

  • PDF

Evaluation of the design return period and risk assessment for local rivers in Chungcheongnam-do considering climate change (기후변화를 고려한 지방하천 설계빈도 및 위험도 평가 : 충청남도를 중심으로)

  • Ryu, Jae Hee;Lee, Jin-Young;Kim, Ji Eun;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.35-35
    • /
    • 2021
  • 최근 우리나라는 기후변화로 인한 이상기후 현상으로 호우 및 홍수 등에 의한 수재해를 예방하기 위한 설계빈도 적용방안 개발이 필요하다. 과거 지방하천의 일률적인 설계빈도의 적용 및 간접·주관적인 하천의 중요도와 지역특성에 대한 등급의 결정은 하천사업의 효율적 관리와 수행에 있어서 저해요소로 작용되어 왔다. 또한, 미래 기후변화 시나리오에 따라 하천의 중요도 및 계획 규모가 적절히 적용되어야 한다. 본 연구는 충청남도의 492개 지방하천에 대하여 유역특성(유역면적, 형상계수), 하천특성(하도경사, 수계 및 하천차수, 배수영향 구간), 이상강우 특성(이상강우 발생빈도, 시가화 침수면적)에 대한 현재 설계빈도에 대한 적절성을 평가하였다. 설계빈도에 대한 정량적 추정은 베이즈 이론을 활용하여 가중치를 산정한 후 최적분포형을 선정하였다. 최적분포형의 중앙값을 일반적인 지방하천의 설계빈도인 80년 빈도로 설정하고 상·하위 0.5%가 각각 100년, 50년 빈도로 가정하여 492개 지방하천을 평가하였다. 이상강우의 발생빈도와 시가화 침수면적에 따라 하천의 설계빈도가 높게 산정되는 것으로 분석되었다. 미래 기후변화 시나리오를 적용할 경우 현재 설계빈도(설계수명)에 대한 시나리오별 미래 재현기간을 산정하여 미래 설계빈도에 대한 위험도를 평가하였다. 13개 기후변화 시나리오의 대표농도경로 4.5와 8.5를 분석한 결과, 평균 3.2%, 12.8%의 위험도가 증가하는 것으로 분석되었다. 본 연구결과는 객관적인 지방하천의 적정 설계빈도 결정방안을 제시하였으며, 미래 계획홍수량 증가로 인하여 효율적인 토지이용이 제한될 것으로 예상됨에 따라 하천사업의 예산절감 및 우선순위 결정 등에 활용 가능할 것으로 판단된다.

  • PDF

Establishing Risk Management Process for Improved Business Value of a Multi-Purpose Building Project (복합 시설 프로젝트의 사업 가치 향상을 위한 리스크 관리 프로세스 구축 방안)

  • Lee, Jong-Sik;Cho, Seung-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.64-71
    • /
    • 2018
  • Project Management Institute of America separates the types of risk with external risks and internal risks. The external risk is an uncontrollable risk in projects such as changes of policy and related systems, climate, natural disasters, exchange rates and so on. The internal risk is an existing risk in the project itself that is controllable items in the project. Technical risks in project management are cost, quality, time, safety and environment. Therefore, both the external and internal risks should be managed to perform the construction project successfully. In particular, we can secure the quality and safety of facilities through the technical risk management. The importance of potential risk management has been emerging as a major interest and the lack of risk management delays projects and increases construction costs with negative effects of the building safety since the complex building, which is composed of a great number of facilities, consists of many project units and there are conflicts between various participants and stake-holders. This study presents the ways of establishing risk management processes to ensure the safety of the complex building. To that end, establishing procedure of risk management processes is presented and types of risk and factors in construction projects and counter strategies are presented as available risk information on the stages.

A Study on Digitization and Figuration Analysis of the Underground Mine Cavity Using MIRECO EYE System (MIRECO EYE 시스템을 활용한 광산 지하공동의 수치화 및 형상화 분석 연구)

  • Kim, Soo Lo;Park, Jay Hyun;Yang, In Jae
    • Tunnel and Underground Space
    • /
    • v.28 no.5
    • /
    • pp.387-399
    • /
    • 2018
  • Mine reclamation project is closely related to human's past mining activities and the current human's living environment. It is a reason for the national management. In order to efficiently carry out mine reclamation projects, a precise investigation and analysis of the underground space of the abandoned mine is required. Korea MINE RECLAMATION Corp. is developing a practical technology that is effective in investigating and actually measuring underground cavities. MIRECO EYE system is an exploration equipment for 3D digitization and figuration of underground cavities. As combining a laser, sonar and image acquisition technology, it enables access to information about inaccessible underground cavities and effective management of subsidence risk of mined area. and currently it is also utilized for various purposes in related areas such as investigating urban sinkholes. This article is precise numerical and geometric information analysis obtained through MIRECO EYE system.

Healthy Japan 21 objectives and strategies (일본건강증진 사업의 목표 및 추진전략: Healthy Japan 21)

  • Hoshi, Tanji
    • Proceedings of The Korean Society of Health Promotion Conference
    • /
    • 2005.09a
    • /
    • pp.55-88
    • /
    • 2005
  • Healthy Japan 21의 목적은 삶의 질을 향상시킴은 물론 노동가능 인구집단의 유병률을 줄이고 건강수명을 연장시키기 위하여, 21세기 모든 일본인들이 더욱 건강하고 행복한 삶을 향유할 수 있도록 국가사업을 활성화하는 것이다. 구체적 목적은 조기사망을 예방하고 건강생활을 향상하는 것으로, Healthy Japan 21의 전략적 기획과정에서 건강수명의 연장을 실현하기 위하여 2010년까지 달성되어야 하는 구체적인 목적들이 또한 제시되었다. 조기사망을 감소시키기 위하여 사고, 암, 자살, 심장병 감소의 중요성을 인식하고 9개의 주요 목표로 영양, 신체활동, 휴식과 이완, 금연, 절주, 구강보건, 당뇨병 예방, 심혈관계질환 예방, 암 예방을 설정하였다. 흡연, 알콜, 식사 그리고 운동과 같은 생활양식은 스트레스, 비만, 고혈압과 같은 위험요인 및 질병관리와 관련이 있으며, 위험요인은 암, 심장병, 구강질환의 발생과 밀접한 관련을 갖는다. 따라서 질병의 발생을 예방하기 위해서는 건강증진과 일차예방이 강조되어야 한다. 일차예방에 중점을 두기 위해서 우리는 전통적인 질병관리의 중점사항인 정기적인 건강검진을 통해 질병 조기발견을 노력을 게을리 하지 말아야 할 것이다. 아울러 의료비 감소, 병상에 있는 사람들의 감소, 사회세의 감소도 또한 달성되어야 하는 사업의 결과로 설정되어 있다. 가장 최근의 Healthy Japan 2000(1998-99)의 평가에 따르면 목표들의 15%가 달성되었거나 초과 달성된 것으로 나타났다. 이 중 아동과 청소년의 사망률의 경우, 1-14세 아동의 사망률은 1987년부터 26%가 감소되어 2000년도 목표인 인구 100,000명단 28명의 사망을 초과 달성한 것으로 평가되었다. Healthy Japan 21의 두 가지 주요 전략은 일반 인구집단을 위한 전략과 고위험 집단을 대상으로 하는 전략으로 구성된다. 개인의 건강한 생활양식으로의 변화를 포함한 우리의 건강증진 노력은 사람 중심으로 개인의 선택을 기반으로 하고 있다. 이러한 노력을 지원하기 위하여, 각 개인이 정보를 갖은 상태에서 올바른 선택을 할 수 있도록 적당량의 올바른 정보를 제공하는 것이 필수적이다. 이와 같은 일본의 건강증진계획은 2000년 3월에 Healthy Japan 21이 설립되었으며, 2000-2002년 사이 모든 현이 자신의 사업계획을 설정하였으며, 2001-2005년에는 약 반수 정도의 지방자치단체들이 자신들의 사업계획을 확정하였다. 건강증진을 이루는 중요한 수단은 파트너 쉽에 있다. 정부조직 뿐 아니라 건강보험회사, 보건의료서비스 제공자, 교육단체, 대중매체, 사기업, 봉사단체 등을 포함한 건강분야의 조직들은 자신들의 전문적 기술들을 한데 모아 서로 협력하여야 한다. 또 하나의 중요한 수단은 건강 지지적인 환경이다. 개인의 건강증진 노력을 체계화함으로써 지지적인 환경을 조성할 수 있다. Healthy Japan 21에 대한 평가는 2005년에 중간평가가, 2010에 최종평가가 있을 예정이다. 평가결과들은 이후에 진행될 사업의 향상을 위한 기준으로 활용될 예정이다.

  • PDF

The Effective Risk Management of Academic Entrepreneurs' R&D Technology Transfer (학술적 기업가의 R&D 성과이전 위험의 효과적 관리)

  • Kim, Jai-Myung
    • Korean Business Review
    • /
    • v.16
    • /
    • pp.123-144
    • /
    • 2003
  • The transfer of R&D performance is the technology transfer in a narrow sense. This study aimed at fanning the effective managerial systems of the transfer of the academic entrepreneur's R&D performance. For this purpose, this study analysed the characteristics and success factors of R&D performance transfer based on the theory of project life cycle. This research classified the life cycle of academic entrepreneurs' R&D projects into six stages. And the risks associated with the transfer process was categorized using the case study about the establishing processes the mineral-related small finns. Especially, the risk of the technology transfer was investigated by the R&D project implementation stages. Based on this results, this paper suggested the strategic system such as the marketing-oriented thinking, the clear-cut statement of the role among the stake-holders of the R&D and commercialization processes, the dynamic system of the academic entrepreneurs' leadership, the formation of the transfer management system, and the usage of project risk management techniques.

  • PDF

The Comparison Study of Reprocessing and Direct Disposal of Nuclear Spent Fuel (사용후 핵연료의 재처리와 직접 처분의 비교$\cdot$연구)

  • 강성구;송종순
    • Nuclear industry
    • /
    • v.19 no.6 s.196
    • /
    • pp.56-60
    • /
    • 1999
  • 원자력 정책에서 안전성과 운영 실적 환경$\cdot$보전$\cdot$경제성 등은 매우 중요한 인자이다. 핵주기의 선택은 에너지 정책, 연료의 다양성, 공급의 안정과 관련된 모든 사회적$\cdot$환경적 영향에 있어 매우 중요하다. 특히 원전의 고준위 방사성 폐기물인 사용후 핵연료 관리는 높은 방사선 준위뿐만 아니라 장기적인 관리 기간이 소요되는 어려운 사업이다. 본 연구는 사용후 핵연료 관리 방안인 재처리와 직접 처분의 비용 분석, 안전성, 대국민용인 측면을 살펴보았다. 직접 처분이 재처리에 비해 약 $7{\%}$ 정도의 경제성이 있고, 직접 처분의 사용후 핵연료는 재처리 폐기물보다 높은 위험도를 갖는다. 대국민 용인 측면서는 두가지 처리 방법 모두 받아들여지지 않는다. 결론적으로, 사용후 핵연료 관리는 모든 사회 $\cdot$환경적 영향과 경제성을 고려한 핵주기 정책과 병행하여 지속적인 기술 개발을 통한 안전성 확보가 필요하다.

  • PDF

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.