• Title/Summary/Keyword: 사업성과관리

Search Result 1,103, Processing Time 0.023 seconds

Development of Project Success Index for Construction Projects (건설사업 성공지수 개발에 관한 연구)

  • Gang, Ji-Sun;Kim, Ki-Kook;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.427-430
    • /
    • 2006
  • Recently, it is necessary that construction industry should be into high value-added business lines using the measurement system because construction projects are increasing their complexity, variety and scale. But Performance measurement Systems that are most used around the world are subject to limitations for application on internal construction industry. This study addresses limitations of measurement system that is existing and proposes methodology for development of efficient Success Index system based on Critical Success Factors.

  • PDF

Assessment of River Discharge Survey Project in 2009 (2009년 유량조사사업 평가)

  • Kwon, Dong-Seok;Lee, Shin-Jae;Oh, Chang-Ryeol;Hwang, Seok-Hwan;Jung, Sung-Won;Lee, Jae-Hyung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1184-1190
    • /
    • 2010
  • 유량조사는 하천의 임의 한 단면에 흐르는 물의 양을 측정하는 것으로서 하천유역의 물순환 구조 파악, 하천시설의 설치, 각종 수공 구조물의 설계, 하천 주변지역의 이용 및 관리 등을 목적으로 실시하고 있다. 이에 따라 유량조사사업단은 전국 수위관측소 지점을 대상으로 유량측정을 실시하고 측정된 성과에 대한 체계적인 품질관리와 연구개발을 통한 유량자료의 안정화를 위하여 매년 100여개 지점에서 유량조사사업을 실시하고 있다. 본 연구에서는 2009년도 유량측정성과에 대한 평가기준으로 각 성과별 구간유량비와 불확실도를 선정하였으며, 이와 같은 항목은 측정 중 배치된 측선수에 절대적인 영향을 받게 된다. 그 결과 2009년 유량측정성과의 측선수 평균은 2003년도 대비 유속계 및 부자의 경우 각각 3.7배, 2.2배 증가한 35.1개, 13.8개로 나타났다. 측선수 증가를 통해 최대구간유량비는 유속계 및 부자 각각 30.0%, 51.2% 감소한 7.1%, 14.6%로 나타났으며, 불확실도의 경우 45.1%, 62.4% 감소하여 4.6%, 8.8%의 개선된 값을 보였다. 이러한 양질의 측정성과를 이용해 개발된 수위-유량관계곡선식과 환산유량에 대한 유출률을 검토한 결과, 조석 및 배수 영향을 받는 지점과 계기수위 자료에 문제가 발생한 지점을 제외한 지점에 대한 유출률 분포는 2003년 최대 300%까지 나타났던 유출률이 일반적인 하천에서 나타날 수 있는 유출률 50~90% 비율도 계속 증가하고 있는 것으로 나타났다. 2009년 강수량은 평년 수준을 보였으나, 지역적 시기적 편차 등으로 인해 낙동강 권역의 경우 50% 미만의 유출률을 보인 지점이 다수 나타났다. 이러한 성과는 전문 인력에 의한 유량측정 및 유량성과에 대한 품질관리시스템의 운영을 통해 비교적 양질의 유량자료를 확보할 수 있었으며 이에 근거하여 개발된 수위-유량관계곡선식과 환산된 유량자료는 과거에 비하여 신뢰성이 개선된 것으로 평가되었다. 일련의 체계적인 운영 및 검증을 통해 2009년 유량조사사업은 성공적인 수준으로 판단되며, 추후 지속적인 연구개발을 통해 유량자료의 품질수준을 한 단계 높일 수 있을 것으로 기대된다.

  • PDF

Development of Diffusion Statistics for Demand Side Management (전력수요관리사업 보급실적 통계 개발)

  • Shin, Dong-Joon;Kim, Chang-Soo;Park, Jong-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.200-202
    • /
    • 2008
  • 본 논문에서는 국내에서 시행중인 전력수요관리사업의 현황을 분석하고 수요관리사업의 보급실적 통계를 구축하는 필요성과 구축 결과를 정리하였다. 일반적인 전력분야 통계와 구분되는 수요관리 분야 통계의 특성을 분석하였으며, 이러한 특성을 효율적으로 반영할 수 있는 수요관리보급통계 지표를 개발하였다. 또한 본연구를 통해 개발한 수요관리보급 통계집은 수요관리평가 웹페이지를 통해 보급하여 사용자의 편의성을 도모하였다.

  • PDF

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.

A Study on Project Management System (프로젝트 관리 시스템에 관한 연구)

  • Park, Koo-Rack
    • Journal of Digital Convergence
    • /
    • v.13 no.1
    • /
    • pp.305-311
    • /
    • 2015
  • Nowadays, because IT market expansion and complexity has been progressing and competition has intensified, there is a growth of information system building industries having difficulty through traditional business management methods. A survey was conducted among site personnel (Project Manager PM and Project Participants) to generate an institutional framework to efficiently manage this and project management process support. Through this, the importance of element technology and fragility of software development project management must be understood and an improvement of the element technology must be generated. By using this, a very relevant result that presented a logical basis was obtained in the decision making of the importance of project management and the role of overall project manager and core project management fields.

Factors Affecting the Performance of National Human Resource Development Projects: Focusing Energy HRD Projects (국가 인력양성사업 성과에 영향을 미치는 요인 분석: 에너지인력양성사업을 대상으로)

  • Hong, Seong-Min;Son, Kyoung-Hyun;Chang, Sun-Mi
    • Journal of Technology Innovation
    • /
    • v.25 no.4
    • /
    • pp.263-284
    • /
    • 2017
  • The purpose of this research is to analyze the performance of national R&D projects and to find out measures to improve the performance indicators, focusing on energy HRD projects. The main analysis target is 86 energy manpower projects supported since 2010. The performance indicators of the energy HRD projects are related to the research capacity, the number of emission workers, industry-university linkage, job creation and so on, and analyzed by using the 11 indicators of human resource performance index called KPI index. As a result of analyzing the attainment level of the proposed target by task, the index with the highest achievement level is the corporation linkage rate, and the index with the lowest achievement level is the participating company employment. As a result of examining the effects of job creation in company - linked activities, it was found that the greater the number of participating companies in the business, the greater the employment creation effect of the number of internships. As a result of the above analysis, the following policy alternatives are proposed. First, it is necessary to consider adding indicators that can express the quality performance of the business and performance indicators that can express actual business linkages. Second, it is necessary to strengthen the management of differentiated performance indicators according to policy performance targets and major target groups. Third, it is necessary to improve information input and accumulation system along with improvement of performance index.

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF

PBS제도와 과제의 기술적 특성이 출연(연) 연구성과에 미치는 영향 - PBS사업과 기관고유사업의 논문성과 비교분석 -

  • Jang, Ho-Won;Go, Min-Gu;Jo, Yun-Ju;Jeong, Jae-Yeon
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2012.05a
    • /
    • pp.30-44
    • /
    • 2012
  • 지난 96년 PBS제도가 시행되면서, 많은 연구에서 PBS제도의 문제점을 제시해 왔다. 선행 연구에서는 인건비 확보를 위한 과도한 경쟁으로 연구활동의 안정성 저하 및 불안감 조성, 기관 내 외 연구자간의 경쟁구도 심화로 상호협력을 통한 융합연구의 어려움, 관리 운영체계의 제약요인으로 인한 제도 확산은 정부출연연구기관의 성과를 저하시킨다고 지적하였다. 하지만 PBS제도 도입당시의 기대효과였던 기관의 자율성 강화, 연구책임자 책임성 강화, 사업관리의 투명성 강화는 정부출연연구기관의 성과를 높이는 효과를 가져올 수 있다. 따라서 본 연구에서는 PBS제도 도입 후 15년이 경과한 현재 PBS제도가 출연연구기관의 연구과제 수행 성과에 어떠한 영향을 미치는지에 대한 실증분석을 하였다. 기초기술연구회 소속 13개 기관을 대상으로 질적 논문성과를 분석해본 결과, 기관이 수행한 과제의 PBS제도는 논문성과에 영향을 미치지 않는 것으로 나타났다. 하지만 수행 과제의 기술적 특성을 기술분야별, 기술단계별로 나눠보았을 경우, 기술단계별 구분에서 기초기술연구회 소속 정부출연연구기관의 논문성과는 기초기술 단계의 과제를 수행하였을 경우 높은 질적 논문성과를 보여주는 것으로 나타났다.

  • PDF

A Study on the Development and Application of Composite Index for ICT Program (정보통신표준화종합지수 개발 및 적용사례)

  • Eun, An-Jeong;Min, Yoon-Jong;Woo, Hoon-Shik
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2011.06c
    • /
    • pp.92-95
    • /
    • 2011
  • 최근 선진국을 중심으로 국가R&D사업에 있어서 사업의 연구성과 측정 및 관리가 주요 이슈가 되고 있다. 특히 표준과 특허는 국가R&D사업의 연구성과를 경제적 성과로 전환할 수 있는 중요한 요인으로 작용하고 있다. 따라서 본 논문은 정보통신표준화정책 및 국가R&SD정책에 따라 추진되고 표준 및 특허 창출에 초점을 두고 진행되고 있는 정보통신표준화사업의 사업 추진결과와 추세를 파악하고, 사업의 투자 효율성을 종합적이고 체계적으로 분석하기 위한 정보통신표준화종합지수를 개발하였다. 정보통신표준화종합지수는 사업의 효율적 정보제공을 통해 정보통신표준화사업의 효과적 체계구축을 가능하게 하여 정보통신표준화사업의 발전을 촉진시키고, 궁극적으로는 국가 정보통신표준화 역량 향상에 기여할 것으로 기대한다.

An Analysis of the Status of National Research and Development Projects in Records Management (기록관리 분야 국가연구개발사업 현황 분석)

  • Hoemyeong Jeong;Soonhee Kim
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.23 no.4
    • /
    • pp.137-157
    • /
    • 2023
  • The scale of research and development (R&D) investment is increasing to strengthen national competitiveness through technological innovation, leading to an increased interest in investment efficiency. In records management, the National Archives of Korea has been leading the national research and development project since 2008. Accordingly, this study analyzed R&D projects in records management regarding implementing organization, performance or outcomes, and subjects, targeting 111 National Archives of Korea contract research projects from 2008 to 2022. The analysis showed that small and medium-sized enterprises (SMEs) were the most likely to conduct research, the majority of the research outcomes were academic publications, and there were some discrepancies between the reported performance in research and the actual performance. In terms of research subjects, the most common type of records are paper or print documents, establishing an electronic management system among the National Archives' works. In terms of the frequency of keywords in the records management process and research projects, it was found that research was mainly conducted on "preservation." Meanwhile, only 10 cases, or 9% of the 111 projects, were found to be relevant in terms of utilizing big data and developing intelligent technologies related to digital transformation. Therefore, the effectiveness of the R&D project must be improved through follow-up management of the results even after the research project is completed. In addition, in terms of research topics, it was identified that aside from "preservation," studies focusing on "transfer," "classification," "evaluation," and "collection," as well as research that responds to digital transformation, are needed.