• Title/Summary/Keyword: 사업관리절차

Search Result 340, Processing Time 0.03 seconds

A Study on Adopting an Ex Post Facto Management System and Reforming the Maritime Traffic Safety Audit Scheme (해상교통안전진단 사후관리제도의 도입 및 제도개선에 관한 고찰)

  • Kim, Inchul
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.7
    • /
    • pp.807-813
    • /
    • 2016
  • The Maritime Traffic Safety Audit Scheme was institutionalized in 2009 to provide for professional surveys, measurement and the evaluation of navigational hazards that might occur in coastal waters in the course of marine work. Related researches that dealt with the reform of the Maritime Traffic Safety Audit Scheme found that there were no rules or regulations for verifying whether marine work conformed to audit results and reviewing the exactitude of ship handling simulations which were a crucial part of the scheme. According to the necessity of adopting an ex post facto management system in the field of maritime traffic, this study analyzed the similar audit acts such as the Natural Environment Impact Audit Scheme and the Road Traffic Safety Audit Scheme, and proposed specific articles for revising Maritime Safety Act in order to break out from the institutional inertia of the current Maritime Traffic Safety Audit Scheme. It is expected that a newly proposed legal system for verifying the performance of audit results and the exactitude of audits will help improve maritime traffic safety by eradicating potentially hidden hazards related to marine work.

Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects (공공 건축사업의 공사기간 산정 현황 분석을 통한 개선방안)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.12-20
    • /
    • 2021
  • In order to secure construction quality and safety and prevent cost disputes, the importance of calculating 'the appropriate construction period' has recently emerged. It is necessary to analyze a considerable amount of historical data to establish the standard for calculating the construction period. However, many experts are raising questions about the use of past data due to changes in the construction business environment, such as shortening working hours, reinforcing quality regulations, and changing climate conditions. In addition, the possibility of errors increases when calculating a uniform construction period using historical statistics because the work order and productivity are very diverse according to construction conditions. Therefore, through this study, a new solution to change from the method of analyzing past data to the method of reviewing current production data through an active 'transformation of thoughts' was proposed through this study. In other words, the process of reviewing and calculating 'the appropriate construction period' was institutionalized by introducing 'process management experts' and 'construction experts by type of construction' in the design stage.

Improvement for Technology Readiness Assessment with Weighting Method for Defense Acquisition Project (가중치 산출방법을 활용한 획득방안 분석단계의 기술성숙도평가 개선방안)

  • Kim, Mi-Seon;Noh, Eun-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.538-544
    • /
    • 2021
  • Technology readiness assessment is a procedure for managing defense project risk factors based on the preemptive identification of technical risks. Under current regulations, technology readiness is determined based on considerations of the ratings of factors itemized on a checklist, whether unsatisfied factors have a fatal impact on the project, and whether countermeasures for unsatisfied factors have been established. However, objective criteria for assessing the impact of unsatisfied factors have not been presented, and thus, at present, the results of technology readiness level determinations are largely subjective. In addition, the importance of questions on the checklist is dependent on individual project characteristics and this is not considered during the assessment process. In this paper, we propose an improved technology readiness assessment procedure that considers the characteristics of each project. Using the proposed procedure, we quantitatively determined the importance of each checklist item using a weighting method. We found the devised procedure improved the reliability and objectivity of technology readiness assessment results. A case analysis of a complex weapons system is presented to demonstrate these improvements.

A Project Delivery System Selection Model for Large Public Construction Projects (대형 공공공사의 적정 발주방식 선정모델)

  • Hyun Chang-Taek;Seo Yong-Chil;Lee In-Keun;Ryu Kil-Sang;Lee Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.71-80
    • /
    • 2000
  • Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

  • PDF

VRIO Model Based Enterprise Capability Assessment Framework for Plant Project (VRIO 모델 기반의 기업역량평가 프레임워크 제시에 관한 연구 - 플랜트 사업을 중심으로 -)

  • Min, Byeong Su;Min, Jang Hee;Jang, Woosik;Han, Seung-Heon;Kang, Sin Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.61-70
    • /
    • 2016
  • Construction enterprises have performed various projects such as buildings, infrastructure and plant projects in the international market. Among these, the plant project's amount of orders accounted for about 68.9% of all. However, because of the enterprises won a contract with a low-budget for plant project in the last 10 years, the profit has dropped dramatically. And it is forecasted that there are extreme competition for bid award of plant projects because of the current falling oil prices and raising interest rates. In this circumstance, the comprehending of enterprises strength and weakness must be a priority to get a sustainable competitive advantage. Therefore this research suggests the enterprises's capability assessment framework and it is in order to diagnose the korean construction enterprises capabilities. The framework is based on the VRIO model that is on the basis of resource based theory. First, the capability assessment indices and their importance and priority that based on the life-cycle of plant project is deducted by literature review and survey. Second, the 5 point likert score applied VRIO survey is conducted to diagnose the enterprises and quantified the survey result using the fuzzy theory. Lastly, the competitvie implication and capability assessment are deducted.

Analysis of Factors of IRRs and Spread on Korea's BTO Projects (우리나라 민간투자사업의 수익률과 가산금리의 결정요인 분석)

  • Ju, Jae-Hong;Ha, Heon-Gu;Park, Dong-Gyu
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.2
    • /
    • pp.135-150
    • /
    • 2010
  • This paper focuses on finding out which covenants are different among the concession agreements of Korean BTO projects and how these influenced IRR(Internal Rate of Return). That is, to figure out the political and economical determinants of IRR by analyzing the concession agreements which are the basic contract of implementing projects. As IRR is an index of profitability, so spread is an indicator of risk to collect debts. That's the reason why the analysis of spread is included. For the empirical analysis, the data of concession agreements for 75 projects and financial models are used. These 75 concession agreements are contracted from 1995 to 2008. The dependent variables are after tax nominal IRR and the spread of long term interest rates of 75 BTO projects. The independent variables are project's proceeding factors, the feasibility variables, the variables related to financial character and the variables related to covenants or the government's policy. The analysis shows that IRR has been influenced by the equity level of financial investors, the national government managed projects, the projects with minimum revenue guarantee (MRG), etc. And the equity level of financial investors, the national government managed projects and the implementation of supplementary project have an effect on spread also.

Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.

A Study on the Definition of the Educational Facility Maintenance (교육시설물 유지관리 업무규명에 관한 연구)

  • Shon Woo-Kyung;Kim Jang-Young;Han Choong-Hee;Kim Sun-kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.567-570
    • /
    • 2002
  • our country school construction from 1990 year middle the facility expension for the improvement or education environment and the maintenance expense of various conservative construction for old education facilities is increasing. It accomplishes the each subject wild for business which maintains the training facility enterprise to be, the minute paragraph of information and deficient standard of information. It brings about the duplication investment a waste of the revenue source which is limited. Occurrence information which it follows consequently in business process and requirement must clear. We the maintenance phase of the education facilities understand, problem point and obstacle VIP analysis it leads it presents it does analyze. The improvement process model which leads a hereafter function for obstacle VIP extraction and information model construction must be accomplished.

  • PDF

Risk Management Process through a Phase of $Economic{\cdot}Financial$ Feasibility Study (경제적${\cdot}$재무적 타당성분석 단계에서의 리스크 관리절차 연구)

  • Park Young-Min;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.454-459
    • /
    • 2003
  • Feasibility study on large scale projects like an investment on infrastructure development is very important because it provides fundamental data which determine the total investment size and duration. However, previous feasibility studies have a few problems of ambiguous estimation standards, unsystematical estimation methods, and so on. Accordingly, this study intends to regulate tile problems on economic feasibility as well as financial feasibility study which have been considered more critical in recent time, subsequently presents a reform measure. Also, this study identifies predictable risks during the feasibility study, presents a scheme which lets investor and owner control the risk themselves through a process which uses theoretical and political management plans.

  • PDF

Improvement of the Evaluation Method for VE Alternatives using the Risk Assessment Process (리스크 평가절차 도입을 통한 VE 대안 평가방법 개선)

  • Park, Jin-Ho;Jin, Zheng-xun;Hyun, Chang-taek;Kim, Hyun-joo;Kwon, Suk-hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.32-42
    • /
    • 2018
  • Since the success or failure of VE projects depends on the capabilities of participants, including owners, construction managers, architects, general contractors and VE experts, it is important to follow systematic procedures. However, it is often the case that only a rough evaluation is performed, or the rough and detailed evaluations are integrated in actual VE tasks. In this case, it is difficult to analyze and evaluate the alternatives in terms of risk, even for the important alternatives. This in turn leads to the so-called returning alternatives where the alternatives proposed in the preceding stage are returned to the original plans in the following stage, and thus the repetitive work for the alternatives often decreases the efficiency of the VE task. In this regard, this study proposed a risk assessment process for VE alternatives in order to minimize the occurrence of returning alternatives based on the systematic analysis and evaluation of VE alternatives. It will increase the efficiency of VE tasks by reduces the number of regression alternatives.