• Title/Summary/Keyword: 빌딩모델정보

Search Result 89, Processing Time 0.027 seconds

Development of Spatial Landslide Information System and Application of Spatial Landslide Information (산사태 공간 정보시스템 개발 및 산사태 공간 정보의 활용)

  • 이사로;김윤종;민경덕
    • Spatial Information Research
    • /
    • v.8 no.1
    • /
    • pp.141-153
    • /
    • 2000
  • The purpose of this study is to develop and apply spatial landslide information system using Geographic information system (GIS) in concerned with spatial data. Landslide locations detected from interpretation of aerial photo and field survey, and topographic , soil , forest , and geological maps of the study area, Yongin were collected and constructed into spatial database using GIS. As landslide occurrence factors, slope, aspect and curvature of topography were calculated from the topographic database. Texture, material, drainage and effective thickness of soil were extracted from the soil database, and type, age, diameter and density of wood were extracted from the forest database. Lithology was extracted from the geological database, and land use was classified from the Landsat TM satellite image. In addition, landslide damageable objects such as building, road, rail and other facility were extracted from the topographic database. Landslide susceptibility was analyzed using the landslide occurrence factors by probability, logistic regression and neural network methods. The spatial landslide information system was developed to retrieve the constructed GIS database and landslide susceptibility . The system was developed using Arc View script language(Avenue), and consisted of pull-down and icon menus for easy use. Also, the constructed database can be retrieved through Internet World Wide Web (WWW) using Internet GIS technology.

  • PDF

Visualization of Structural Shape Information based on Octree using Terrestrial Laser Scanning (3D레이저스캐닝을 이용한 옥트리기반 구조물 형상정보 가시화)

  • Cha, Gichun;Lee, Donghwan;Park, Seunghee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.8-16
    • /
    • 2016
  • This study presents the visualization of shape information based on Octree using 3D laser scanning. The process of visualization was established to construct the Octree structure from the 3D scan data. The scan data was converted to a 2D surface through the mesh technique and the surface was then converted to a 3D object through the Raster/Vector transformation. The 3D object was transmitted to the Octree Root Node and The shape information was constructed by the recursive partitioning of the Octree Root Node. The test-bed was selected as the steel bridge structure in Sungkyunkwan University. The shape information based on Octree was condensed into 89.3%. In addition, the Octree compressibility was confirmed to compare the shape information of the office building, a computer science campus in Germany and a New College in USA. The basis is created by the visualization of shape information for double-deck tunnel and it will be expected to improve the efficiency of structural health monitoring and maintenance.

Advanced Sensor-based Building Information Modeling (BIM) for Construction, Operation, and Maintenance Phases of the Project Lifecycle (시공 및 유지관리 단계에서 활용 가능한 단센서 기반의 BIM 구축을 위한 기초연구)

  • Cho, Minwoo;Son, Hyojoo;Kim, Changmin;Lee, Joohyuk;Kim, Changwan
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.7-17
    • /
    • 2012
  • In recent years, building information modeling (BIM) has been an important issue within the architect, engineering, and construction (AEC) industry. BIM provides a way to share and exchange semantically rich information about the buildings in order to achieve a successful level of collaboration, communication, and interaction between stakeholders throughout the life cycle of the project. However, despite the recognition of its potential, BIM has not yet been utilized in the construction, operation, and maintenance stages because of the need to reorganize the BIM by reflecting the as-built status of the buildings. In order to improve and increase the use of BIM at all phases of a project, several research efforts are exploring the creation of an as-built BIM that is based on advanced sensors. However, there is a lack of literature and investigation on this research area to date within the domestic AEC industry. The aim of this study is to suggest ways in which BIM can be utilized within the construction, operation, and maintenance stages based on advanced sensors so that it is an approach that might be usefully carried forward. This paper begins by presenting a review of the existing BIM research and achievement in order to determine the limitations of the use of BIM in the domestic AEC industry. Conclusively, this paper suggests a direction for the future applications of BIM and describes how it can benefit from additional research.

A Study on the Prediction of the Construction Cost in Planning Stage of Local Housing Union Project (지역주택조합사업 기획단계의 공사비 예측에 관한 연구)

  • Lee, Jin-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.653-659
    • /
    • 2018
  • The accurate prediction of construction cost is a key factor in a project's success. However, it is hard to predict the construction costs in the planning stages rapidly and precisely when drawings, specifications, construction cost calculation statements are incomplete, among other factors. Accurate construction-cost prediction in the planning stage of a project is also important for project feasibility studies and successful completion. Therefore, various techniques have been applied to accurately predict construction costs at an early stage when project information is limited. There are many factors that affect the construction cost prediction. This paper presents a construction-cost prediction method as multiple regression model with seven construction factors as independent variables. The method was used to predict the construction cost of a local housing union project, and the error rate was 4.87%. It is not possible to compare the cost of the project at the planning stage of the local housing union project, but it has high prediction accuracy compared to the unit price of an existing unit area. It is likely to be applied in construction-cost calculation work and to contribute to the establishment of the budget for the local housing union project.

Numerical Analysis of Wind Environment around Sungnyemun Gate Using a Computational Fluid Dynamics Model (전산유체역학 모델을 이용한 숭례문 주변의 풍환경 수치해석)

  • Son, Minu;Kim, Do-Yong
    • Journal of Conservation Science
    • /
    • v.37 no.3
    • /
    • pp.209-219
    • /
    • 2021
  • In this study, the wind environment in an urban area near Sungneymun gate was numerically investigated in the cases of inflow directions. The wind fields for the target area were simulated using Geographic Information System data and Computational Fluid Dynamics model. Results, including vector fields, three-dimensional wind velocity components, and wind speeds, were analyzed to examine flow characteristics. Wind direction variability affected by buildings was shown in the target area. The complex flows around Sungneymun did not depend on the inflow direction as a boundary condition. The wind speed around Sungneymun was generally 3 times stronger at 14 m above ground level (AGL) compared to the surface wind at 2 m AGL and relatively high in the case of easterly inflow. The effect of wind was also analyzed to be relatively significant at the southeast side of Sungneymun. Thus, it was suggested that the assessment of wind environment affected by high-rise and high-density buildings should be necessary for the architectural heritage in urban areas.

Performance Analysis of BIM Labor using Case Analysis (사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석)

  • Kim, Hyoung-Jin;Yoo, Moo-Young;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

서초프로젝트A 오피스텔 현장의 SHOP DWG

  • Kim, Hyeon-Ung
    • 월간 기계설비
    • /
    • no.11 s.184
    • /
    • pp.57-71
    • /
    • 2005
  • SHOP DWG의 현주소 어디까지 왔는가? 설계에서 제조에 이르는 전 과정을 컴퓨터로 제어하고 관리하는 기술. 캐드(CAD)와 캠(CAM)은 각각 computer-aided design,computer-aided manufacturing의 약칭으로 컴퓨터보조설계와 컴퓨터보조생산을 뜻한다. CAD는 설계도면을 한 장씩 수작업으로 제도하지 않고 설계 데이터베이스의 정보를 CRT(cathode ray tube)에서 화상을 보고 합성하면서 설계하므로 작업을 최적화 할 수 있다. CAD로 설계된 설계도의 내용은 CAM을 통해 NC(수치제어)공작기계에 정확한 작업동작을 지시하게 되며, 작업관리∙가공∙조립∙검사 등의 제조과정을 컴퓨터로 관리하여 작업속도와 제품의 정밀성을 높이게 된다. 최근에는 건축현장의 2D system이 보편화되어 있지만 건축현장의 핵심이라고 할 수 있는 기계설비의 기계실, 또는 조립화 공법 등에는 3차원 CAD∙CAM시스템이 개발되어 입체형상을 화면에 3차원으로 재현할 수 있고, 대상물의 표면적∙부피∙무게∙강도 등의 물리적 성질도 자동 계산하여 최적상태에서 현장의 시공에 적용할 수 있게 되었다. 1960년대 초 미국에서 자동차 모델∙엔진, 항공기 부품 등 의 설계에 수작업의 한계를 느껴 개발되었으며, 한국에서는 70년대 중반에 도입되어 운용되고 있다. 이에 따라 프로그램 회사들은 다양한 방법 등을 SHOP DWG에 적용하여 판매경쟁이 치열하다. (주)우진아이엔에스는 급속한 산업경제의 변화와 무한경쟁시대에 보다 나은 기술개발 투자에도 노력을 기울여, 2000년 11월 용인공장, 생산라인을 천안으로 이전, 확장 하여 배관 및 닥트의 CAD-CAM SYSTEM, P.F.P공법, 기계실3D, 블럭화배관, 닥트자동화 시스템, 설계, 용접공정을 공장화시켰으며, 신 개발품인 S.C.D(SEMI-CON DUCT)를 신설하여 모든 건축물에 맞는 필수적인 제품을 생산함으로써 선택의 폭을 넓히고, 현장 시공능력 효율을 높이고 있다. 이번 호에서는 (주)우진아이엔에스가 95년 설계팀을 발족하여 제로시스템의 3D공법을 공장 및 현장의 SHOP DWG에 적용해왔고 최근에는“서초 프로젝트A”현장에 SHOP DWG의 최대 결집체인 3D활용의 조립화 공법을 적용하여 초고층 오피스텔현장을 시공한 사례를 게재한다. 우진아이엔에스는 30여년의 기술 축척을 바탕으로 최고의 기술력과 풍부한 경험을 통해 아셈무역센타, 타워팰리스1차, 3차 및 목동트라팰리스, 분당트리폴리스, 수원삼성전자 R4, 등 국내굴지의 초고층빌딩 시공을 근거로 초고층의 기본설계를 이해하고 SHOP DWG을 통해서 기계설비공사의 향후 나아갈 지표를 제시하고 있다.

  • PDF

A study on influencing factors and revitalization of the adoption of off-site construction - Case study on the construction market of the United Kingdom - (현장외 시공 공법 채택의 영향 인자 및 활성화 방안 연구 - 영국 건설 시장 사례 연구 -)

  • Kim, Min-Koo;Brilakis, Ioannis;An, Yun-Kyu
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.33-40
    • /
    • 2015
  • Over a few decades, off-site construction (OSC) has been widely used for building and bridge constructions. OSC is a construction method that build structures at a different location than the location of use, and normally it occurs in a manufacturing plant. There are many studies on the perceived benefits of OSC, yet relatively few studies which quantitatively assess the benefits and factors affecting the decision of the use of OSC have been investigated. This study investigates the influencing factors of the use of OSC system and its revitalization solutions in the construction industry. As the research method, interview and questionnaire survey are conducted by visiting industry experts of OSC and sending a questionnaire to the OSC stakeholders including engineers, manufacturers, contractors and clients in the United Kingdom (UK). The construction industry of the UK is targeted for the study since it has a number of commons with the Korean construction industry in terms of the structure of the construction industry and current low take-up of the OSC. The survey provides the results that the reluctance of clients to use OSC is the key factor of the slow use of OSC despite of the perceived benefits of OSC. In addition, in order to revitalize OSC in the construction market, three revival recommendations are suggested based on the survey results.

A Proposal of the Usage Metering Functions on Cloud Computing-Based Building Information Modeling (BIM) and the Law for the Open BIM Ecosystem (열린 BIM 생태계 조성을 위한 클라우드 컴퓨팅 기반 BIM 서비스 환경의 사용량 측정 기술 및 법 규정 제안)

  • Kim, Byungkon;Kim, Jongsung
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.49-56
    • /
    • 2016
  • As project opportunities for the Architecture, Engineering and Construction (AEC) industry have grown more complex and larger, the utilization of Building Information Modeling (BIM) technologies for three-dimensional (3D) design and simulation practices has been increasing significantly; the typical applications of the BIM technologies include clash detection and design alternative based on 3D planning, which have been expanded over to the technology of construction management in the AEC industry for virtual design and construction. As for now, commercial BIM software has been operated under a single-user environment, which is why initial costs for its introduction are very high. Cloud computing, one of the most promising next-generation Internet technologies, enables simple Internet devices to use services and resources provided with BIM software. Recently in Korea, studies to link between BIM and cloud computing technologies have been directed toward saving costs to build BIM-related infrastructure, and providing various BIM services for small- and medium-sized enterprises (SMEs). This study addressed development of the usage metering functions of BIM software under cloud computing architecture in order to archive and use BIM data and create an optimal revenue structure so that the BIM services may grow spontaneously, considering a demand for cloud resources. For the reason, we surveyed relevant cases, and then analyzed needs and requirements from AEC industry. Based on the relevant cases, customizing for cloud BIM and design for the development was performed. We also surveyed any related-law to support cloud computing-based BIM service. Finally, we proposed herein how to optimally design and develop the usage metering functions of cloud BIM software.

A Study on the Effects of a Virtual-Users Model Computing the Semantics of Spaces for the Operation and Understanding of Human Behavior Simulation of Architecture-Major Students (공간의 의미를 연산하는 가상 사용자 모델이 건축설계 전공학생들의 인간행동 시뮬레이션 운용과 이해도에 미치는 효과에 관한 연구)

  • Hong, Seung-Wan
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.34-41
    • /
    • 2016
  • The previous studies argue that using the semantic properties of BIM objects is efficient for simulating the behaviors of autonomous, computer agents, called virtual-users, but such assumption is not proven via evidence-based research approaches. Hence, this present study aims to investigate the empirical effects of a human behavior simulation model equipped the semantics of spaces on the architecture-major students' operation and understanding of the simulation system, compared to a typical path-finding model. To achieve the aim, this study analyzed the survey and interview data, collected in the authentic design projects. The analysis indicates that (1) using a simulation model equipped the semantics of spaces helps the students' operation of the simulation, and (2) it also aids understanding the relationship between the variables of spaces and virtual-users (${\alpha}=0.74$). In addition, the qualitative data inform that the advantages of the simulation model that computes the semantics of spaces stem in the automatic behavioral changes of massive numbers of virtual-users, and efficient detection and activation on the what-if situations. The analysis also reveals that the simulation model has shortcomings in orchestrating the complex data structure between the semantics properties of spaces and virtual-users under multi-sequential scenarios. The results of this study contribute to develop a future design system combining BIM with human behavior simulation.