Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2015.07a
/
pp.169-170
/
2015
최근 컨테이너 터미널에서는 환적화물의 증가로 터미널내의 이적작업이 증가함에 따라 효율적인 이적작업 계획을 수립하고자 노력하고 있다. 본 연구는 블록내에서 다수의 야드 크레인이 운영되고 있는 경우에 주어진 시간내에 각 크레인 별 최적 이적작업 계획을 수립하는 문제에 대한 혼합정수법을 이용한 최적 수리모형을 제시하였다. 또한 실제 터미널에서 빠른 시간 안에 이적작업계획을 수립할 수 있는 발견적 기법을 제시하고 다양한 수치예제 실험을 통하여 유용성을 검증하였다.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
v.29
no.1
/
pp.413-421
/
2005
Intra-block remarshalling is the task of rearranging into some target bays those containers which are scattered within around the block. If multiple transfer cranes installed in the block are all used together we may be able to complete the remarshalling task as early as possible. However, when multiple cranes are used simultaneously, there may occur significant delays if we do not carefully consider interferences between the cranes at the time of scheduling. Especially, delays caused by interferences occur more frequently in case of using non-crossing cranes. This paper presents an efficient heuristics method for assigning moves of containers to each crane and for determining an appropriate container moving order in a manner sensitive to the interferences. Simulation experiments have shown that the proposed method can effectively reduce delays in various environments.
Oh Myung-Seob;Kang Jaeho;Ryu Kwang Ryel;Kim Kap Hwan
Journal of Navigation and Port Research
/
v.29
no.5
s.101
/
pp.447-455
/
2005
Intra-block remarshalling is the task of rearranging into some target bays those containers which are scattered within around the block. If multiple transfer cranes installed in the block are all used together we may be able to complete the remarshalling task as early as possible. However, when multiple cranes are used simultaneously, there may occur significant delays if we do not carefully consider interferences between the cranes at the time of scheduling. Especially, delays caused by interferences occur more frequently in case of using non-crossing cranes. This paper presents an efficient heuristic method for assigning moves of containers to each crane and for determining an appropriate container moving order in a manner sensitive to the interferences. Simulation experiments have shown that the proposed method can effectively reduce delays in various environments.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2015.07a
/
pp.173-174
/
2015
컨테이너 터미널에서 이적작업은 적하작업과 반출작업을 신속하게 처리하기 위해 장치장에 흩어져 있는 컨테이너들을 재배치하는 것이다. 본 연구는 수직 배치형 장치장 블록 내에서 컨테이너 재배치 작업계획 문제를 다룬다. 재배치 작업계획은 대상 컨테이너, 옮겨질 위치 그리고 재배치 작업 순서를 정하는 것이다. 본 연구는 재배치 작업시간, 반출작업, 적하작업의 가중시간 비용을 최소화하면서 재배치 작업동안 공간 가용성이 만족되도록 장치위치와 작업순서를 함께 결정하는 혼합정수계획모형을 개발하였다.
Kang Jaeho;Oh Myung-Seob;Ryu Kwang Ryel;Kim Kap Hwan
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2004.11a
/
pp.273-280
/
2004
Intra-block remarshalling is the task of rearranging into some target bays those containers whim are scattered around the block, so that the containers can be loaded onto the ship ffficiently. Howeuer, if we rearrange the containers without considering the container larding sequence, too mud! rehandling work will be required at the time rf larding to fetch the right containers whim are stacked under the wrong ones. Therefore, the remarshalling should be done by moving the relevant containers in an appropriate order. This paper presents an efficient heuristic search technique for finding an appropriate container moving order during remarshalling to avoid rehandling at the time of larding. Simulation experiments have shown that the proposed method can generate rehandling-free solutions in a real time.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2012.06a
/
pp.237-239
/
2012
이적작업은 자동화 컨테이너 터미널에서 하역작업의 생산성을 높이는 중요한 운영 전략 중의 하나이다. 이는 장치장 크레인의 이동시간과 재작업을 줄이기 위해 장치장 블록 내 컨테이너들의 재배치하는 작업을 의미한다. 이적작업은 주로 크레인의 유휴시간에 수행되며 장치장 크레인의 추가적인 하역 작업을 요구한다. 이적작업계획이 수립된 후 작업할당 문제가 다루어진다. 크레인 작업할당 문제는 작업가능시간에 대한 제약을 고려하여 이적작업의 효과를 최대화시키기 위해 장치장 크레인이 처리할 이적작업을 선정하고 이들의 작업순서를 정하는 것이다. 본 연구는 혼합정수계획법을 이용하여 장치장 크레인의 작업할당 문제를 모형화 하고 실효적인 이용을 위해 수치실험을 통해 여러 작업할당 규칙의 수행도를 비교분석하였다.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2004.11a
/
pp.203-208
/
2004
The objective of this study is to analyze the efficiency of marshalling work using ATC(automated transfer crane) for ACT(automated container terminal). It is important fact to assignment of containers, because the character of ACT which block layout is vertical for berth and there are four other works which are inbound, oubound, loading and unloading in one block. And then there is need which assignment of containers with remarshaling work using ATCs in one block. Therefore, we analyze the efficiency of remarshaling work using simulation and suggest the assignment methodology of containers in yard
Remarshalling operation is one of the operations considered important in an automated container terminal to perform quickly loading operations and delivery operations. It arranges the containers scattered at a verticla yard block in order to reduce the transfer time and the rehandling time of ATC(Automated Transfer Crane)s. This paper deals with the remarshalling planning problem minimizing the weighted operation time. This problem can be decomposed into 2 subproblems, storage space assignment problem and operation sequencing problem Storage space assignment problem decides to where containers are transported in terms of transportation time cost.. With results of a previous subproblem, operation sequence problem determines the ATC operation sequence, which minimizes the dead-heading of ATC This study formulates each subproblem with mixed integer program and dynamic program. To illustrate the proposed model, we propose an instance to explain the process of remarshalling planning.
Kang Jaeho;Oh Myung-Seob;Ryu Kwang Ryel;Kim Kap Hwan
Journal of Navigation and Port Research
/
v.29
no.1
s.97
/
pp.83-90
/
2005
Intra-block remarshalling is the task of rearranging into some target bays those containers which are scattered around within the block, so that the containers can be loaded onto the ship efficiently. However, if we rearrange the containers without considering the container loading sequence, excessive rehandling work will be required at the time of loading because the containers to be fetched are often stacked under other containers. Therefore, the remarshalling should be done by moving the relevant containers in an appropriate order. This paper presents an efficient heuristic search technique for finding an appropriate container moving order during remarshalling to avoid rehandling at the time of loading. Simulation experiments have shown that the proposed method can generate rehandling-free solutions in real time.
Recently, container terminal operators have made efforts to develop an efficient remarshalling plan in response to the increase in automation of equipment handling and transport of containers in the terminals. Usually, containers are handled by multiple AYCs(automated yard cranes) in-yard in an automated container terminal, and terminal operators establish a remarshalling plan using slack time to increase the efficiency of ship operation. This study develops the optimal mathematical model through mixed integer programming as a solution to the problem of dispatching multiple AYCs. Considering the difficulty of direct application to the field due to computation time, we analyze the five prototypical dispatching rules for real world adaptation. A numerical experiment found that the maximum weight ratio (MR) rule and the maximum weight (MW) rule are the ideal dispatching solutions to the multiple AYCs dispatching problem.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.