• Title/Summary/Keyword: 분리 시공

Search Result 203, Processing Time 0.017 seconds

Studies on Effects of Channel Bed Fixation by Erosion Control Dams in Torrential Streams (황폐계류(荒廢溪流)에 있어서 사방시설물(砂防施設物)에 의한 하도고정(河道固定)에 관한 연구(硏究))

  • Chun, Kun Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.79 no.3
    • /
    • pp.269-277
    • /
    • 1990
  • In planning the disaster prevention by the erosion control facilities, it is essential to focus on the microtopography of the channel bed and the chronological process of sedimental movement in the torrential streams. For this purpose, the microtopographical change of the channel bed and the effects of the erosion control facilities in the mountain torrents were analyzed by the experimental channel and the field survey of the torrents where low-dam series had been constructed in the channel. The results of this experiment showed that the effects of construction of the low-dam series on the channel bed fixiation were the prevention of the local scouring in the experimental channel and the expansion of flow channel width and deposit space. The results are summarized as follows : 1. When the low-dam series were constructed over the whole channel bed (L'/L=1), the conning water and the sediment were seperated, simultaneously resulting in deposition of sediment and reduction of the tractive force for the running water. Therefore, the F.A. (Fluctuation area in cross-section: value was decreased to about 65% compared with that of non-work (L'/L=0). 2. The efficiencies of the low-dam series on the channel width were increased with an increment in length of working space. After the construction of low-dam series on the whole channel bed (L'/L=1), flow channel width was increased to about 1.53 times compared with that of non-work (L'/L=0). 3. It needs a deposition area to store the sediment with decrease in tractive force. The low-dam series in the experimental channel widened the deposition area about 2.10 times compared with that of non-work.

  • PDF

Derivation of rock parameters from Televiewer data (텔레뷰어에 의한 토목설계 매개변수의 산출)

  • Kim Jung-Yul;Kim Yoo-Sung
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.137-155
    • /
    • 1999
  • Recently, Televiewer(Borehole Acoustic Scanner(Televiewer)) has come to be widely used specially for the general engineering construction design. The Televiewer tool using a focussed acoustic beam is to detect the amplitude and traveltime of each reflected acoustic signal at the wall, resulting in the amplitude- and traveltime image respectively. Fractures can be well detected, because they easily scatter the acoustic energy due to the highly narrow beam. In addition, the drilling work will rough the borehole wall so that the acoustic energy can be scattered simply due to the roughness of the wall. Thus, the amplitude level can be directed associated with the elastic properties(impedance) and the hardness of the rock as well. Meanwhile, the traveltime image provides an information about the borehole shape and can be converted to a high precision 3D caliper log(max. 288 arms). In this paper, based on the high resolution of Televiewer images, general evaluation methods are illustrated to derive very reliable rock parameters.

  • PDF

A Study on the Ordering Status of Traditional Landscape Design Service in Cultural Heritage (문화재의 전통조경설계용역 발주실태 연구)

  • Kim, Min-Seon;Kim, Choong-Sik;Lee, Jae-Yong
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.39 no.3
    • /
    • pp.33-41
    • /
    • 2021
  • This study identified the scale that traditional landscape design has taken up by analyzing a total of 1037 services for design of cultural heritage that had been ordered by the government agencies from 2018 to 2020, and has drawn characteristics of traditional landscape design focusing on major cases. The results are as follows. First, the number of order cases for traditional landscape design has shown differences annually in the services of design of cultural heritage, but the design amount has been found to have the similar average annually, which confirmed that the same level has been maintained each year. It was found that the number of cases of traditional landscape design requiring responsibilities or participations of landscape engineers for 3 years in the entire design had a high proportion of approximately 26%. Second, the traditional landscape design has required professional knowledge and experiences of landscape engineers that could not be replaced by the business operator for design of cultural heritage consisting of architects. The expertise has been shown differently depending on types of construction. First, the topographical design for the work to build a foundation has required understanding of ground shapes and its elevations and professional knowledge on calculation of the amount of the earth work and the remains maintenance technique etc. The plantation design has required basic knowledge on growth characteristics of trees and the environment for growth and understanding of the vegetation landscape of the past. Meanwhile, the design for traditional pavement and traditional landscape structures and facilities has required the expertise on traditional materials that are different from the modern ones and their processing and construction methods. The understanding of changes to water paths and ecosystem, the principles of fluids, and characteristics of each type of fluid was essential for the design for the ecological landscape work including the maintenance of a water system such as rivers etc. As such, the traditional landscape design has a scale accounting for approximately one fourth of the entire cultural heritage design and requires the expertise differentiated from other fields. This improves the provisions of the current law on limiting the actual design, suggesting the need for the establishment of a traditional landscape design company so that all traditional landscape designs can be carried out by landscape engineers.