• Title/Summary/Keyword: 부지효과

Search Result 219, Processing Time 0.027 seconds

Comparison of Removal Efficiencies in Single and Duplex Ventilation Constructed Wetland Systems for Treating Domestic Sewage (단일 통풍형과 이중 통풍형 인공습지시스템의 하수처리 효율 비교)

  • Seo, Dong-Cheol;Lim, Seok-Cheon;Jo, In-Seong;Lee, Byeong-Ju;Lee, Hong-Jae;Kim, Sang-Don;Lee, Jun-Bae;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.28 no.3
    • /
    • pp.258-265
    • /
    • 2009
  • To develop environmentally friendly constructed wetlands(CWs) for treating domestic sewage which was produced in farming and fishing village, the efficiency of water treatment at different ventilation systems in the vertical bed, depths of horizontal bed, and sewage loads was investigated. In the vertical bed, BOD and COD by duplex ventilation system were lower than those by single ventilation system. But T-N and T-P concentrations by both ventilation systems in the vertical bed were little different. In the horizontal bed, BOD, COD, T-N and T-P in 1.0 m and 1.3 m depths were little different. To reduce the CWs' area and to improve the pollutant removal efficiencies, the optimum depth of horizontal bed was 1.3 m. In single and duplex ventilation CWs, the removal rate of BOD, COD, SS, T-N and T-P decreased slightly with the sewage load increases. In same sewage load conditions, the removal rates of BOD, COD, SS, T-N and T-P by duplex ventilation CWs were higher than those by single ventilation CWs. In summary, to effectively treat domestic sewage from farming and fishing village, the optimum constructed wetlands would be the duplex ventilation CWs.

Surfactant Enhanced In-Situ Soil Flushing Pilot Test for the Soil and Groundwater Remediation in an Oil Contaminated Site (계면활성제 원위치 토양 세정법을 이용한 유류 오염 지역 토양.지하수 정화 실증 시험)

  • 이민희;정상용;최상일;강동환;김민철
    • Journal of Soil and Groundwater Environment
    • /
    • v.7 no.4
    • /
    • pp.77-86
    • /
    • 2002
  • Surfactant enhanced in-situ soil flushing was performed to remediate the soil and groundwater at an oil contaminated site, where had been used as a military vehicle repair area for 40 years. A section from the contaminated site (4.5 m $\times$ 4.5 m $\times$ 6.0 m) was selected for the research, which was composed of heterogeneous sandy and silt-sandy soils with average $K_d$ of 2.0$\times$$10^{-4}$cm/sec. Two percent of sorbitan monooleate (POE 20) and 0.07% of iso-prophyl alcohol were mixed for the surfactant solution and 3 pore volumes of surfactant solution were injected to remove oil from the contaminated section. Four injection wells and two extraction wells were built in the section to flush surfactant solution. Water samples taken from extraction wells and the storage tank were analyzed on a gas-chromatography (GC) for TPH concentration in the effluent with different time. Five pore volumes of solution were extracted while TPH concentration in soil and groundwater at the section were below the Waste Water Discharge Limit (WWDL). The effluent TPH concentration from wells with only water flushing was below 10 ppm. However, the effluent concentration using surfactant solution flushing increased to 1751 ppm, which was more than 170 times compared with the concentration with only water flushing. Total 18.5 kg of oil (TPH) was removed from the soil and groundwater at the section. The concentration of heavy metals in the effluent solution also increased with the increase of TPH concentration, suggesting that the surfactant enhanced in-situ flushing be available to remove not only oil but heavy metals from contaminated sites. The removal efficiency of surfactant enhanced in-situ flushing was investigated at the real contaminated site in Korea. Results suggest that in-situ soil flushing could be a successful process to remediate contaminated sites distributed in Korea.

Study on the Combination of In-situ Chemical Oxidation Method by using Hydrogen Peroxide with the Air-sparging Method for Diesel Contaminated Soil and Groundwater (과산화수소를 이용한 현장원위치 화학적 산화법과 공기분사법(Air-sparging)을 연계한 디젤 오염 토양/지하수 동시 정화 실내 실험 연구)

  • Kim, Nam-Ho;Kim, In-Su;Choi, Ae-Jung;Lee, Min-Hee
    • Journal of Soil and Groundwater Environment
    • /
    • v.11 no.6
    • /
    • pp.8-17
    • /
    • 2006
  • Laboratory scale experiments were performed to investigate the removal efficiency of the in-situ chemical oxidation method and the air-sparging method for diesel contaminated soil and groundwater. Two kinds of diesel contaminated soils (TPH concentration : 2,401 mg/kg and 9,551 mg/kg) and groundwater sampled at Busan railroad station were used for the experiments. For batch experiments of chemical oxidation by using 50% hydrogen peroxide solution, TPH concentration of soil decreased to 18% and 15% of initial TPH concentration. For continuous column experiments, more than 70% of initial TPH in soil was removed by using soil flushing with 20% hydrogen peroxide solution, suggesting that most of diesel in soil reacted with hydrogen peroxide and degraded into $CO_2$ or $H_2O$ gases. Batch experiment for the air-sparging method with artificially contaminated groundwater (TPH concentration : 810 mg/L) was performed to evaluate the removal efficiency of the air-sparging method and TPH concentration of groundwater decreased to lower than 5 mg/L (waste water discharge tolerance limit) within 72 hours of air-sparging. For box experiment with diesel contaminated real soil and groundwater, the removal efficiency of air-sparging was very low because of the residual diesel phase existed in soil medium, suggesting that the air-sparging method should be applied to remediate groundwater after the free phase of diesel in soil medium was removed. For the last time, the in-situ box experiment for a unit process mixed the chemical oxidation process with the air-sparging process was performed to remove diesel from soil and groundwater at a time. Soil flushing with 20% hydrogen peroxide solution was applied to diesel contaminated soils in box, and subsequently contaminated groundwater was purified by the air-sparging method. With 23 L of 20% hydrogen peroxide solution and 2,160 L of air-sparging, TPH concentration of soil decreased from 9,551 mg/kg to 390 mg/kg and TPH concentration of groundwater reduced to lower than 5 mg/L. Results suggested that the combination process of the in-situ hydrogen peroxide flushing and the air-sparging has a great possibility to simultaneously remediate fuel contaminated soil and groundwater.

Evaluation of the Sealing Capacity of the Supercritical CO2 by the Measurement of Its Injection Pressure into the Tuff and the Mudstone in the Janggi Basin (초임계이산화탄소(scCO2) 주입압력 측정에 의한 장기분지 응회암과 이암의 scCO2 차폐능 평가)

  • An, Jeongpil;Lee, Minhee;Wang, Sookyun
    • Economic and Environmental Geology
    • /
    • v.50 no.4
    • /
    • pp.303-311
    • /
    • 2017
  • The laboratory scale experiment was performed to evaluate the sealing capacity of the capping rock such as tuff and mudstone, measuring the intial supercritical $CO_2$ ($scCO_2$) injection pressure and the $scCO_2$-water-rock reaction for 90 days. The drilling cores sampled from 800 m in depth around the Janggi basin, Korea were used for the experiment. The mineralogical changes of mudstone and tuff were measured to evaluate the geochemical stability during the $scCO_2$-water-rock reaction at $CO_2$ storage condition (100 bar and $50^{\circ}C$). The rock core was fixed in the high pressurized stainless steel cell and was saturated with distilled water at 100 bar of pore water pressure. The effluent of the cell was connected to the large tank filled with 3 L of water and 2 L of $scCO_2$ at 100 bar, simulating the subsurface injection condition. The $scCO_2$ injection pressure, which was higher than 100 bar, was controlled at the influent port of the cell until the $scCO_2$ begin to penetrate into the rock and the initial injection pressure (> 100 bar) of $scCO_2$ into the rock was measured for each rock. The mineralogical compositions of mudstones after 90 days reaction were similar to those before the reaction, suggesting that the mudstone in the Janggi basin has remained relatively stable for the $scCO_2$ involved geochemical reaction. The initial $scCO_2$ injection pressure (${\Delta}P$) of a tuff in the Janggi basin was 15 bar and the continuous $scCO_2$ injection into the tuff core occurred at higher than 20 bar of injection pressure. For the mudstone in the Janggi basin, the initial $scCO_2$ injection pressure was higher than 150 bar (10 times higher than that of the tuff). From the results, the mudstone in Janggi basin was more suitable than the tuff to shield the $scCO_2$ leakage from the reservoir rock at subsurface.

Changes of Growth and Flowering Characteristics in Rapeseed Cultivars with Different Sowing Date (파종시기에 따른 유채(Brassica napus L.) 품종별 생육 및 개화특성)

  • Lee, Tae Sung;Lee, Yong Hwa;Kim, Kwang Soo;Lee, Hoo Kwan;Jang, Young Seok;Choi, In Hu;Kim, Kwan Su
    • Korean Journal of Plant Resources
    • /
    • v.27 no.1
    • /
    • pp.80-88
    • /
    • 2014
  • This study was carried out to understand the effect of sowing date on growth characteristics, flower duration of a total of 6 domestic rapeseed cultivars, "Sunmang", "Tammiyuchae", "Tamlayuchae", "Naehanyuchae", "Yongsanyuchae" and "Hallayuchae" with different sowing dates (25 Sept., 5 Oct., 15 Oct., 25 Oct., 5 Nov.) in Muan, Jeollanamdo, Republic of Korea. The results obtained were summarized as the follows: The number of seedling stand after overwintering was decreased in all 6 cultivars. It changed little until 5 Oct., and then showed continuously largely decrease as the sowing date being delayed. As the sowing date was being delayed, plant height was decreased while Silique length and thousand seed weight were increased. Seed yield in all 6 cultivars decreased almost linearly with late sowing date. In correlation analysis between the delaying sowing date and growth characteristics, it was inversely correlated with plant height ($r=-0.769^{**}$), No. of branches/plant ($r=-0.760^{**}$), No. of siliqua/panicle ($r=-0.631^{**}$) and seed yield ($r=-0.946^{**}$), while showed a positive correlation with silique length (r=0.635), seed diameter ($r=0.629^{**}$) and thousand grain weight ($r=0.422^*$). No. of seeds/silique and seed set percentage were not significantly correlated with the delaying sowing date. The flower duration was long in order of Sunmang, Tammiyuchae, Yongsanyuchae, Naehanyuchae, Hallayuchae and Tamlayuchae. Varietal variation of flowering date was larger with early sowing date than with delaying sowing date. The range of flower duration across all cultivars was from 1 day of Tamlayuchae to 14 days of Sunmang according to the sowing date, and the end flowering date was able to be extended from 2 to 9 days, compared to normal date of end flowering.

A Study on the Improvement of Treatment Efficiency for Nitrogen and Phosphorus by Improved Sewage Treatment Process in Constructed Wetland by Natural Purification Method (자연정화공법에 의한 인공습지 하수처리장에서 하수처리 공정개선에 따른 질소 및 인의 처리효율 향상 방안)

  • Seo, Dong-Cheol;Park, Woo-Young;Lim, Jong-Sir;Park, Chan-Hoon;Lee, Hong-Jae;Kim, Hong-Chul;Lee, Sang-Won;Lee, Do-Jin;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.27 no.1
    • /
    • pp.27-34
    • /
    • 2008
  • To effectively treat the domestic sewage that was produced on a small-scale in farming and fishing village in order to encourage an ecologically friendly environment, a small-scale sewage treatment apparatus using natural purification methods that consisted of an aerobic and an anaerobic plots were constructed. The efficiency of sewage treatment according to the sewage loading was investigated to obtain the optimum sewage loading in small-scale sewage treatment apparatus. Removal rate of pollutants according to the sewage loading were in the order of $150\;Lm^{-2}day^{-1}{\fallingdotseq}300\;Lm^{-2}day^{-1}>600\;Lm^{-2}day^{-1}$. Therefore, the optimum sewage loading was 300 L m-2 day-1. Under the optimum sewage loading, removal rate of BOD, $COD_{Mn}$, turbidity, T-N and T-P were 99, 94, 99, 49 and 89%, respectively. However, to satisfy the water quality standard in effluent in small-sclae sewage treatment apparatus for domestic sewage treatment, the low removal efficiency of T-N and T-P must be improved. So to improve the removal rate of T-N and T-P, the efficiency of sewage treatment according to the improved sewage treatment process such as, re-treatment at aerobic plot, anaerobic condition of aerobic plot, changing the filter media sizes and the depths in anaerobic plot, and also addition of oyster shells to filter media at anaerobic plot were investigated. In case of 150 cm depth in anaerobic plot with filter medium A (effectivity particle size 1.50 mm) and addition of oyster shells to filter media at anaerobic plot, removal rate of T-N and T-P in both plots were increased by 10 and 3%, and 14 and 7% in comparison with 100 cm depth in anaerobic plot with filter medium B(effectivity particle size 0.95 mm), respectively. The optimum improved sewage treatment process in small-scale sewage treatment apparatus were 150 cm depth in anaerobic plot with filter medium A and addition of oyster shells to filter media at anaerobic plot.

Derivation of Green Infrastructure Planning Factors for Reducing Particulate Matter - Using Text Mining - (미세먼지 저감을 위한 그린인프라 계획요소 도출 - 텍스트 마이닝을 활용하여 -)

  • Seok, Youngsun;Song, Kihwan;Han, Hyojoo;Lee, Junga
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.5
    • /
    • pp.79-96
    • /
    • 2021
  • Green infrastructure planning represents landscape planning measures to reduce particulate matter. This study aimed to derive factors that may be used in planning green infrastructure for particulate matter reduction using text mining techniques. A range of analyses were carried out by focusing on keywords such as 'particulate matter reduction plan' and 'green infrastructure planning elements'. The analyses included Term Frequency-Inverse Document Frequency (TF-IDF) analysis, centrality analysis, related word analysis, and topic modeling analysis. These analyses were carried out via text mining by collecting information on previous related research, policy reports, and laws. Initially, TF-IDF analysis results were used to classify major keywords relating to particulate matter and green infrastructure into three groups: (1) environmental issues (e.g., particulate matter, environment, carbon, and atmosphere), target spaces (e.g., urban, park, and local green space), and application methods (e.g., analysis, planning, evaluation, development, ecological aspect, policy management, technology, and resilience). Second, the centrality analysis results were found to be similar to those of TF-IDF; it was confirmed that the central connectors to the major keywords were 'Green New Deal' and 'Vacant land'. The results from the analysis of related words verified that planning green infrastructure for particulate matter reduction required planning forests and ventilation corridors. Additionally, moisture must be considered for microclimate control. It was also confirmed that utilizing vacant space, establishing mixed forests, introducing particulate matter reduction technology, and understanding the system may be important for the effective planning of green infrastructure. Topic analysis was used to classify the planning elements of green infrastructure based on ecological, technological, and social functions. The planning elements of ecological function were classified into morphological (e.g., urban forest, green space, wall greening) and functional aspects (e.g., climate control, carbon storage and absorption, provision of habitats, and biodiversity for wildlife). The planning elements of technical function were classified into various themes, including the disaster prevention functions of green infrastructure, buffer effects, stormwater management, water purification, and energy reduction. The planning elements of the social function were classified into themes such as community function, improving the health of users, and scenery improvement. These results suggest that green infrastructure planning for particulate matter reduction requires approaches related to key concepts, such as resilience and sustainability. In particular, there is a need to apply green infrastructure planning elements in order to reduce exposure to particulate matter.

Importance-Satisfaction Analysis of Meditation Forest in Schools - Focusing on Middle Schools in Gwang-Ju City - (명상숲의 중요도-만족도 평가 - 광주광역시 중학교를 대상으로 -)

  • Kang, Taesun;Jeong, Moonsun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.4
    • /
    • pp.68-80
    • /
    • 2019
  • This study is to provide basic data for the user-oriented design for a middle school meditation forest in the future by analyzing the physical environment characteristics of existing middle school meditation forests, the users' utilization behavior, and the degree of the importance satisfaction. For this purpose, 24 evaluation indices based on site characteristics, naturalness, functionality, and the effectiveness of meditation forest sites were selected for analysis of importance satisfaction. We surveyed and analyzed the students and teachers of two middle schools 'A' and 'B' in Gwangju Metropolitan City. The results of this study are as follows. First, the perception and utilization rates of the meditation forests by students was significantly lower than teachers at both schools. 'A' school has a better use and recognition rate than the 'B' school. Second, the purposes of using meditation forests were rest (49.6%), weekday lunchtime (63.6%), with friends (65.0%) or colleagues (60%), and short (less than 10 minutes) rests (68.6%). They preferred flowers (30.0%) and shading plants (28.9%), mainly using shelters (57.9%) and walking trails (37.1%). Third, as a result of the importance of satisfaction analysis, the average score of the 24 items importance (3.81), higher than the satisfaction (3.62). The 24 items positioned in 4 quadrants are as follows: Nine items are in the I quadrant for 'persistent maintenance'. Three items are in the II quadrant for 'priority correction'. Seven items are in the quadrant III for 'low priority in the management and operation'. Five items are in the quadrant IV for 'avoid over effort'. For the comparison of two middle schools' satisfaction, 'A' school satisfaction was higher than 'B' school for 16 items, which showed a statistically significant difference. It is believed that the users in 'A' school are more satisfied than 'B' school because it has more forests and trails, better accessibility, and a variety of plant types and planting areas in the A school meditation forest. The results of the overall satisfaction analysis showed a significant difference between 'A' school (68.0%) and 'B' school (47.2%) as 'A' school has better shelters and trails. The rankings of the most satisfying space are walking trails (1st place) and shelters (2nd place). The reason for the highest satisfaction was for rest (stress relief and emotional support) in both 'A' and 'B' schools.

Factors influencing the axes of anterior teeth during SWA on masse sliding retraction with orthodontic mini-implant anchorage: a finite element study (교정용 미니 임플랜트 고정원과 SWA on masse sliding retraction 시 전치부 치축 조절 요인에 관한 유한요소해석)

  • Jeong, Hye-Sim;Moon, Yoon-Shik;Cho, Young-Soo;Lim, Seung-Min;Sung, Sang-Jin
    • The korean journal of orthodontics
    • /
    • v.36 no.5
    • /
    • pp.339-348
    • /
    • 2006
  • Objective: With development of the skeletal anchorage system, orthodontic mini-implant (OMI) assisted on masse sliding retraction has become part of general orthodontic treatment. But compared to the emphasis on successful anchorage preparation, the control of anterior teeth axis has not been emphasized enough. Methods: A 3-D finite element Base model of maxillary dental arch and a Lingual tipping model with lingually inclined anterior teeth were constructed. To evaluate factors influencing the axis of anterior teeth when OMI was used as anchorage, models were simulated with 2 mm or 5 mm retraction hooks and/or by the addition of 4 mm of compensating curve (CC) on the main archwire. The stress distribution on the roots and a 25000 times enlarged axis graph were evaluated. Results: Intrusive component of retraction force directed postero-superiorly from the 2 mm height hook did not reduce the lingual tipping of anterior teeth. When hook height was increased to 5 mm, lateral incisor showed crown-labial and root-lingual torque and uncontrolled tipping of the canine was increased.4 mm of CC added to the main archwire also induced crown-labial and root-lingual torque of the lateral incisor but uncontrolled tipping of the canine was decreased. Lingual tipping model showed very similar results compared with the Base model. Conclusion: The results of this study showed that height of the hook and compensating curve on the main archwire can influence the axis of anterior teeth. These data can be used as guidelines for clinical application.