Kim, Byungki;Kim, Sohee;Ryu, Kyungsang;Rho, Daeseok
Journal of the Korea Convergence Society
/
v.2
no.4
/
pp.29-37
/
2011
Dispersed generation (DG) such as wind power (WP) and Photovoltaic systems (PV) that has been promoted at the national level recently is mainly being introduced into distribution systems adjacent to consumers because it is generation on a small scale when compared to current generation. Due to its characteristics, DG can be operated by interconnection with distribution systems to present security of more stable power and efficient use of power facilities and resources. Problems on protection coordination of distribution systems by reverse flow of DG can roughly be divided into three possibilities: excess in rated breaking capacity (12.5KA) of protective devices by a fault in DG current supply, failure to operate protective devices by an apparent effect that can occur by reduction in impedance parallel circuit fault current due to interconnection of DG, and malfunction of protective devices by interconnection transformer connection type. The purpose of this study is to analyze problems in protection coordination that can occur when DG is operated by interconnection with distribution systems by conducting modeling and simulations by using theoretical symmetrical components and MATLAB/SIMULINK to present methods to improve such problems.
Journal of the Korea Academia-Industrial cooperation Society
/
v.12
no.5
/
pp.2279-2284
/
2011
In most of radial distribution systems, the overcurrent protection coordination is adopted for the protection of apparatus and the improvement of electrical power system reliability. The protection coordination structure in distribution substation is composed of several circuit breakers(CB) with distribution lines originating from one substation bus under one transformer, which trip for their fault current. But sufficient analysis is necessary for the capacity of CB's in distribution systems with several distribution generations(DG). In this paper, a protection coordination method not to exceed the traditional capacity of CB's was proposed and certified through simulation by the PSCAD-EMTDC S/W.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.5
/
pp.17-26
/
2018
If a photovoltaic (PV) system is installed in a primary feeder interconnected with the PV system, bi-directional power flow can occur, and then, the magnitude and direction of the fault current can change, depending on the fault location and point of common coupling (PCC) of the PV system, and the time current curve (TCC) cannot be properly coordinated between protection devices. Also, it is difficult to obtain a proper time interval for protection devices because the conventional setting approach is applied, even though the PV system is installed and operating. Therefore, this paper presents three operation modes considering the operational conditions of the PV system to obtain setting values for protection devices. Based on the mode, this paper proposes an algorithm to calculate the optimal protection coordination time interval according to the introduction capacity of the PV system. In addition, this paper performs modelling of a distribution system with the PV system and protection devices by using Off-DAS S/W, and analyzes the characteristics of the time interval between the protection devices, such as substation relays, reclosers, customer relays, and PV customer relays. The simulation results confirmed that the proposed operational modes and setting-value algorithms are useful and effective for protection coordination in a distribution system for a PV system.
Kim, So-Hee;Rho, Dae-Seok;Kim, Chan-Hyeok;Wang, Yong-Peel
Proceedings of the KAIS Fall Conference
/
2010.11a
/
pp.62-65
/
2010
분산전원의 연계가 활발해지면서 발생하게 되는 여러 가지 문제점을 해결하고 배전계통의 최적운용을 위해 다양한 기술계산이 필수적이다. 본 논문에서는 기술계산의 방법인 수 계산법의 복잡함과 한계를 극복하기 위하여, 빠르고 정확한 기술계산 및 검토기능을 수행할 수 있는 보호협조 평가시스템의 알고리즘을 제시하였다. 보호협조 및 선로의 안정화에 크게 기여할 수 있는 양방향 보호협조 평가시스템을 이용하여, 모델계통에 대한 다양한 시뮬레이션을 수행하여 제안한 알고리즘의 정확성을 분석하여 그 유용성을 확인하였다.
우리나라의 배전선로는 가공선로 위주로 성장하여 약40여년전부터 지중배전선로를 보급하기 시작하여 현재는 전제선로의 12.1%를 지중화하기에 이르렀다. 지중설비의 증가는 배전선로 안정화에 상당한 기여를 하였으며 일시 및 순간고장도 과거에 비해 엄창나게 줄어들게 되었으며, 이로 인하여 고장에 있어서 세계적인 수준의 전기품질을 자랑할수 있게 되었다. 하지만, 지중배전선로는 일반적으로 고장전류가 매우크고, 일단 고장이 발생하면 복구에 장시간이 소요될 뿐 아니라 고장원인을 찾는데도 상당한 어려움이 있으며, 최근에는 지상기기(변압기, 개폐기)등이 노후화 되면서 안전사고로 까지 확대되고 있는 상황이다. 때문에 지중배전선로에 적용할수 있는 다회로차단기를 개발하여 고장예방 및 고장구간 축소에 사용하고 있지만, 아직까지 보호협조 측면으로 잘 활용되고 있지 않고 있다. 따라서 본 논문에서는 현행 한전의 지중배전선로 보호기기운영 상황을 분석하고 지중 배전선로에 운전되고 있는 다회로차단기의 적합한 운영방법을 제시하여 지중배선선로 보호협조 방안을 강구하여 보고자 한다.
분산전원의 배전계통과 연계 시 역 조류, 전압변동, 고조파, 보호협조, 고장전류증가 등의 문제를 일으킬 수 있으므로 배전선로의 안정운전을 위해서는 배전선로의 원활한 보호협조를 통한 적절한 안정운전 방안이 필요하다. 따라서 본 연구에서는 분산형 전원이 연계된 배전계통에서의 리클로저와 변전소 릴레이와의 보호협조 측면에서 악영향을 끼치지 않는 분산형 전원의 연결을 OFFDAS 프로그램에 의하여 검토하여 더 효과적이고 용이한 방법으로 안정 운전할 수 있는 연계방안을 제시하고자 한다.
대체에너지에 대한 연구가 활발히 진행됨에 따라 향후 배전계통은 신 에너지 전원 등과 같은 분산형 전원과 연계되어 네트워크 형식으로 구성될 것으로 예상된다. 이러한 배전계통의 변화는 지락 및 단락 사고 시 기존의 보호협조에 있어서 많은 문제점을 발생시킬 것이며, 이러한 배전계통의 변화와 전력 고품질 요구에 대응하기 위해서는 새로운 보호협조 체계가 필요하다. 새로운 보호협조 방식의 개발을 위해 필수적인 지락과 단락사고 시 배전계통의 사고 데이터는 실제 운영 도중에 얻기 어렵다. 본 논문에서는 기존 전원시스템 및 신 에너지 전원을 포함한 새로운 배전계통의 운용시 발생할 수 있는 사고 상황을 예측하고 고장 데이터를 수집하기 위해 저압 배전선로에 인위적으로 지락 및 단락을 발생시킬 수 있는 장치의 개발에 대해 서술한다. 개발한 시험장치의 기능을 확인하기 위하여 실제 배전계통에 적용하여 지락 및 단락 시험을 수행하여 전압 및 전류 파형을 측정·분석하여 시험장치의 신뢰성과, 효용성을 검증하였다.
Journal of the Korea Academia-Industrial cooperation Society
/
v.22
no.1
/
pp.768-776
/
2021
Current protection-coordination methods use the reverse time characteristics of the T-C curve, which is not effective for a LVDC distribution system because the protective operation time of converters and DC circuit breakers is much faster than AC protection devices. Therefore, an algorithm is proposed for fault-section isolation using the fault current slope to minimize the blackout region and coordinate between converters and protection devices in a rapid and accurate manner. The method deals with the slope characteristics of a fault current, which may depend on the fault location in an LVDC distribution system. Thus, an LVDC distribution system can be operated in a stable manner by isolating the fault section selectively before the shutdown of the main converter using slope characteristics, which change in proportion to the line impedance and fault location. A 1.5-kV LVDC distribution system was modeled to verify the effectiveness of the proposed algorithm using PSCAD/EMTDC. The system is composed of a distribution substation, LVDC converter, and distribution lines. The simulation results confirm that the proposed algorithm is a useful tool for minimizing the fault section in an LVDC distribution system.
정부의 신재생에너지 확대 보급 사업에 의해 현재 한전의 배전계통에는 다수의 분산형 전원이 연계되고 있으나 기존의 배전계통은 단방향 전력계통으로 설계되어 있으며 다수의 분산전원이 연계되는 경우 배전계통에 많은 문제점이 나타나고 있다. 따라서 기존의 단방향 고장계산 방식에서 분산전원에서 기여하는 고장전류를 함께 고려하는 양방향 보호체계로의 전환 및 분산형전원 영향을 고려한 보호협조 방안이 필요하다. 본 논문에서는 다수의 분산전원이 연계된 배전계통에서 배전계통 고장시 분산전원에 의한 효과를 고려한 보호기기 정정방안을 제시하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.