In principle, even if serious consequences such as death or serious injury of a patient occur as a result of a medical accident, if the medical malpractice of a health care worker is not recognized, the health care worker is not held liable for said consequences. However, with the opening of the Korea Medical Dispute Mediation and Arbitration Agency on April 7, 2012, a system was established to compensate health care personnel for their medical malpractices only in the case of "injuries caused by medical accidents in the course of childbirth" (hereinafter referred to as "program for compensation of medical accidents"). Article 46 paragraph 1 of the current Medical Dispute Mediation Act, which is the basis of the Force Majeure Medical Accident Compensation System, stipulates that "medical accidents under delivery" claims are to be determined by the Medical Accident Compensation Review Committee are subject to the compensation project. And the details of the compensation, ratio of sharing financial resources for compensation, scope of compensation, and the guidelines and procedure for the payment of compensations are prescribed by Presidential Decree. In other words, the Presidential Decree requires the state to pay 70 percent of the compensation funds, and 30 percent of the above funds among health care providers. The Constitutional Court has decided on the 2015Hun-Ga13 that the scope of the health care institution's founders and the share of the compensation funds cannot be directly determined by the law, and that the portion delegated by the Presidential decree does not violate the Principle of Legal Protection nor Comprehensive Nondelegation Doctrine. However, this can be seen as an exclusion of accountability for force-induced delivery accidents even if there is no negligence of the medical staff. If the nature of the system is a type of social security system with a social compensatory nature, it could consider eliminating the health care innovator's cost-sharing provisions, leaving the full cost to the state. However, it is also necessary to review institutional protocols that strengthen the efforts of medical institutions in areas such as analysis of the causes of medical accidents and measures to prevent their recurrence. In addition, I think that the conclusion of the Act is in line with the purpose of the Comprehensive Wage Support Regulations that at minimum the law sets an upper limit of the compensation funds that are to be paid by health and medical institutions. Moreover, it is reasonable for the Medical Accident Compensation Review Committee to specify gestational age and weight of births, which are the criteria for compensation, under the Enforcement Decree of the Medical Dispute Mediation Act, in relation to the criteria for payment of contributions by the Medical Accident Compensation Review Committee, and to set the detailed criteria.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.15
no.2
/
pp.178-188
/
2022
The introduction of virtual power plants is actively being discussed to solve the problem of grid acceptability caused by the spread of distributed renewable energy, which is the key to achieving carbon neutrality. However, a new business such as virtual power plants is difficult to secure economic feasibility at the initial stage of introduction because it is common that there is no compensation mechanism. Therefore, appropriate support including subsidy is required at the early stage. But, it is generally difficult to obtain the cost model to determine the subsidy level because of the lack of enough data for the new business model. In this study, a survey of domestic experts on the requirements, appropriate scale, and cost required for the introduction of virtual power plants is conducted. First, resource composition scenarios are designed from the survey results to consider the impact of the resource composition on the cost. Then, the cost estimation model is obtained using the individual cost estimation data for their resource compositions using logistic regression analysis. In the case study, appropriate initial subsidy levels are analyzed and compared for the virtual power plants on the scale of 20-500MW. The results show that mid-to-large resource composition cases show 29-51% lower cost than small-to-large resource composition cases.
KSCE Journal of Civil and Environmental Engineering Research
/
v.13
no.4
/
pp.189-197
/
1993
The management of wastes within the urban landscape has become a critical concern to both local governments and inhabitants. With landfill capacities steadily decreasing, rapid growth of economy, population and urbanization, citizen awareness of the environment and public health problems occured by existing landfill sites make difficulties in selecting the landfill site. Therefore, this study has been performed to select the optimum waste landfill site using GSIS methodology to reduce the time, cost and effort. As the result of this study, we can investigate many factors synthetically which could not be handled by the former method using hands in the site selection for waste landfill, and we can carry out economically the work of selecting suitable site throughout the vast area.
The purpose of this study was to understand the weekend couples' type of residence, and to identify the factors to determine their major living place. Specifically, this study dealt with the weekend couples' psychological costs and rewards when they live apart in weekdays. The data were collected from 33 married couples from 2002 June to July about their family life history. The major findings of this study were summarized as follows: 1) the type of living together ; husband living apart on weekdays, wife living apart on weekdays, wife and child living apart on weekdays, living multi-residence. The majority of them were the type of husband living apart on weekdays. 2) children's care and education were an important factor in a couple's decision 3) weekend couples' psychological costs were such as difficulties of children's care, very fatiguing, shortage of time, and emotional isolation. In spite of all these costs, weekend couples still maintain their separate living arrangements during the week. They felt different kind of psychological costs by the type of living together. 4) psychological rewards were professional success, self-fulfillment, plenty of time to use purposely, and weekenders' relationships to their spouses might seem better than before. Socialization of child-care and household-labor are important factors to reduce psychological costs for the all weekend couples.
Journal of the Korea Society of Computer and Information
/
v.20
no.3
/
pp.125-137
/
2015
Information technology enables home-based working which is a new way to satisfy the firm and its employees. Firms are under pressure of cost reduction, and employees want to maintain balance of life between work and family. Considering the organization's capability can be the core competency, firm's efforts to acquire workers' commitment have been important issue in human resource management. However, researches to increase the workers' loyalty and commitment within home-base working have not been widely studied. This study tries to identify the relationships among firms' rewards supporting strategies and workers' perceived commitment with the working system as a context. Results confirm that the organization's extrinsic and intrinsic rewards affect the worker's continuous commitment, and the mediating role of normative commitment between workers' perceived affective commitment and continuous commitment has been found. Also, we empirically identify the moderating role of working systems(i.e., home-based, vs. office-based) within organization's rewards supporting strategies and workers' commitment perceptions.
The Transactions of the Korean Institute of Power Electronics
/
v.8
no.2
/
pp.143-150
/
2003
An improved MPPT converter with current compensation method for small-scaled PV-applications is presented in this paper. The proposed method implements maximum power point tracking (MPPT) by variable reference current which is continuously changed during one sampling period. Therefore, the Power transferred to the load is increased above 9% by the proposed MPPT converter with current compensation method. As a result, the utilization efficiency of Photovoltaic (PV)-panel can be increased. In addition, as it doesn't use digital signal processor (DSP), this MPPT method has the merits of both a cost efficiency and a simple control circuit design. Therefore, it is considered that the proposed MPPT method is proper to low power, low cost PV-applications. The concept and control principles of the proposed Un moth()d are explained in detail and its validity of the proposed method is verified through several simulated results.
In the case of a 900 MW combined cycle power plant, most of the load on the site is a rotating device and is operated at a low power factor, and the power factor decrease increases the reactive power, which causes the efficiency of the device to be consumed and unnecessary unnecessary power consumption. This study intends to present the results by installing and operating a reactive power compensation device that absorbs and removes reactive power, which is a solution to this problem, on a 6.9 kV on-board bus. As a result of application of this system, first, it was confirmed that the power factor of the rotating machine was improved to 0.22 and the load power in the house was reduced by 1.4%, and the thermal efficiency of the generator was increased by 0.1% and the power generation power by 810 kW. Next, it was confirmed that the cost of construction and operation can be reduced in the future due to economic feasibility, with a decrease of 200 million won/year in electricity loss compared to 1.5 billion won in investment, an increase of 1 billion won/year in sales, and a one-year capital recovery period.
Images displayed on a digital devices under the sunlight are generally perceived to be darker than the original images, which leads to a decrease in visibility. For better visibility, global luminance compensation or tone mapping adaptive to ambient lighting is required. However, the existing methods have limitations in chrominance compensation and are difficult to use in real world due to their heavy computational cost. To solve these problems, this paper propose a piece-wise linear curves (PLECs)-based image enhancement method to improve both luminance and chrominance. At this time, PLECs are regressed through deep learning and implemented in the form of a lookup table to real-time operation. Experimental results show that the proposed method has better visibility compared to the original image with low computational cost.
Korean electricity market is a Cost-Based Pool (CBP) designed to minimize electricity production cost through cost by providing cost reduction incentives to generators. Generation companies have shown diverse efforts to reduce costs in CBP market such as procuring low-price fuels, installing high efficiency gas turbine and constructing power plants near the heavy-load site. Recently, as a way to improve CBP market, a proposal to exclude no-load cost from System Marginal Price (SMP) and to compensate generators ex post was suggested to Korea Power Exchange. This study analyzes the impact of excluding no-load cost from SMP on the cost reduction incentive of generators. We found that excluding no-load cost from SMP enhances the likelihood of decreasing the cost reduction incentives of LNG combined-cycle generators lying on the price-setting range.
Designing cost-effective service recovery strategies mix has been recognized one of important issues by both service researchers and practitioners. In spite of the rising interest in them, there has been scarce studies on them. In this paper, we try to find cost-effective service recovery strategies mix via game-theoretic modeling. Especially, we focus on the possible incentives such as voucher type reward and service re-performance which have different cost structure. We investigated three questions about the topics as follows:(1) Should the service firm use the possible incentive scheme such as voucher and service re-performance for service recovery?, (2) How much voucher and service re-performance is adequate for service recovery under diverse service failure severity level?, (3) How much voucher and service re-performance is adequate for service recovery under diverse threshold level to make the customer repurchase? The results are as follows:(1) The use of both voucher and service re-performance for service recovery results in greater surplus for the service firm. (2) The higher gets the service failure severity level, the higher total incentives are required in the equilibrium. As service failure severity level gets higher, higher level of discount might be more useful to the service firm. However, service re-performance should be cut down above some critical level of service failure severity in the equilibrium. (3) The higher gets the threshold level to make the customer repurchase, the higher incentives are required in the equilibrium, and the higher portion of voucher incentive is required relative to that of service re-performance in the equilibrium.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.