Application of Discrete Event Simulation on Tunnel Muck Hauling Operations (터널 버력처리 공정의 시뮬레이션 적용성에 관한 연구)

  • Kim, Kyoung-Min;Seo, Hyeong-Beom;Hwang, Ho-Jung;Kim, Kyong-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.141-149
    • /
    • 2007
  • Simulation has considerable potential as the tool of construction management, but in the case of domestic, it is at an early stage applying simulation to micro-process assesment. For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of site. This study introduces the methodology to collect operation data of construction equipment and build the simulation model, then verifies the model with the operation data. In addition, this study identifies main factors to determine the cycle time of the muck hauling system so that it suggests the method of construction process planning through operation and combination of construction equipments.

A Case Study of Applying Electronic Detonator in Limestone Quarry (석회석 광산에서 전자뇌관의 적용성에 관한 연구)

  • ;;;Dave Kay
    • Explosives and Blasting
    • /
    • v.22 no.2
    • /
    • pp.1-11
    • /
    • 2004
  • 일반적으로 국내 석회석 광산에서의 발파는 20ms나 25ms 시차를 가지는 지발발파로 시행되어지고 있다. 국외에서는 전자뇌관을 사용하여 암반의 지질학적인 특성에 따라 지발 시차를 사용자의 현장에 따라 선정하여, 주변 보안 물건에 따른 진동 및 소음을 경감하면서, 1회 발파의 생산량을 증대할 수 있으며, 2차 파쇄 비용 및 적재비용을 절감하는 최적의 시차를 적용하여 발파 규모를 줄이지 않는 발파패턴을 적용하고 있다. 본 연구는 해외에서 사용되고 있는 전자뇌관을 국내 현장 석회석 광산(단양)에 적용함으로 최적지연시차를 찾아내는 방법과 초시의 오차에 따른 문제점과 향후 국내 적용성을 판단하고자 하였다. 대규모 석회석 광산을 대상으로 최적시차를 판단하고자 동일 패턴에서 시차를 6ms ~ 30ms로 시험발파를 시행하여 4가지 요소 발파진동속도, 주 주파수특성, 파쇄입도, 암석 이동 및 버력의 상태를 분석하여 각 시차에 따른 배점을 두어, 당 현장에 요구되는 개별 가중치를 선정하여 분석하였다. 분석 결과 당 현장에서의 발파결과에 따른 요소별 가중치를 발파진동속도(20), 주 주파수 특성(20), 파쇄입도(40), 암석 이동(10) 및 버력의 상태(10)로 하여 분석한 결과 15ms가 최적시차로 나타냈다. 향후 각 현장에 적합한 요소별 가중치를 선정하여 현장별 최적시차를 도출한다면 최적의 발파효과를 있을 것으로 판단된다.

Productivity Analysis of Tunnel Muck Hauling Operations (터널 버력처리 공정의 생산성 분석;경부고속철도 원효터널을 중심으로)

  • Hwang, Ho-Jung;Kang, Chan-Sung;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.827-831
    • /
    • 2007
  • For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of site. This study introduces the methodology to collect operation data of construction equipment and build the simulation model, then verifies the model with the operation data. In addition, this study identifies main factors to determine the cycle time of the muck hauling system and offers reasonable decision making data using the simulation based planning of construction equipment operation.

  • PDF

Development of Mucking Process Simulation Model for Productivity Improvement in Tunneling Operation (터널 버력처리 공정의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • So, Byoung Gak;Woo, Sung Kwon;Lee, Si Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.83-91
    • /
    • 2008
  • This study establishes the model to estimate a work time and a machine equipment combination in a NATM tunnel. Also it includes the increasing rate of haulage distance in the model for to make near to reality model. A simulation model focuses on the mucking process which affects the work effectiveness very highly to plan of machine use in tunneling operation. With the analysis of work effectiveness through tunnel simulation model, it is defined the problem of planning phase. Also it shows the optimal working time and efficiency of machine used through change the number of dump truck and haulage distance.

The Improvement of Tunnel Construction Cost Standards Considering the Site Conditions in Korea (현장실태를 고려한 국내 터널공사 공사비산정기준 개선)

  • Ahn, Bang-Ryul;Lee, Han-Soo;Oh, Jae-Hoon;Song, Tae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.26-35
    • /
    • 2020
  • Tunnel construction is an important part of Korean public construction projects. Although the development of various equipment and technologies has led to advances in tunnel construction methods that are implemented on sites, the cost standards related to such works do not yet reflect the realities of the construction sites. A literature review and site surveys were conducted to suggest reasonable cost standards for tunnel work that reflects the realities of the field. First, each item in the cost standards for tunnel work, as established in the Construction Standard Production Rates, were analyzed. The results were compared with the actual costs implemented on tunnel projects. The key items analyzed included those regarding the work cycle time, such as rock classification, profiling survey, drilling speed, and muck-disposal processing equipment combination, as well as the number of people put to tunneling work. Based on the site survey results, improved estimates regarding the cycle time per one tunnel drilling blast, drilling speed of the machine, muck disposal processing equipment combination, and the number of people put to tunneling work were suggested. This study suggests the cost standards that reflect the realities of tunneling sites. The results are expected to help ensure adequate costs for tunnel construction projects.

Visualization and Optimization of Construction Schedule Considering the Geological Conditions in the Complicated Underground Cavern (지하비축기지 건설시 지질조건을 고려한 건설공정의 가시화와 최적화 사례)

  • Choi, Yong-Kun;Park, Joon-Young;Lee, Sung-Am;Kim, Ho-Yeong;Lee, Hee-Suk;Lee, Seung-Cheol
    • Tunnel and Underground Space
    • /
    • v.19 no.3
    • /
    • pp.167-173
    • /
    • 2009
  • Underground storage cavern is known as the most complicated underground project because of the complexity of construction schedule, tunnel size, and geological problems. In order to optimize the construction schedule of underground storage cavern, two up-to-date technologies were applied. The first technology was 3 dimensional visualization of complicated underground structures, and the second was 4 dimensional simulation considering construction resources, geological conditions and construction schedule. This application case shows that we can achieve optimized construction schedule in the ways to optimize the number of work teams, fleets, the sequence of tunnel excavation, the commencement time of excavation and the hauling route of materials and excavated rocks. 3 dimensional modeling can help designer being able to understand the status of complicated underground structures and to investigate the geological data in the exact 3 dimensional space. Moreover, using 4 dimensional simulation, designer is able to determine the bottle neck point which appear during hauling of excavated rocks and to investigate the daily fluctuation in cost.

A fundamental study of slurry management for slurry shield TBM by sea water influence (해수의 영향에 따른 이수식 TBM의 슬러리 관리를 위한 기초적 연구)

  • Kim, Dae-Young;Lee, Jae-won;Jung, Jae-Hoon;Kang, Han-Byul;Jee, Sung-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.463-473
    • /
    • 2017
  • Bentonite swells when it comes into contact with water and makes it a viscous fluid. Thus it is widely used in civil engineering works for waterproofing. Utilizing the properties of bentonite, the slurry shield TBM supports excavated face with pressurized slurry as well as transporting excavated muck. When bentonite is in contact with seawater, due to the change of double layer thickness, its expandability and viscosity are lowered. This may cause problems for excavation stability and muck discharge due to the increase of sea water inflow when Slurry TBM is used under sea water conditions. In this study, the change of slurry condition caused by the inflow of sea water during tunnel excavation with Slurry TBM was investigated and a slurry management guideline was proposed. For this purpose, a laboratory test was carried out based on the slurry management criterions applied in the field, and a method applicable to the field where sea water is affected has been proposed.

Event Oriented Modeling Approach on Tunnel Muck Hauling Operations (터널 버력처리 공정의 시뮬레이션 모델 구축에 관한 연구)

  • Kim, Kyoung-Min;Seo, Hyeong-Beom;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.574-578
    • /
    • 2006
  • Simulation has considerable potential as the tool of construction management, but in the case of domestic, it is at an early stage applying simulation to micro-process assesment. For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of the fields. This study introduces the methodology to build the simulation model, then verifies the model with the operation data.