Consumer Awareness Analysis of Residential Building Underground Structure Leakage Prevention Measurements (공동주택 지하공간 누수 예방 기술 정책 수립을 위한 소비자 인식 분석 연구)

  • Han, Yoon-Jung;Oh, Kyu-Hwan;Kim, Su-Ryon;Kim, Byoung-Il;Oh, Sang-Keun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.4
    • /
    • pp.379-387
    • /
    • 2016
  • In this study, a survey was conducted on the required measurement and waterproofing performance for residential building underground structure leakage prevention system. According to the results of the survey, it has been determined that leakage problem is considered to be quite severe, and many respondents have agreed. The legal guidelines and regulation systems do not reflect properly on the environmental requirements or conditions, resulting in continued leakage problem. In regards to this, a standardized waterproofing technique that can be used in underground areas of residential structures is required as an obligation and the development of high performance waterproofing method that allows for wet concrete surface adhesion and a guideline, design and maintenance method that allows the control of overall situational control of leakage is required.

Performance Evaluation System for Construction Environment of the Unified Waterproofing-Root Resistance Membrane layer of the Green Roof System (인공지반 녹화용 방수방근 복합공법의 시공환경을 고려한 성능평가 시스템 연구)

  • Park, Chang-Hwa;Oh, Sang-Keun;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.189-199
    • /
    • 2011
  • Installation of a proper root barrier in a green roof system is very important in order to protect the concrete slab of roof and the root penetration in the waterproofing layer. To select the proper root barrier materials and methods, it is necessary to understand the environmental conditions affecting the waterproofing-root barrier system in green roof construction site. Therefore, we suggested as the environmental performance indexes four kinds of performance requirements; root penetration, chemical attack by chemical agent or fertilizer, load impact by soil depth and size of plant, and water pressure. The related four test methods were suggested for the inspection of these performance indexes. In this research, we could suggest for kinds of test methods as standard test methods to evaluate the environmental performance of waterproofing-root barrier for greening roof system.

Direction to Develop Domestic Technology for Waterproofing and Root Penetration Resistance in Comparative Study of Overseas Technology on Green Roof System (국내외 옥상녹화 기술현황분석을 통한 국내 방수.방근기술의 개선방향연구)

  • Kwon, Shi-Won;Bae, Kee-Sun;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.13-17
    • /
    • 2007
  • The green roof industry have been developed with Europe, North America, Japan. At the same time, being recognized the important of green roofs in domestic industry and we just start to develop the relative technology as analyzing the future direction of advanced technology. Recently, local self-government including Seoul support the system for green roof which provide 50% of working expenses form of Matching Fund by Seed Money. As years go by, the number of build up the green roof has gradually increased to be proved. At this result caused by management of system in government, unstructured construction system, low development of support technology. In this study as analyzing the present of technical development, supporting by law and system for the advanced waterproofing and root penetration resistance technology, we suggest the development direction of it to be compared with application advanced technology and we could strengthen the international competitiveness to be industrialized the green roof considering system, technology, human infrastructure.

  • PDF

Adhesion Performance of Electromagnetic Induction Heating Pixture for the Integration with a Waterproof & Root Barrier Sheet and a Roof Green Unit System (방수·방근시트와 옥상녹화 박스유닛 시스템의 일체화를 위한 전자기 유도가열 융착 고정구의 부착성능)

  • Oh, Chang-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.463-469
    • /
    • 2018
  • A currently used roof green system with multi layers has a low constructability. Therefore a new integrated waterproof & root barrier sheet and roof green box unit system was developed using steel plate fixture and cone type fixture by electromagnetic induction heating method. This study was proceeded to evaluate adhesion performance of two types of fixtures on Engineering PE, TPO, PVC sheet in a normal condition, repeated heating and cooling condition. As a result, adhesion load on Engineering PE sheet showed the highest value. The adhesion loads of steel plate fixture showed higher value as heating temperature was getting higher. However adhesion loads of cone type fixture showed opposite tendency. Regarding to the test conditions, test results of normal condition, repeated heating and cooling condition showed same value. The cone type fixture using butyl tape showed 7 times lower adhesion load than that of cone type fixture using electromagnetic heating and 28% lower adhesion load in a repeated heating and cooling condition than a usual condition.

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.

Installation of Pilot Plant and Troubleshootings of Horizontally Linked Helical Turbines with Unconfined Free Flow Condition in Artificial Channel (인공수로에서의 수평 배열 헬리컬수차 현장시험 사례와 문제점)

  • Kang, Keum-Seok;Kim, Ji-Young;Lee, Kwang-Soo;Myung, Cheol-Soo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.626-629
    • /
    • 2007
  • 국내외에 아직 개발 실적이 없는 발전소의 해수방류수를 이용한 조류식발전시스템의 개발을 위하여, 현재 하동화력발전소 해수방수로를 대상으로 헬리컬 수차를 이용한 조류식발전 시험설비를 제작 완료하고, 성능 시험이 진행 중이며, 본 연구에서는 성능 시험 과정에서 나타난 제반 문제점을 제시하고 그에 대한 원인 및 대책을 분석해 보았다. 본 시험설비는 인공수로에서 수평 배열 헬리컬수차로서 기계장치의 안정성 및 수차의 효율을 평가하고자 하였다. 조류식 시험장치는 배수로의 빠른 유속으로 인하여 시공이 매우 어려웠으며, 인공수로임에도 불구하고 유지관리를 위한 적정 구조 선정이 곤란한 상황이었다. 또한, 헬리컬 수차는 서로 직렬연결되어 운전할 수 있는 장점이 있으나, 본 연구와 같이 다수의 수차가 연결될 경우, 보다 높은 축정렬 정확성, 커플링, 베어링 정밀도 등이 요구되어 효율 감소의 원인이 됨을 확인하였다. 본 장치는 시험용으로서 정밀한 베어링 및 수밀구조, 증속장치를 채택하지 않았으나, 상업용에서는 이를 개선할 필요성이 있다고 판단된다. 또한, 수차의 설치와 유지관리 조건 향상, 수차 통과부의 유황 개선, 수차의 효율 향상을 위하여 조류식 수차에도 유도수로와 casing, draft tube와 같은 Confined flow 구조를 일부 채택할 필요성이 있다고 판단된다.

  • PDF

Deduction of Considerations During Design and Construction by Analysing Domestic and Abroad Case Analysis of Freeform Building Envelope (국내외 비정형 건축물 외피시스템 사례 분석을 통한 설계 및 시공시 고려사항 도출)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.84-96
    • /
    • 2013
  • Recently, architectural design has been changing from formal design to freeform design due to the digitalization of construction industry. Especially, the formal design has been accepted as a design trend recently and applied many times as a design concept in the architectural design competitions such as turn-key. However, various deflects such as water leak and cracks have been occurred because the traditional construction methods had been applied without any revision or adaptation of the formal construction method for the freeform building construction. Design and construction of freeform building has been developed as an new method in order to solve the problems and minimize the construction duration and cost for the freeform building. Therefore this research deduced the positive implications for developing freefrom envelope by analyzing the domestic and abroad cases and proposed the considerations during design and construction of the freeform envelope as follows. First, the freeform design should consider the constructability for the freeform envelope. Second, manufacturing technology for the two-way curvature of the unit panel should be developed. Third, exposed concrete form method should be developed for the freeform envelope of concrete. Forth, material characteristics, construction method and facility management should be considered in order to manage precipitation and keep water-proof according to the classification of the freeform envelope area.