• Title/Summary/Keyword: 방수공사

Search Result 51, Processing Time 0.019 seconds

Critical Management Factors of Fluid-Applied Membrane Waterproofing Work for building basements (지하층 도막방수공사의 중점관리요인)

  • Kwon, Hae-Rim;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.91-98
    • /
    • 2009
  • One role of waterproofing work is to block external moisture and water. Defects in waterproofing work in building construction brings on huge repair costs for related construction work as well as for the waterproofing layer itself. However, we don't have a quantitative probabilistic management method for waterproofing work to successfully anticipate and prevent defects. From an analysis of the literature and prior research, defects in the waterproofing work in the underground parts of buildings occur frequently. We selected Fluid-Applied Membrane waterproofing work as representing waterproofing work in the underground parts of a building, and researched the general types and causes of defects. In this study, we developed the Relative-FMEA (Failure Mode and Effect Analysis) approach that merges the Matrix method and FMEA. From a survey of experts, we deduced the most important management factors for Fluid-Applied Membrane waterproofing work for the underground parts of buildings.

A Study on the Quality Control Plan for Waterproof Construction in Apartment Houses (공동주택 방수공사 품질관리 방안 마련에 관한 연구)

  • Kim, Kwang-Ki;Kim, Byoungil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.109-120
    • /
    • 2024
  • For successful waterproofing construction, it is very important to secure construction quality as well as material performance of waterproofing materials used in construction. Due to the long-term cost reduction policy following the economic downturn in the construction market, most construction companies are using general low-priced waterproof materials rather than high-quality waterproof materials without clear quality control standards. Without clear education on construction, construction is being carried out with meaning only on construction activities. In addition, the waterproofing method applied in combination is a situation where water leakage occurs due to waterproofing failure due to insufficient construction quality because the construction method is complicated. Therefore, it is necessary to review the quality control measures(design, materials, construction) for successful waterproofing work and improve problems that are derived so that stable waterproofing work can be done. In order to expect the leakage prevention effect of a building, first, it is required to select appropriate materials for each part of the building and environment in the design stage, and the selected materials must satisfy all items of the Korean Industrial Standard(KS). Second, to secure the quality of waterproofing construction, sincere construction by workers is required. In this paper, we tried to describe "review of waterproof design", "constructor education", "site inspection", and "criticism(correction/supplementation)" as quality control measures after material selection.

A Study on the Work Crew Based for the Estimation from Construction Analysis of Cement Liquid Waterproofing in Apartment House (공동주택 시멘트 액체방수 공사의 현장분석을 통한 작업조 기반 품셈에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.121-128
    • /
    • 2010
  • This study aims to make improvements to the standard estimation process used to estimate reasonable costs for construction work, and to suggest a work crew based estimation using a new cost estimation model. In addition, work crew shift combination and construction process were systematically organized in order to improve the estimation technique and the construction capability of the cement liquid waterproofing work for apartment buildings. In addition, in terms of manpower and productivity, analyses were performed on the cement liquid waterproofing work for apartment buildings with net areas between $84-85m^2$ and $125-184m^2$, and the results were then compared with those calculated using the conventional work-crew based estimation method. Through this study, when the results of this study and those calculated by the conventional method were compared, for apartments with the net area of $84-85m^2$, the differences between specialists were shown to be 1.91 times to 2.13 times on average, while they were 8.82 times to 9.52 times between normal workers on average. For apartments with the net area of $125-184m^2$, the differences betweenspecialists were shownto be 1.89 times to 2.07 times on average, and 8.57 times to 9.38 times on average between normal workers.

Enhancing Construction Productivity and Quality Through Waterproofing Equipment Technologies (생산성 및 품질향상을 위한 방수공사의 장비 활용 시공기술)

  • Kim, Han-Sic;Ha, Jung-Soo;Lee, Young-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.429-440
    • /
    • 2023
  • This research investigates the deployment of waterproofing technologies in construction, with a specific focus on augmenting worker safety, work environment, and solve the difficulty of securing skilled workers. Implementing liquid waterproofing cement equipment resulted in a remarkable increase in adhesion performance by around 20%, coupled with a twofold acceleration in operational speed. The application of primer spraying apparatus led to a two-fold improvement in both penetration and adhesion performance, concurrently boosting the work speed by approximately the same factor. With urethane spraying equipment, the workload could be reduced to a third for the same layer thickness, adhesion performance enhanced by approximately 1.4 times, and workability improved by about 1.4 to 1.5 times. These findings suggest that such technological interventions can potentially enhance work efficiency, improve the quality of output, and mitigate safety accidents that are commonplace in manual operations. Furthermore, these advancements present promising solutions to the ongoing challenges of sourcing highly-competent workers in the industry.

A Study on the Defect Causes Type for Poly-Urethane Waterproofing in Roof (옥상 방수에 있어서 폴리우레탄 도막방수의 하자발생 유형에 관한 연구)

  • Shin, Hyung-John
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.128-134
    • /
    • 2005
  • Up to now, the various water proofing methods and materials have been developed. For the water proofing methods, poly-urethane membrane method is one of the commonly used and increase market share in water proofing industry due to it's many advantages. However, in spite of it's many advantages over other water proofing methods, water proofing defect occurs frequently. With this respect, the study investigate water proofing defect causes in roof water proofing. The study investigate 13 water proofing construction site in Sunchon city in oder to find urethane membrane defection causes and their type. As a results of the study, the followings are founded. 1) Among various water proofing defection causes, problems of water remain phenomenon due to surface horizontal level defect which occupy $25\;\%$ of total defect causes is the most commonly occur. 2) The second defect cause which occupy $15\;\%$ of total defect causes is the swell up phenomenon due to surface dry problem. For the prevention of water proofing defection in roof using urethane membrane, the followings are recommended. 1) Faultless surface treatment before using urethane membrane 2) Develop improved urethane membrane material 3) Improve urethane membrane construction technique

An Analysis on the Revision Factors of Construction Cost Calculation Criteria through Field Survey of Waterproof Work (방수공사 현장시공실태에 따른 공사비산정기준 개정요인에 관한 연구)

  • Oh, Jae Hoon;Ahn, Bang Ryul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.468-477
    • /
    • 2019
  • This study analyzed the major contents and results of revision through an analysis of the specifications and the field survey to revise the construction cost calculation criteria. The result of the survey found that the background processing difficulty was reduced due to an improvement of the quality level of the field floor, and the enhancement of the material's function brought a decrease in construction time and the application of various construction methods. In addition, the application of combined waterproofing methods using more than one material was increasing and the productivity differed according to the site and location. Based on these results, waterproof items were subdivided and applied to the composite construction method, and the input items were differentiated according to the material and construction method. The adequacy of the construction calculation criteria was ensured by presenting the criteria classified according to the construction area, and deleting the items that are not applicable and amending them to make them suitable for the specifications by reflecting the actual conditions of the construction on the site.

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

Waterproof of small NATM Telecommunication Tunnels (소규모 NATM 통신구의 완전방수)

  • Hwang Deok-Il;Kim Jung-Yun;Kang Ho-Kyoung;Lee Jong-Yong
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.202-212
    • /
    • 2005
  • 배수식 방수방식으로 지하 30m에 건설된 NATM터널 통신구를 준공 7년후 완전방수식 방식으로 변경하였다. 터널 라이닝에 30m의 수압을 작용할 경우 발생하는 단면력을 구조검토하고 배근상태가 안전한가 분석하였다. 또한 라이닝의 시공단면을 확인하기 위하여 충격반향기법(Impact-Echo Method)탐사와 GPR탐사, 배근상태를 파악하기 위하여 철근탐지기를 사용하였다. 그 결과 30m 수압에 안전할 것이라는 판단하에 배면주입 방수공법을 적용 통신구를 완전방수 하였다. 그리고 배수식 통신구를 운용하는 비용과 완전방수공사비를 분석한 결과 배출되는 지하수량이 많은 경우 완전방수시공이 경제성이 있다고 분석되었다.

  • PDF

A Study on the Effective Utilization of Sealing Methods for Waterproof (방수공사에 있어서 실링공법의 효율적 활용을 위한 개선 - 견적을 중심으로 -)

  • Kim, Chong-Woen;Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.2 s.16
    • /
    • pp.147-152
    • /
    • 2005
  • The purpose of this study is to present a rational approach for estimating the unit price and the amounts of sealing materials of the sealing works. This approach, considering field conditions and sealing materials' characteristics, can optimize the cost of the sealing works as well as that of maintenance. For the study, 10 case buildings for 3 years, built by middle size construction firm, were studied in order to investigate the unit price and the amounts of sealing materials.