• Title/Summary/Keyword: 발주제도

Search Result 230, Processing Time 0.029 seconds

AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments (지자체 공공건설사업의 발주방식 선정기준에 관한 연구)

  • Choi, Eun-A;Kim, Byung-Ok;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.111-117
    • /
    • 2009
  • With the current trend in the industry toward increasingly complex, diversified and large construction projects, advanced countries in the construction field have already introduced and applied a variety of methods for placing orders in order to cope with such changes in construction circumstances. In Korea, there have been efforts to continuously improve approaches to placing an order. With the aim of diversifying the methods of Delivery Systems, the "Technical Proposal Type Bid," and the "Design Competition and Technical Proposal Type Bid" were introduced through a revision of Korea's contract law enforcement ordinance. In line with the government's efforts, criteria for a method of placing an order that is suitable for a public construction project should be presented. This study enumerates the current issues using a survey for construction projects already placed and an analysis of the current status, and presents the selection criteria for Delivery Systems by business type as an improvement for the problem.

A Study on the Conceptual Design of Integrated Management System for Public SW Project Information (공공 소프트웨어(SW) 사업정보 통합 관리체계의 개념적 설계에 관한 연구)

  • Shin, Kitae;Park, Chankwon
    • The Journal of Society for e-Business Studies
    • /
    • v.24 no.2
    • /
    • pp.199-216
    • /
    • 2019
  • The public SW market is 3 trillion won, which is less than 10% of the total SW market. However, due to the nature of the domestic market, it is an important market with a relatively large impact on small and medium-sized software companies. In this market, government is operating the Public SW Project Demand Forecasting System in order to support the marketing activities of small and medium sized SW companies and establish a fair market order. The current system has limitations such as lack of user convenience, insufficient analysis capability and less business connection. This study was conducted to identify the problems of these systems and to propose a new system for improving the convenience of users and expanding the information utilization of SMEs. To this end, we analyzed the requirements of each stakeholder. We proposed the 2-phased forecasting cycle, the management cycle, and the system life cycle of public SW projects and created a unified identifier (UID) so that the information of those projects can be identified and linked among them. As a result, an integrated reference model of project information management based on system life cycle was developed, which can explain the demand forecasting and project information, and the improved processes was also designed to implement them. Through the result of this study, it is expected that integrated management of public SW projects will be possible.

Development of Management Systems based on IDEF3 Modeling to Improve Owner's Competency of Implementing Green building Certification (친환경건축물인증 발주자업무 수행역량 제고를 위한 IDEF3 모델기반 관리체계 구축)

  • Park, Kyung-Rog;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.52-62
    • /
    • 2013
  • Owners' efforts to acquire Green building certification, which started in 2002, have been rapidly increasing since 2006. The causes of the increased owners' interests are due to various incentives, legal obligation, and purpose of advertising. As project owners generally are deficient in capabilities and knowledge on how to deal with administrative works on certification, they tend to fulfill the minimum requirements for certification. However, effective administration process need capabilities of identifying individual making decision point and review information. The implementation of green building certification system is expected to provide comfort to both occupants and potential users. Furthermore it contributes to reducing energy costs throughout the phase of O&M. In addition, technology innovation in green industry can be obtained. Therefore, this study is intended to support owners in order that they can clarify certification tasks and make a rational decision-making in time. For this purpose, first of all, the major decision points were selected as the gateways of green building certification process. And then management system based on IDEF3 modeling was developed for supporting owners' decision-making performance. This management system will improve owners' overall capacity in handling all the tasks regarding the certification of Green building.

법령과 고시 - 하도급대금 지급보증 등 발주자 확인제도 시행

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.313
    • /
    • pp.46-47
    • /
    • 2016
  • 정부는 하도급대금 및 건설기계대여대금 체불로 인한 하도급업체 및 건설기계대여업체의 피해를 예방하기 위해 지난 2월 3일 건설산업기본법 제34조 제7항 및 제68조의3 제6항을 개정하고 8월 4일부터 시행키로 했다. 이에 따라 국가 지방자치단체 및 공공기관 발주자는 8월 4일부터 하도급대금 지급보증서 및 건설기계대여대금 지급보증서의 교부 여부를 의무적으로 확인해야 한다.

  • PDF

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

Cost-Benefit Analysis on the Economic Effectiveness of Safety and Health Ledger (비용편익분석을 통한 안전보건대장의 경제적 효과성 분석)

  • Lim, Se-Jong;Won, Jeong-Hun;Shin, Seung-Hyeon;Seo, Jae-Min
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.409-420
    • /
    • 2021
  • The safety and health ledger system, which gives the responsibility of safety and health management for construction site workers to the construction project owner, was introduced as part of the overall revision of the Occupational Safety and Health Act. There is a need to explain the system's effectiveness in terms of economic feasibility to solve the execution problem of the system caused by low awareness and implementation rate. In this study, the economic effect of implementing the safety and health ledger system was analyzed using cost-benefit analysis based on the data discussed at the time of the introduction of the system. Results show that creating and managing the design safety and health ledger caused additional costs in implementing the system. As a result of comparing the cost of preparation and the direct and indirect benefits caused by the reduction of industrial accidents, the benefits were evaluated higher than the costs. Thus, it is thought that the safety and health ledger system reduces construction work accidents and generates economic effects.

Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project (공공토목사업 CM 발주를 위한 단계별 업무지원 시스템 구축)

  • Chae, Yeong-Seok;Park, Seo-Young;Moon, Hyoun-Seok;Kim, Seon-Yeong;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.81-92
    • /
    • 2011
  • Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. study configured a business breakdown structure for CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery.

An Analysis of the Conditions for Construction Supervision Fee (책임감리 용역 대가의 실태 분석 연구)

  • Choi, Sun-Hee;Choi, Hye-Mi;Lee, Jae-Young;Kim, Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.283-288
    • /
    • 2007
  • As constructions are changing variously from the size and efficiency, the role of supervision services tend to reach beyond mere monitoring or supervision to prevent fraudulence, but tend to extend toward a system that manages all the stages of the construction industry. There are growing demand to improve government operated corporation systems to secure high quality public facilities, and reviews on construction supervision system and supervision services roles, function, responsibility and obligations have been the topics among advanced researchers. However, the circumstance is that researches on the construction supervision service compensation and supervision services assignment criteria that serve as basis of such construction supervision system improvement are insufficient, and for practical development of construction supervision system, researches on construction supervision service compensation and supervision services assignment criteria will need to precede. Hence, this research purports to propose improvement directions of construction supervision system by deducing problems through condition survey on the construction supervision services ordered by public organizations.

  • PDF

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

Identifying the perception on the introducing of Construction Management(CM) in the civil infrastructure project delivery system (사회간접자본 프로젝트의 CM제도 활성화방안에 대한 인식분석 연구)

  • Jang, Won-Suk;Lee, Sang-Uk;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.91-100
    • /
    • 2013
  • Current environment in civil and construction industry has changed to actively adopt construction management (CM) in various areas. While it is found that exemplary CM projects have been carried out in many civil engineering sectors, concrete system framework has not been suggested due to ambiguous boundary between CM and supervision system, unclear perception of CM's role, and inexperienced organization and regime. This paper investigated the challenges faced in civil and construction industry, and analyzed the strategy that could improve the current immature CM system by conducting questionnaire survey from experts in various construction sectors. The results could provide valuable information that can involve diverse opinions and view points in project participants.