• Title/Summary/Keyword: 발주자 특성 분석

Search Result 58, Processing Time 0.023 seconds

A Study on Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (계층화분석법에 의한 BTO 민간투자사업 협상의 주요쟁점 특성분석에 관한 고찰)

  • Roh, Tae-Ho;Kim, Jong-Won;Lim, Chang-Sik;Lee, Jong-Chool
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.137-146
    • /
    • 2008
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (AHP 기법을 이용한 BTO 민간투자사업 협상의 주요쟁점 특성분석)

  • Roh, Tae-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.8
    • /
    • pp.234-244
    • /
    • 2007
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities (초·중·고등학교 시설물별 추정공사비 산정모델 개발)

  • Jung, Eui-Hyun;Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.69-78
    • /
    • 2021
  • Estimated construction cost is an important index to secure an optimal budget which needs to go into construction projects in the previous of basic design phase. In order for public institutions to calculate the estimated construction cost, the cost per unit area of public buildings is used. However, the current calculation method of the estimated construction cost in public buildings is impossible to reflect the characteristics of many facilities and combinations. The purpose of this study is to develop an estimation model in the previous of basic design phase for the elementary, middle and high school facilities. it is expected that it is possible to estimate the construction cost of the elementary, middle and high schools in a reasonable and reliable manner through the estimation model developed in this study.

A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model (기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.119-128
    • /
    • 2015
  • Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.

Development of Survey Framework for Prevailing Wage in the Construction Industry (건설분야 적정임금 산정을 위한 임금조사 프레임워크 개발)

  • Lee, Ju-hyun;Baek, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.138-147
    • /
    • 2020
  • The construction field is one of the most representative job creation businesses, but it has been pointed out that the overall quality of the jobs is low because of the nature of the order-made production industry, such as unstable employment structure, aging workforce, etc.. Accordingly, the government plans to implement the "prevailing wage system" that guarantees a minimum wage for construction site workers. In reality, however, only a market wage could be used for a construction cost estimation because there was no standard for the prevailing wage. A comparative analysis of the prevailing wage and market wage was performed. This paper proposes a framework for estimating the reasonable prevailing wage in the construction industry. The results showed that the prevailing wage was estimated to be 4.7% lower than the market wage when the proposed framework is applied to the carpenters' case. This suggests that the proposed model could be used as an alternative for market wage considering the original purpose of the prevailing wage. This study will construct the basic data for scientific analysis on the wage, and finally, help estimate the reliable prevailing wage in the future.

Intra-ethical Characteristics Occupational Factors Impact on Business Competitiveness (Focused on Types of Construction Work) (기업내 직종별 윤리적 특성요인이 기업경쟁력에 미치는 영향(건설 직종을 중심으로))

  • Kim, Dong-Uk;Jeon, In-Oh
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.3
    • /
    • pp.335-351
    • /
    • 2012
  • This study is an empirical analysis completed based on a survey of the members of major construction companies and is analyzed to verify the relationship between the ethical characteristics of major construction companies and firm's competitiveness and its effects. In this study, based on previous researches in domestic and foreign, the factors that are affected by the business ethics were analyzed, and the competitiveness of firms, which is a dependant variable, was divided into four different types: quality, price, sales, and promotion. The proposal and final conclusion regarding the relationship between job satisfaction and concentration was made after the investigation of research hypothesis. The conclusions described below:(By the Linear regression analysis) 1. The product competitiveness is affected by moral competence, will to act ethical management, transparency of fairness, customers, and social responsibility. 2. The price competitiveness is affected by will to act ethical management, transparency of fairness, customers, and social responsibility.

A Case Study on the Calculation of Delay Damages for Contractors according to the Extension of Contract Period (계약기간 연장에 따른 시공자의 손실비용 산정에 관한 사례 연구.)

  • Lee Gi-Han;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.305-310
    • /
    • 2001
  • The purpose of this study is to calculate delay damages for contractors. The study has been performed by investigation of delay cost occurrence status and the analysis of subway construction cases. The results of this study are as follows: 1. Delay cost( 1day) equivalent to $0.005\%$ of total construction cost by analysis case studies. 2. Including bank interest, dealy cost is analysed as the following; $1.1\~9.2\%$ of total construction cost in part extension period, $3.3\~11.0\%$ of total construction cost in total extension period. 3. In comparison between liquidated damages and delay cost, liquidated damages account for average 20.1 times of delay costs. 4. Acceleration cost will be calculate on the basis of delay cost calculation method. In the result of this method, acceleration cost is equal to delay cost at least or must be large than delay cost

  • PDF

A Proposition on Reasonable Termination Procedure in Remaining-oil Recovery Work from a Sunken Tanker in Korean Territory (국내 침몰유조선 잔존유 회수작업의 합리적 종료절차 제안)

  • Kang, Kwang-Gu;Shim, Yoo-Taek;Kang, Sin-Young
    • Journal of Navigation and Port Research
    • /
    • v.38 no.4
    • /
    • pp.379-384
    • /
    • 2014
  • In case of sunken tankers, remaining-oil recovery operation should be conducted due to possible oil spill accident. However, the deep sea operation make difficulties in checking the completion of remaining oil recovery process, therefore the work termination procedure is very important. In this paper, a reasonable work termination procedure through the comparison and analysis of two cases(Youil No.1 and Osung No.3, Kyung-Shin) which were performed in different method, using disparate equipment. By investigating previously applied methods and techniques, work speed, safety and expenses were compared. The proposed ending procedure of the remaining-oil recovery project is to recover the remaining oil from each cargo tanks and to clean up such tanks whilst an independent surveyor proceeds to a confirmation procedure whereby said surveyor checks out whether any remaining oil exists by putting a stick in each cleaned up tanks and opening up the hatch cover of the tanks or the top place of the tanks to confirm the cleanness of oil. Such procedure shall be done through discussion by the ordering party, contractor and the independent surveyor all together with a flexible application.

Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.

A Study on Change order factor analysis for military facility projects (군 시설사업의 설계변경 요인분석을 위한 기초연구)

  • Jung, Woo-Seung;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.127-134
    • /
    • 2016
  • Design modification is one of the elements that must be controlled in the process of any construction project. Especially a military facility project comes with more obstacles than private work due to the unique characteristics and closeness of the military. As there are both the project manager and the user within the ordering body, it is likely to have difficulties unless communication is conducted smoothly. The reason is that such issues regarding communication lead to design modification and it will result in the user's dissatisfaction. Thus this study aimed to identify the elements that generally cause design modification by analyzing characteristics of military projects from the status of current project contracts, analyzing past elements that lead to design modification and comprehensively researching responds from the survey on operators of facility projects. It is expected that loss from design modification of military facility projects is reduced by proposing feasible and practical improvements.